| AL |
2608 |
Alabama |
Widen CR-52 from Helena to US-31 |
15,000,000 |
|
| AL |
2516 |
Alabama |
To
pro vide four lanes on US-80, Perry. County, Marengo County, and Sumter
County |
14,000,000 |
|
| AL |
256 |
Alabama |
Construct
Anniston Eastern Bypass from Golden Springs Road to US Hwy 431 |
12,500,000 |
|
| AL |
322 |
Alabama |
Construction
of Patton Island Bridge Corridor |
10,000,000 |
|
| AL |
2952 |
Alabama |
Construct
County Road 83 corridor from Foley Beach Express to 1-10 |
10,000,000 |
|
| AL |
1448 |
Alabama |
1-65
Widening from Us. 31 in Alabaster (Exit 238) to AL 25 in Calera (Exit 228) |
8,000,000 |
|
| AL |
177 |
Alabama |
Construction
of Valleydale Road Flyover, Widening and Improvements |
5,000,000 |
|
| AL |
1310 |
Alabama |
Construct
extension of 1-565 weslwardfromexisting interchange to existing Tennessee
River bridges at Decatur, |
5,000,000 |
|
| AL |
2723 |
Alabama |
Construction
of Sulphur Springs Road Bypass in City of Hoover, Alabama |
5,000,000 |
|
| AL |
104 |
Alabama |
Widen
Hiy. 84 to 4 lanes west of 1-65 from Evergreen to Monroeville and beyond to
the State of AL line |
4,000,000 |
|
| AL |
940 |
Alabama |
1-20
widening and safety improvements in St. Clair County |
4,000,000 |
|
| AL |
921 |
Alabama |
Widening
and safety improvements to SR-21 6 between SR -215 and 1-59, 1-20 |
3,000,000 |
|
| AL |
1129 |
Alabama |
Expand
SR-167 from Troy, AL to Enterprise, AL |
3,000,000 |
|
| AL |
1333 |
Alabama |
Expand
SR-210 (Ross Clark Circle) from US231 North to US231 South in Dothan, AL |
3,000,000 |
|
| AL |
1372 |
Alabama |
Expand
US331 from Luverne, AL to Montgomety, AL |
3,000,000 |
|
| AL |
1586 |
Alabama |
Expand
US-84 from Andalusia, AL to Enterprise, AL |
3,000,000 |
|
| AL |
2779 |
Alabama |
Expand
to 4 lanes on US-278 from 1-65 to US-231 |
3,000,000 |
|
| AL |
2898 |
Alabama |
AL 5 Widening in Bibb
County |
3,000,000 |
|
| AL |
3142 |
Alabama |
|
3,000,000 |
|
| AL |
3287 |
Alabama |
Construct
interchange on 1-59 between 1-59 and 49th Street in Fort Payne, AL |
3,000,000 |
|
| AL |
2265 |
Alabama |
Interstate
565 west extension towards Decatur |
2,000,000 |
|
| AL |
2872 |
Alabama |
Construct
110- US231 Connector from Dothan, AL to Florida |
2,000,000 |
|
| AL |
1485 |
Alabama |
Interchange
at 1-65 and Limestone County Road 24 Constuction |
1,000,000 |
|
| AL |
1572 |
Alabama |
City of
Vestavia Hills Pedestrian Walkway to Cross US. 31 |
1,000,000 |
|
| AL |
1831 |
Alabama |
Construct
a new interchange on 1-65 at Cuilman, AL County Road 222 |
1,000,000 |
|
| AL |
1860 |
Alabama |
Expand
to 4 lanes US Highway 278 from Sulligent to Gum |
1,000,000 |
|
| AL |
2581 |
Alabama |
Alabama
Hwy 36 Extension and Widening-Phase II |
1,000,000 |
|
| AL |
2792 |
Alabama |
Design
and construct a 4-lane highway from Muscle Shoals, AL to I-iD |
1,000,000 |
|
| AL |
3189 |
Alabama |
|
1,000,000 |
|
| AL |
1463 |
Alabama |
Construct
interchange on Interstate 85 at Beehive Road in Auburn, AL |
500,000 |
|
| AL |
1935 |
Alabama |
Construct
Talladega Mountains Natural Resource Center -an educaational center and hub
for hikers, bicyclists, and automobiles |
500,000 |
|
| AL |
2190 |
Alabama |
Construct
pedestrian urban-edge riverwalk in Montgomery, |
500,000 |
|
| AL |
2887 |
Alabama |
Pedestrian
Improvements for Fell City, AL |
200,000 |
|
| AL |
827 |
Alabama |
Pedestrian
Improvements for Homewood, AL |
100,000 |
|
| AL |
1252 |
Alabama |
Pedestrian
Impro vements for Morris, AL |
100,000 |
|
| AL |
1460 |
Alabama |
Pedestrian
Improvements for Moody, AL |
100,000 |
|
| AL |
1906 |
Alabama |
Pedestrian
Improvements for Columbiana, AL |
100,000 |
|
| AL |
2323 |
Alabama |
Pedestrian
Improvements for Leeds, AL |
100,000 |
|
| AL |
2395 |
Alabama |
Pedestrian
Improvements for Gardendale, AL |
100,000 |
|
| AL |
2541 |
Alabama |
Pedestrian
Improvements for Centerpoint, AL |
100,000 |
|
| AL |
2593 |
Alabama |
Pedestrian
Improvements for Northport, AL |
100,000 |
|
| AK |
547 |
Alaska |
Planning,
design, and construction of Juneau access roads in Juneau, Alaska |
15,000,000 |
|
| AK |
400 |
Alaska |
Unalaska, AK Construction ofAMI-fWferry terminal including
approach, staging, and upland improvements |
7,500,000 |
|
| AK |
2474 |
Alaska |
Kodiak, AK
Construction ofAMHWferiy terminal and approach |
7,500,000 |
|
| AK |
446 |
Alaska |
Westside
development Williamsport-Pile Bay Road |
5,000,000 |
|
| AK |
2263 |
Alaska |
Realign
rail track to eliminate highway-rail crossings and mprove highway safety and
transit times |
5,000,000 |
|
| AK |
2746 |
Alaska |
Road
improvements in the City of Fairbanks |
5,000,000 |
|
| AK |
2937 |
Alaska |
Road
Improvements and upgrades to service road areas and miscellaneous projects
within Northstar Borough |
5,000,000 |
|
| AK |
1661 |
Alaska |
Bogard/Sheldon
Extension in Matanuska-Susitna Borough |
4,000,000 |
|
| AK |
2283 |
Alaska |
For
Completion of the Shotgun Cove Road, from Whittier, Alaska to the area of
Decision Point, Alaska |
4,000,000 |
|
| AK |
1760 |
Alaska |
Coffman Cove 1FA
ferry terminal |
3,200,000 |
|
| AK |
161 |
Alaska |
False
Pass Road construction from small boat harbor dock to airport and town |
3,000,000 |
|
| AK |
406 |
Alaska |
Planning,
design, and construction of a bridge joining the Island of Gravina to the
Community of Ketchikan |
3,000,000 |
|
| AK |
1073 |
Alaska |
Emergency
evacuation road at Point Hope in North Slope Borough |
3,000,000 |
|
| AK |
1847 |
Alaska |
Construct
access road connection from Seward Highway to rail and airport facilities in
Seward |
3,000,000 |
|
| AK |
2465 |
Alaska |
Planning,
design, and construction of Knik Arm Bridge |
3,000,000 |
|
| AK |
3020 |
Alaska |
Construction
of and improvements to roads at Alaska Pacfic University |
3,000,000 |
|
| AK |
3191 |
Alaska |
|
3,000,000 |
|
| AK |
1938 |
Alaska |
Planning,
design, and EIS of Bradfield Canal Road |
2,300,000 |
|
| AK |
2260 |
Alaska |
Make
necessary improvements to Indian River Road in City and Borough of Sitka |
2,000,000 |
|
| AK |
777 |
Alaska |
Construct
linking road from airport to port in Akutan |
1,500,000 |
|
| AK |
137 |
Alaska |
Keystone Drive Road
Improvements |
1,000,000 |
|
| AK |
494 |
Alaska |
Citywide
pavement rehabilitation in City of North Pole |
1,000,000 |
|
| AK |
1047 |
Alaska |
Bridge
over Fish Creek in Matanuska-Susitna Borough |
1,000,000 |
|
| AK |
1975 |
Alaska |
Point
MacKenzie in Matanuska-Susitna Borough plan and design road access |
1,000,000 |
|
| AS |
2122 |
American Samoa |
Village
road impro vements for Launiusaelua and Ituau counties in the Central
district |
3,000,000 |
|
| AS |
2123 |
American Samoa |
Village
road improvements for Tualauta, Tualatai, Aitulagi, Fofo, and Alataua
counties in the Western district |
3,000,000 |
|
| AS |
2512 |
American Samoa |
Village
road improvements for Sua and Vafanua counties in the Eastern district |
2,600,000 |
|
| AS |
1589 |
American Samoa |
To
upgrade, repair and continue construction of Ta ‘u harbor/ferry
terminalfacility on Manu ‘a island |
1,600,000 |
|
| AS |
605 |
American Samoa |
Village road improvements for Ta ‘u, Ofu, and
Olosega-Silicounties in Manu ‘a district |
1,400,000 |
|
| AS |
1556 |
American Samoa |
Drainage
mitigation in Malaeloa-Leone village roads |
1,400,000 |
|
| AS |
341 |
American Samoa |
Shoreline
protection and drainage mitigation for Nuuuli village roads |
1,000,000 |
|
| AS |
994 |
American Samoa |
Shoreline
protection and drainage mitigation for Aua village roads |
1,000,000 |
|
| AS |
3108 |
American Samoa |
|
1,000,000 |
|
| AZ |
1822 |
Arizona |
Construct
or Mod5’ Railroad Grade Separations on 6th St. and 22nd St. and Reconstruct
Speedway Blvd. Underpass in Tucson |
13,300,000 |
|
| AZ |
1064 |
Arizona |
Construct
the Rio Salado Parkway to connect I-JO and Loop 2 02 freeways to 7th Street
in downtown Phoenix |
8,000,000 |
|
| AZ |
1156 |
Arizona |
Construct link from Twin Peaks Road to 1-10 and Linda Vista |
5,000,000 |
|
| AZ |
2469 |
Arizona |
Construct
110 Collector Distributor Roadway from 40th Street to Baseline Maricopa
County, Arizona |
4,000,000 |
|
| AZ |
3071 |
Arizona |
|
4,000,000 |
|
| AZ |
1835 |
Arizona |
Replacement
of Safford Bridge which crosses the Gila River directly north of Safford, AZ
on North 8th Avenue |
3,500,000 |
|
| AZ |
1848 |
Arizona |
Realign
Davis Road from State Route 80 to State Route 191 |
3,300,000 |
|
| AZ |
1443 |
Arizona |
Construct
pedestrian and bicycle overpass at McDowell Road & 35th Avenue in Phoenix
|
3,000,000 |
|
| AZ |
2962 |
Arizona |
Construction
of Rio Salado Pedestrian Bridge in Tempe, AZ |
3,000,000 |
|
| AZ |
75 |
Arizona |
US 60 to Gonzalez Pass |
2,000,000 |
|
| AZ |
929 |
Arizona |
Kabba
Wash project between 1-40 and Wikieup |
2,000,000 |
|
| AZ |
1054 |
Arizona |
Widen SR 95
through Lake Havasu City |
2,000,000 |
|
| AZ |
1265 |
Arizona |
Bridge at 59Th
Ave and Glendale Ave |
2,000,000 |
|
| AZ |
1738 |
Arizona |
Paving
of Navajo Route 9010 -off of 1-40 at Houck, AZ (Exit 348) to Pine Springs Day
School |
2,000,000 |
|
| AZ |
3304 |
Arizona |
US
60 and US 93 connection on the eastern edge of central Wickenburg |
2,000,000 |
|
| AZ |
2447 |
Arizona |
Widen
I-JO to 3 lanes in each direction north of Tucson from Marana Interchange to
Cortato Interchange |
1,700,000 |
|
| AZ |
211 |
Arizona |
Upgrade
and Widen SR85 to I-JO (Mileposts 120 - 141) |
1,500,000 |
|
| AZ |
381 |
Arizona |
Improving
Lone Pine Dam Road in Navajo County |
1,500,000 |
|
| AZ |
1795 |
Arizona |
|
1,500,000 |
|
| AZ |
2163 |
Arizona |
Construct
bridges at Aspen St., at Birch St., at Cheriy St., at Bonito St., at Thorpe
St |
1,500,000 |
|
| AZ |
1641 |
Arizona |
Upgrade
and Re-opening of Main Street in Yuma |
1,200,000 |
|
| AZ |
414 |
Arizona |
Burro
Creek section between Wikieup and the Santa Maria River |
1,000,000 |
|
| AZ |
1115 |
Arizona |
Navajo
Mountain Road on the Navajo Nation |
1,000,000 |
|
| AZ |
2724 |
Arizona |
Pliocene
Cliffs reconstruction between Wikieup and the Santa Maria River |
1,000,000 |
|
| AZ |
2948 |
Arizona |
Construct
sidewalks along White Spar Road -Prescott, AZ |
500,000 |
|
| AR |
1771 |
Arkansas |
|
10,000,000 |
|
| AR |
163 |
Arkansas |
Construction
of 1-49, Highway 71: Arkansas portion of Bella Vista Bypass |
9,000,000 |
|
| AR |
2917 |
Arkansas |
Caraway Bridge Overpass |
7,000,000 |
|
| AR |
3302 |
Arkansas |
Springdale,
AR -- Improvements to Johnson Road. From Hwy 412 to 1-540 through Springdale
and Johnson |
7,000,000 |
|
| AR |
3204 |
Arkansas |
|
6,000,000 |
|
| AR |
1033 |
Arkansas |
Widen
to four lanes, improvement, and other development to US. Highway 167 from L4
state line north to 1-530 |
5,000,000 |
|
| AR |
2816 |
Arkansas |
Construct
and rehabilitate Fayetteville Expressway Economic Development Corridor |
5,000,000 |
|
| AR |
2834 |
Arkansas |
Construction
of 1-49, Highway 71: Highway 22 to Highway 71 near Jenny Lind |
5,000,000 |
|
| AR |
1597 |
Arkansas |
Rogers,
Arkansas - Construct new interchange on 1-540 near the existing Perry Road
overpass |
4,400,000 |
|
| AR |
1877 |
Arkansas |
Improve
State Highway 88 (Higdon Ferry Road) in Hot Springs |
4,000,000 |
|
| AR |
237 |
Arkansas |
Widen
to 5 lanes, improvement, and other development to US. Highway 79B/Univeristy
Ave. in Pine Bluff |
3,200,000 |
|
| AR |
2985 |
Arkansas |
Develop
US. Highway 71 (1-49) to Interstate standards on new location between Mena,
AR and LA state line |
3,160,000 |
|
| AR |
373 |
Arkansas |
Northeast
Arkansas Connector (relocation of Highway 226) |
3,000,000 |
|
| AR |
2082 |
Arkansas |
Van
Buren, Arkansas - Widen and reconstruct Rena Road |
3,000,000 |
|
| AR |
3241 |
Arkansas |
|
3,000,000 |
|
| AR |
3314 |
Arkansas |
Study and construction of 8th Street, in Bentonville, AR from |
3,000,000 |
|
| AR |
3149 |
Arkansas |
|
2,640,000 |
|
| AR |
1340 |
Arkansas |
Highway 165: Railroad
Overpass |
2,000,000 |
|
| AR |
2552 |
Arkansas |
Highway 67. Kiehl Avenue — Vandenberg Boulevard: |
2,000,000 |
|
| AR |
2572 |
Arkansas |
Highway 412:
Baxter Co. to Ash Flat |
2,000,000 |
|
| AR |
3030 |
Arkansas |
Russeilville
Intermodal Facility construct access roads from AR Hwy 247, purchase
Right-of- Way |
2,000,000 |
|
| AR |
377 |
Arkansas |
Bentonville,
Arkansas - widen Arkansas Highway 102 between US. 71B and the west city
limits |
1,500,000 |
|
| AR |
2546 |
Arkansas |
Interstates
3 0/440/530 Interchanges —for interchange improvements, Little Rock |
1,500,000 |
|
| AR |
13 |
Arkansas |
Bentonville,
Arkansas - widen and improve 1-540 and SH-102 Interchange |
1,420,000 |
|
| AR |
1298 |
Arkansas |
Construct
and rehabilitate University of Arkansas Technology Corridor Enhancement
Project |
1,200,000 |
|
| AR |
2947 |
Arkansas |
Hvy
65 improvements in Van Buren County, including construction ofpassing lanes,
bridge improvements, intersection improvements and
other roadway improvements |
1,200,000 |
|
| AR |
1726 |
Arkansas |
Highway 77 Rail
Grade Separation |
1,000,000 |
|
| AR |
261 |
Arkansas |
Junction
Bridge — rehabilitation & conversion from rail to pedestrian use |
800,000 |
|
| AR |
3029 |
Arkansas |
Washington
County, Arkansas - replace and rebuild Tilly Willy Bridge |
800,000 |
|
| AR |
2271 |
Arkansas |
War Eagle
Bridge Rehabilitation - Benton County, Arkansas |
640,000 |
|
| AR |
1569 |
Arkansas |
Maumelle
Interchange —for third entrance into Maumelle |
500,000 |
|
| CA |
1043 |
California |
Widen
State Route 46 between Airport Road and the Shandon Rest Stop in San Luis
Obispo County |
33,461,000 |
|
| CA |
2051 |
California |
Improve interstates and roads part of the Inland Empire Goods
Movement Gateway project in and around the formerNorton
Air Force Base |
25,000,000 |
|
| CA |
1812 |
California |
Upgrade
and reconstruct the I-80/I-680/SR12 Interchange, Solano County |
21,000,000 |
|
| CA |
2296 |
California |
Widen
Caflfornia State Route l32 from California State Route 99 west to Dakota
Avenue |
18,000,000 |
|
| CA |
2178 |
California |
Alameda Corridor East Gateway to America Trade Corridor
Project, Highway-Railgrade separation along 35 mile corridor from Alameda Corridor (Hobart Junction) to Los
Angeles/San Bernardino County Line |
15,500,000 |
|
| CA |
733 |
California |
Upgrade
CA SR 4 East from the vicinity of Loveridge Road to G Street, Contra Costa
County |
15,000,000 |
|
| CA |
2444 |
California |
Widen
Highway 101 in Mann and Sonoma Counties from Hwy 37 in Novato to Old Redwood
Highway in Petaluma |
15,000,000 |
|
| CA |
2128 |
California |
Construct
grade separation on State College Blvd. at the Burlington Northern Santa Fe
railroad, Fullerton |
14,000,000 |
|
| CA |
587 |
California |
Diamond
Bar On-Off Ramp at Lemon Ave on SR-60 |
12,000,000 |
|
| CA |
1367 |
California |
Modify
1-880 & Stevens Creek Boulevard Interchange to ease traffic congestion in
San Jose |
12,000,000 |
|
| CA |
1793 |
California |
Reconfigure
intersection at Highways 152 and 156 in Santa Clara County |
10,650,000 |
|
| CA |
429 |
California |
Seismic retrofit of the Golden Gate Bridge |
10,000,000 |
|
| CA |
954 |
California |
Construct
a new interchange where 1-15 meets Cajalco Road in Corona, CA |
10,000,000 |
|
| CA |
1176 |
California |
Study
and construct highway alternatives between Orange and Riverside Counties,
directed by RCTC, working with local transp.
authorities, and guided by the current MIS |
10,000,000 |
|
| CA |
1988 |
California |
The
Foothill South Project, construct 16 miles of a six-lane limited access
highway system |
10,000,000 |
|
| CA |
926 |
California |
Construct
highway connecting State Route 78/86 and State Route 111, Brawley |
9,500,000 |
|
| CA |
1511 |
California |
Freeway 180
Improvements Fresno |
9,500,000 |
|
| CA |
2813 |
California |
Construct
State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San
Diego |
9,000,000 |
|
| CA |
1957 |
California |
Pine Avenue extension from Route 71 to Euclid Avenue in the
City of Chino |
8,500,000 |
|
| CA |
359 |
California |
Reconstruct
1-880 & Coleman Avenue Interchange & implement other 1-880 Corridor
operational improvements in Santa Clara County |
8,000,000 |
|
| CA |
2158 |
California |
Construct
Interchange at Intersection of SR 44 and Stillwater Road |
8,000,000 |
|
| CA |
2433 |
California |
Implement
San Francisco Street Improvements Program |
8,000,000 |
|
| CA |
2788 |
California |
Design
and construct access improvements in North Central Business District,
Sacramento |
8,000,000 |
|
| CA |
2644 |
California |
Forest
Highway 171 Upper Skyway Improvement |
7,250,000 |
|
| CA |
2631 |
California |
Widen
Peyton Dr.from Grand Ave. to Chino Hills Pky., construct Eucalyptus Ave. from
Peyton Dr. to Galloping Hills, improve English
Channel |
7,036,110 |
|
| CA |
420 |
California |
Folsom Blvd. Transportation Enhancements, City of Rancho
Cordova |
7,000,000 |
|
| CA |
1440 |
California |
Reconfigure
San Fernando Road from Fletcher Drive to I-5 Fwy, Los Angeles |
7,000,000 |
|
| CA |
1943 |
California |
Construct
Guadalupe River Trail from 1-880 to Highway 237 in Santa Clara County |
7,000,000 |
|
| CA |
346 |
California |
Road
widening, construct bike path, lighting, and safety improvements on road
leading to Hansen Dam Recreation Area, Los Angeles
|
6,500,000 |
|
| CA |
3132 |
California |
Improvements/Widenening of SR 99 from Goshen to Kingsburg in
Tulare County, California |
6,200,000 |
|
| CA |
706 |
California |
Bay Road improvements between University Avenue toFordham, and
from Clarke Avenue to Cooley Landing. Northern access
improvements between University and Illinois Avenues, East Palo Alto |
6,000,000 |
|
| CA |
1239 |
California |
Complete
Monterey Bay Sanctuary Scenic Trail between Monterey and Santa Cruz counties |
6,000,000 |
|
| CA |
2149 |
California |
Replace
SR22 interchanges, construct HOV lanes, and lengthen bridges in Garden Gove |
6,000,000 |
|
| CA |
2606 |
California |
Replace
South Access to the Golden Gate Bridge—Doyle Drive |
6,000,000 |
|
| CA |
2735 |
California |
SR 52 East
Improvments (San Diego) |
6,000,000 |
|
| CA |
3120 |
California |
Completion of Interstate 5 and Interstate 8 Connectors, San
Diego |
6,000,000 |
|
| CA |
1214 |
California |
Golden
Gate National Parks Conservancy—Plan andImplement Trails & Bikeways Plan
for the Golden GateNational Recreation Area and
Presidio |
5,200,000 |
|
| CA |
2577 |
California |
Widen
1-5 to 10 Lanes and Improve Corridor Arterials, SR 91 to 1-710 |
5,200,000 |
|
| CA |
278 |
California |
Widening
the highway and reconstructing off ramps on Hwy 101 between Steele Lane and
Windsor, CA to reduce traffic and promote carpools
|
5,000,000 |
|
| CA |
525 |
California |
Construct
Route 101 Auxiliary Lanes 3rd Ave in the City of San Mateo to Millbrae Ave in
Millbrae |
5,000,000 |
|
| CA |
866 |
California |
Planning,
design, engineering and construction of Naval Air Station, North Island
access tunnel on SR 75-282 corridor, San Diego |
5,000,000 |
|
| CA |
943 |
California |
US 101
Operational Improvements, San Jose |
5,000,000 |
|
| CA |
1040 |
California |
Widen
State Route 98from Route]!] to State Route 7, Calexico |
5,000,000 |
|
| CA |
1081 |
California |
Widen
SR 12 to four lanes through Jamieson Canyon (between 1-80 and SR 29) for
safety concerns and economic growth |
5,000,000 |
|
| CA |
1134 |
California |
Improvements
to SR-67, Mapleview to Dye Road (San Diego) |
5,000,000 |
|
| CA |
1237 |
California |
Interstate
15-Base Line Road Interchange Project, Rancho Cucamonga, Calfornia |
5,000,000 |
|
| CA |
1342 |
California |
Construction
of freeway between 1-15 and US-395 |
5,000,000 |
|
| CA |
1558 |
California |
Install
new grade separation at Ranchero Road in Hesperia |
5,000,000 |
|
| CA |
1653 |
California |
Engineering,
right of way and construction of HO V lanes on I- 580 in the Livermore
Valley, Caflfornia |
5,000,000 |
|
| CA |
1930 |
California |
Conduct
study and construct CA State Route 239 from State Route 4 in Brentwood area
to 1-205 in Tracy area |
5,000,000 |
|
| CA |
2067 |
California |
Complete
the engineering design and acquire the right-of-way needed for the
Arch-Sperry project in San Joaquin County |
5,000,000 |
|
| CA |
2080 |
California |
Reduce
congestion and boost economies through safer access to the coast by
realigning Hwy 299 between Trinity and Shasta
Counties |
5,000,000 |
|
| CA |
2245 |
California |
US
101 Corridor Improvements — Route 280 to the Capitol- Yerba Buena Interchange
|
5,000,000 |
|
| CA |
2719 |
California |
State
Route 76 Road Widening, Melrose Drive to Interstate 15 |
5,000,000 |
|
| CA |
2749 |
California |
Construct
bypass along Hwy 101 around Willits, CA to reduce congestion, improve air
quality and enhance economic lifeline of No. Coast
|
5,000,000 |
|
| CA |
2821 |
California |
Conduct
study and construct Daggett Road, Port of Stockton, CA, Access Project |
5,000,000 |
|
| CA |
2885 |
California |
1-110/SR
47/Harbor Blvd. Interchange Improvements, San Pedro |
5,000,000 |
|
| CA |
3092 |
California |
Develop bicycle paths and public park space adjacent to the
New River, Calexico |
5,000,000 |
|
| CA |
3099 |
California |
Modify and reconfigure Kanan Road interchange along US101 in
Agoura Hills |
5,000,000 |
|
| CA |
3244 |
California |
Implement SFgo Van Ness Corridor Improvements |
5,000,000 |
|
| CA |
2640 |
California |
Reconstruct
and deep-lift asphalt on various roads throughout the district in Ventura
County |
4,856,000 |
|
| CA |
2639 |
California |
Port
of Hueneme Intermodal Access Improvement Project, including grade separation
at Rice Avenue and State Route 34; widen Hueneme
Road |
4,700,000 |
|
| CA |
15 |
California |
Reconstruct and deep-lift asphalt on various roads thorughout
the district in Santa Barbara County. |
4,644,000 |
|
| CA |
143 |
California |
State
Route 86S and Ave 66 highway safety grade separation |
4,500,000 |
|
| CA |
2515 |
California |
Widen
Bundy Drive between Wilshire and Santa Monica Boulevards in the City of Los
Angeles |
4,250,000 |
|
| CA |
511 |
California |
Mission
Boulevard / State Route 71 Interchange—Corridor Improvements |
4,200,000 |
|
| CA |
46 |
California |
Douglas St.
Improvements, El Segundo |
4,000,000 |
|
| CA |
216 |
California |
Construction
of Cross Valley Connector between 1-5 and SR 14 |
4,000,000 |
|
| CA |
702 |
California |
San
Diego, CA Construction of the 1-5 and SR-56 Connectors |
4,000,000 |
|
| CA |
1051 |
California |
Widen
State Route 262, replace two railroad overpass structures, and rebuild on and
off ramps between SR 262 and Kato Rd. in Fremont |
4,000,000 |
|
| CA |
1321 |
California |
Compton
Arterial Reconstruction and Improvement Program, Compton |
4,000,000 |
|
| CA |
1700 |
California |
Rehabilitation
of Tulare County Farm to Market road system |
4,000,000 |
|
| CA |
1775 |
California |
Construct Full access Interchange at SR 120, McKinley Avenue,
aith auxiliary lanes, Manteca |
4,000,000 |
|
| CA |
1990 |
California |
State
Route 99 improvements at Sheldon Road |
4,000,000 |
|
| CA |
2172 |
California |
Oregon-Page
Mill expressway Improvements between USlO] and SR 82, Palo Alto |
4,000,000 |
|
| CA |
2198 |
California |
Avalon
Boulevard/I-405 Interchange moc4flcation project, Carson |
4,000,000 |
|
| CA |
2655 |
California |
Construct
truck lane from Britannia Blvd. to the Otay Mesa Port of Entry, San Diego
County |
4,000,000 |
|
| CA |
3206 |
California |
Interstate 5 and State Route 78 Interchange Improvements |
4,000,000 |
|
| CA |
3139 |
California |
Improve Access Road to Beale Air Force Base (Smartville Road) |
3,750,000 |
|
| CA |
1666 |
California |
Passons
Grade Separation in the City of Pico Rivera |
3,700,000 |
|
| CA |
719 |
California |
State Route 1 improvements between Soquel and MorrisseyBlvd
including merge lanes and the La Fonda overpass, Santa Cruz |
3,670,000 |
|
| CA |
1335 |
California |
Construct
new interchange and related road improvements on US101 near Airport Blvd,
Salinas |
3,670,000 |
|
| CA |
2227 |
California |
4
lane widening/safety improvements on State Route 25 from Hollister to Gilroy |
3,660,000 |
|
| CA |
2024 |
California |
Realignment
of La Brea Avenue to reduce congestion |
3,640,000 |
|
| CA |
2906 |
California |
Improvement
of intersection at Inglewood Ave and Marine Ave to reduce congestion |
3,600,000 |
|
| CA |
287 |
California |
Rehabilitation,
repair, and/or reconstruction of deficient two- lane roads that connect to
Interstate 5, SR 180, SR 41 and SR 99 countywide,
Fresno County |
3,500,000 |
|
| CA |
1297 |
California |
Almaden
Expressway Improvements between Branham Lane and Blossom Road, San Jose |
3,500,000 |
|
| CA |
1942 |
California |
El Camino
Real Grand Blvd Initiative in San Mateo County |
3,500,000 |
|
| CA |
1092 |
California |
Widen
Santa Maria River Bridge on US. Highway 101 between Santa Barbara County and
San Luis Obispo County |
3,400,000 |
|
| CA |
1565 |
California |
Interchange
improvements at Rice Avenue and US. Highway 101 in the City of Oxnard |
3,300,000 |
|
| CA |
3239 |
California |
Reconstruct Atlantic Ave. and improve drainage from Ardmore
St. to Imperial Hwy South Gate |
3,250,000 |
|
| CA |
3269 |
California |
Implement
Northwest San Fernando Valley Road and Safety Improvements |
3,056,000 |
|
| CA |
51 |
California |
Route 1 San Pedro Creek Bridge replacement in Pacifica |
3,000,000 |
|
| CA |
234 |
California |
Widen SR89
at existing “mousehole” two lane RR underpass |
3,000,000 |
|
| CA |
340 |
California |
Santa Anita Avenue Corridor Imp rovement project, Arcadia |
3,000,000 |
|
| CA |
427 |
California |
Implement streetscape project on Central Avenue from 103rd
Street to Watts/103rd Street Station, Watts. |
3,000,000 |
|
| CA |
526 |
California |
Solano County Cordellia Hill/ Sky Valley, transportation
enhancement project, including upgrade of pedestrian and bicycle corridors |
3,000,000 |
|
| CA |
592 |
California |
Reconstruct
interchange for south-bound traffic entering 1-80 from Central Avenue, City
of Richmond |
3,000,000 |
|
| CA |
688 |
California |
Widen
Wilmington Ave from 223rd street including ramp modfications, Carson |
3,000,000 |
|
| CA |
1039 |
California |
Widen
State Route 98, including storm drain developments, from Kloke Road to State
Route ill, Calexico |
3,000,000 |
|
| CA |
1085 |
California |
Widen
South Main St.-Soda Bay Rd. between CR 400A (mile marker 0. 0-miler marker
and 0.7) and CR 502 (mile marker 0.0 and 0.9) |
3,000,000 |
|
| CA |
1142 |
California |
Implement
intelligent management & logistics measures to improve freight movement,
Gateway Cities. |
3,000,000 |
|
| CA |
1257 |
California |
Central
Galt & State Route 99 Interchange and Access Improvements |
3,000,000 |
|
| CA |
1401 |
California |
Reconstruct
Long Beach Bl. with medians and improve drainage from Palm Av. to Tweedy BI.
in Lynwood |
3,000,000 |
|
| CA |
1408 |
California |
Construction of an interchange located at the intersection of
.iture State Route 65 and Ferrari Ranch Road- Westwood in Placer County |
3,000,000 |
|
| CA |
1421 |
California |
Development
and construction of improvements to State Route 79 in the San Jacinto Valley |
3,000,000 |
|
| CA |
1639 |
California |
Resurface
and construct truck lane at CA Hwy 94 and Interstate 8 interchange, Boulevard
|
3,000,000 |
|
| CA |
1680 |
California |
Implement
Grove Avenue Corridor Interstate 10 interchange improvements in Ontario |
3,000,000 |
|
| CA |
1920 |
California |
Reconstruct
and widen Del Amo Blvd to four lanes between Normandie Ave and New Hampshire
Ave, Los Angeles County |
3,000,000 |
|
| CA |
2116 |
California |
Route 198
Expansion, from SR 99 to SR43 |
3,000,000 |
|
| CA |
2193 |
California |
710
Freeway Study to Evaluate Technical Feasibility and Impacts of a Tunnel
Alternative to Close 710 Freeway Gap |
3,000,000 |
|
| CA |
2194 |
California |
Greenleaf
Right of Way Community Enhancement Project-design and construct bikeways,
pedestrian walkways and upgrade signalization
Compton |
3,000,000 |
|
| CA |
2246 |
California |
Rancho Vista Blvd
Widening Project |
3,000,000 |
|
| CA |
2333 |
California |
Construct and repair lining in/our tunnels on Kanan, Kanan
Dume, and Malibu Canyon Roads between US1 and US1O1 |
3,000,000 |
|
| CA |
2758 |
California |
Hazel
Avenue Improvements, US. Highway 50 to Madison Avenue |
3,000,000 |
|
| CA |
2819 |
California |
Rosecrans
Avenue and Bridge Arterial Reconstruction Project, Compton |
3,000,000 |
|
| CA |
2861 |
California |
Construct
off ramp at Interstate 8/Imperial Avenue Interchange, El Centro |
3,000,000 |
|
| CA |
2882 |
California |
Construct
Bristol Street multi-modal corridor in Santa Ana |
3,000,000 |
|
| CA |
3085 |
California |
Widen and reconstruct Washington Blvd from westerly city
boundary at Vernon to I-5 at Telegraph Rd in Commerce |
3,000,000 |
|
| CA |
3098 |
California |
Construct Cypress Avenue over-pass to separate Interstate 10
and Union Pacific Railroad tracks in Fontana |
3,000,000 |
|
| CA |
3203 |
California |
Widen and realign Cherry Avenue from 19th Street to one block
south of Pacific Coast Highway, Signal Hill |
3,000,000 |
|
| CA |
3280 |
California |
Construct
Western Placerville Interchanges on State Route 50 |
3,000,000 |
|
| CA |
391 |
California |
I-1O and Indian Ave Interchange, Palm Springs |
2,750,000 |
|
| CA |
1369 |
California |
Palm
Drive & Interstate 10 interchange project |
2,750,000 |
|
| CA |
3069 |
California |
Widen and reconfigure Sepulveda & Culver Boulevards,
Culver City |
2,740,000 |
|
| CA |
124 |
California |
Landscaping Enhancements Along Ronald Reagan Freeway Route 118
for aesthetic purposes |
2,500,000 |
|
| CA |
184 |
California |
Reconstruct
segments ofHollister Avenue between San Antonio Road and State Route 154 in
Santa Barbara County |
2,500,000 |
|
| CA |
191 |
California |
Construct a 2.8 mile bikeway along Lambert Roadfrom Mills Ave.
to Valley Home Ave. in the City of Whittier |
2,500,000 |
|
| CA |
450 |
California |
Conduct project design and environmental analysis of Heritage
Bridge on Heritage Road linking Chula Vista to Otay Mesa |
2,500,000 |
|
| CA |
498 |
California |
Mariposa
County, CA Improve 16 roads, bridge and one bike path |
2,500,000 |
|
| CA |
518 |
California |
Construct
pedestrian enhancements on Broadway in Los Angeles |
2,500,000 |
|
| CA |
58 |
California |
Tuolumne,
Stanislaus and Merced Counties Upgrade existing county highway, J59 |
2,500,000 |
|
| CA |
1218 |
California |
Upgrade
and reconstruct 1-580/ Vasco Road Interchange, City of Livermore |
2,500,000 |
|
| CA |
1355 |
California |
Coyote
Creek Trail Project — Story Road to Montague Expressway |
2,500,000 |
|
| CA |
1481 |
California |
Construct
truck lane on Keystone Roadfrom State Route 111 to Austin Road, Imperial
County |
2,500,000 |
|
| CA |
1904 |
California |
Reconstruct
Azusa Ave and San Gabriel Ave for two-way traffic in Azusa |
2,500,000 |
|
| CA |
2017 |
California |
Construct
the Silicon Valley Transportation Incident Management Center in San Jose |
2,500,000 |
|
| CA |
2131 |
California |
Construct
operational and safety improvements to 1-880 N at 29th Ave in Oakland |
2,500,000 |
|
| CA |
4 |
California |
Build
a pedestrian bridge from Hiller Street to the Bay Trail, Belmont |
2,450,000 |
|
| CA |
284 |
California |
Implement
Southwest San Fernando Valley Road and Safety Improvements |
2,300,000 |
|
| CA |
961 |
California |
Construction
of CA 101 Auxiliaiy Lanes, Marsh Rd. to Santa Clara County Line |
2,250,000 |
|
| CA |
950 |
California |
Widen Interstate 8 overpass at Dogwood Road, Imperial |
2,122,500 |
|
| CA |
35 |
California |
Replace
structurally unsafe Winters Bridge for vehicles, bicycles and pedestrians
between Yolo and Solano Counties. |
2,000,000 |
|
| CA |
254 |
California |
Construct
Coyote Creek Trail Project from Story Road to Montague Expressway in San Jose
|
2,000,000 |
|
| CA |
260 |
California |
Escondido Construction of Bear Valley Pkwy, East Valley Pkwy |
2,000,000 |
|
| CA |
297 |
California |
Study
of Thomas Bridge to meet future cargo and passenger traffic needs of the
ports ofLong Beach and Los Angeles |
2,000,000 |
|
| CA |
300 |
California |
Mount
Vernon Avenue grade separation and bridge expansion in Colton |
2,000,000 |
|
| CA |
479 |
California |
Widen
Firestone Blvd between Ryerson Blvd and Stewart and Gray Road in Downey |
2,000,000 |
|
| CA |
485 |
California |
Widen
Lakewood Blvd between Telegraph Rd and Fifth St in Downey |
2,000,000 |
|
| CA |
517 |
California |
Carlsbad,
CA Construction of Poinsettia Lane |
2,000,000 |
|
| CA |
563 |
California |
Improvement of intersection at Aviation Blvd. and Rosecrans
Ave. to reduce congestion (Hawthorne) |
2,000,000 |
|
| CA |
574 |
California |
Construct
1-605 Interchange Capacity Improvements in Irwindale |
2,000,000 |
|
| CA |
1230 |
California |
Modesto,
Riverbank & Oakdale, CA Improve SR219 to 4- lanes |
2,000,000 |
|
| CA |
1261 |
California |
Establish
new grade separation at Sunset Ave in Banning |
2,000,000 |
|
| CA |
1286 |
California |
South
Bay Cities COG Coastal Corridor Transportation Initiative, Phase 3, El
Segundo |
2,000,000 |
|
| CA |
1296 |
California |
Long
Beach Intelligent Transportation System: Integrate functioning traffic
management center that includes the port, transit,
airport as well as the city’s police and fire departments, Long Beach |
2,000,000 |
|
| CA |
1316 |
California |
Widen
and Improve County Line Road in Calimesa |
2,000,000 |
|
| CA |
1387 |
California |
Reconstruct
interchange at I-1O and Riverside Avenue to improve traffic in Rialto |
2,000,000 |
|
| CA |
1402 |
California |
Expand
carsharing pilot program to serve low- and moderate- income neighborhoods in
the City and County of San Francisco |
2,000,000 |
|
| CA |
1590 |
California |
Interstate
15 and State Route 79 South Freeway Interchange and Ramp Improvement Project |
2,000,000 |
|
| CA |
1665 |
California |
Conduct
Study of SR 130 Realignment Project, San Joaquin County & Santa Clara
County, CA |
2,000,000 |
|
| CA |
1696 |
California |
Reconstruction
of The Strand in the City of Manhattan Beach to improve beach access and
accommodate increased pedestrian traffic |
2,000,000 |
|
| CA |
1740 |
California |
Construct
earthen berm along Esperanza Road from Yorba Linda Blvd. to the west city
limits to mitigate noise |
2,000,000 |
|
| CA |
1821 |
California |
Construct
an Interchange on Highway 70 at Georgia Paciflc Road in Oroville |
2,000,000 |
|
| CA |
1830 |
California |
City
of Madera, CA Improve SR99-SR145 Interchange |
2,000,000 |
|
| CA |
1841 |
California |
Ramona
Avenue Grade Separation, Montclair, Calzfornia |
2,000,000 |
|
| CA |
2153 |
California |
Design
and construct new interchange at Potrero Blvd and State Route 60 in Beaumont |
2,000,000 |
|
| CA |
2192 |
California |
Construction
of traffic and pedestrian safety improvements in Yucca Valley |
2,000,000 |
|
| CA |
2254 |
California |
Monte
Vista Avenue Grade Separation, Montclair, Cahfornia |
2,000,000 |
|
| CA |
2279 |
California |
Install
Central Ave Historic Corridor comprehensive streetscape improvements thus
improving traffic, ped safety, and economic
development, Los Angeles |
2,000,000 |
|
| CA |
2399 |
California |
Improve
access to 1-80 at Eureka Road Interchange |
2,000,000 |
|
| CA |
2402 |
California |
Interstate
15, California Oaks Road Interchange Project |
2,000,000 |
|
| CA |
2476 |
California |
Enhance pedestrian environment and increase safety along
Olympic Blvd between Vermont and Western Avenues, Los Angeles |
2,000,000 |
|
| CA |
2489 |
California |
Upgrade
essential road arterials, connectors, bridges and other road infrastructure
improvements in the Town of Desert Hot Springs, CA
|
2,000,000 |
|
| CA |
2499 |
California |
Improvements to
Ben Maddox Way Bridge |
2,000,000 |
|
| CA |
2684 |
California |
Hwy
199 Narrow Enhancement to reduce active slides that cause signflcant road
closures on primary connecting route from US 101
to 1-5 |
2,000,000 |
|
| CA |
2826 |
California |
Construct
grade separation on State Street and Cajon Boulevard along BNSF tracks in San
Bernardino |
2,000,000 |
|
| CA |
2856 |
California |
Realign SR 4
within the City of Oakley |
2,000,000 |
|
| CA |
3018 |
California |
Valley
Boulevard Capacity Improvement between 710 Freeway and Marguerita Avenue,
Alhambra |
2,000,000 |
|
| CA |
3074 |
California |
Olsen Road widening and roadway improvements in Simi Valley,
CA |
2,000,000 |
|
| CA |
3086 |
California |
San Diego, CA Interstate 5, Sorrento Valley Road and Genesee
Avenue Interchange Project |
2,000,000 |
|
| CA |
3140 |
California |
Interstate 215, Los Alamos Road Interchange Project |
2,000,000 |
|
| CA |
3220 |
California |
Upgrade Japson Parkway at North and South Gates of Travis Air
Force Base and widen Vanden Road segment, Solano County |
2,000,000 |
|
| CA |
219 |
California |
Soundwall construction on the 210 Freeway, Pasadena |
1,800,000 |
|
| CA |
337 |
California |
Construct
interchange on US 50 at Empire Ranch Road in Folsom |
1,800,000 |
|
| CA |
430 |
California |
Upgrade
and extend Commerce Avenue, City of Concord |
1,750,000 |
|
| CA |
2484 |
California |
Reconstruct
Interstate 880-Route 92 interchange in Hayward |
1,750,000 |
|
| CA |
1610 |
California |
Reconstruct
Whittier Blvd. and improve parkway drainage from Philadelphia Av. to Five
Points in Whittier |
1,700,000 |
|
| CA |
1915 |
California |
Construct
and improve medians and drainage on Imperial Highway from west border to east
border of city in La Mirada |
1,700,000 |
|
| CA |
1564 |
California |
Add
turn lane and adaptive traffic control system at intersection of San Tomas
Expressway and Hamilton Avenue in Campbell |
1,600,000 |
|
| CA |
3000 |
California |
Diamond
Bar, CA Grand Avenue Rehabilitation |
1,600,000 |
|
| CA |
2 |
California |
Develop
and implement ITS master plan in Anaheim |
1,500,000 |
|
| CA |
465 |
California |
I-S Santa
Clarita-Los Angeles Gateway Improvement Project |
1,500,000 |
|
| CA |
509 |
California |
Scenic preservation and run-off mitigation in the SantaMonica
Mountains National Recreation Area near PCH and US 101 |
1,500,000 |
|
| CA |
823 |
California |
Construct
Inland Empire Transportation Management Center in Fontana to better regulate
traffic and dispatch personnel to incidents |
1,500,000 |
|
| CA |
917 |
California |
Widening
Avenue 416 in Dinuba California |
1,500,000 |
|
| CA |
1177 |
California |
Fresno
County, CA Widen Friant Road to four lanes with class II bicycle lanes |
1,500,000 |
|
| CA |
1744 |
California |
Construct
1-80 Gilman Street interchange improvements in Berkeley |
1,500,000 |
|
| CA |
2340 |
California |
Construct
truck ramp linking Interstate 5 to the National City Marine Cargo Terminal,
National City |
1,500,000 |
|
| CA |
2805 |
California |
Establish
1-15 Interchange at Nisqualli and Mojave River crossing in San Bernardino
County |
1,500,000 |
|
| CA |
2934 |
California |
Construction of Lenwood Road Grade Separation in Barstow, |
1,500,000 |
|
| CA |
319 |
California |
Improve
traffic safety, including streetlights, from Queen to Barclay to Los Angeles
River to Riverside in Elysian Valley, Los Angeles |
1,400,000 |
|
| CA |
2176 |
California |
Construct
road surface improvements, and improve road safety from Brawley Water plant
to HWY 86 to 9th Street to 18th Street, Brawley |
1,400,000 |
|
| CA |
2713 |
California |
Conduct
necessary planning and engineering and implement comprehensive Corridor
Management Plan for Arroyo Seco Historic Parkway,
Los Angeles |
1,400,000 |
|
| CA |
2288 |
California |
Reconstruct
Paramount Bl. with medians and improve drainage from north border to south
border of city in Lakewood |
1,350,000 |
|
| CA |
884 |
California |
Design
Traffic Flow Improvements Azusa and Amar, City of West Covina |
1,250,000 |
|
| CA |
971 |
California |
Realign
First St between Mission Rd and Clarence St in Los Angeles |
1,250,000 |
|
| CA |
317 |
California |
Construct one additional all purpose lane in each direction on
1405 and provide additional capital improvements from SR73 through the LA County line |
1,210,000 |
|
| CA |
180 |
California |
Implement
streetscape improvements on segments of Laurel Canyon Blvd. and Victory Blvd.
in North Hollywood |
1,200,000 |
|
| CA |
1371 |
California |
Construct
1-580 Interchange Improvements in Castro Valley |
1,200,000 |
|
| CA |
1601 |
California |
Transportation
enhancements to Children Museum of Los Angeles |
1,200,000 |
|
| CA |
1903 |
California |
Randolph
St improvements between Wilmington Ave and Fishburn Ave in Huntington Park |
1,200,000 |
|
| CA |
1093 |
California |
Widen
San Fernando Road North, including streetscape projects, Sylmar |
1,060,000 |
|
| CA |
246 |
California |
Operations
and management improvements, including ITS technologies, on US. Highway 101
in Santa Barbara County |
1,000,000 |
|
| CA |
253 |
California |
Quincy-Oroville
Highway Rehabilitation in Plumas County |
1,000,000 |
|
| CA |
266 |
California |
Reconstruct
1-710 southern terminus off ramps, Long Beach |
1,000,000 |
|
| CA |
572 |
California |
Shoal Creek
Pedestrian Bridge (San Diego) |
1,000,000 |
|
| CA |
618 |
California |
Grade
Separation at 32nd Street between 1-15 and Harbor Drive, San Diego |
1,000,000 |
|
| CA |
624 |
California |
Begin
construction of road from US-395 west towards SR-14 |
1,000,000 |
|
| CA |
701 |
California |
Develop
and implement traffic calming measures for traffic exiting the I-710 into
Long Beach |
1,000,000 |
|
| CA |
726 |
California |
Grade
Separation at Vanowen and Cliveborne, Burbank |
1,000,000 |
|
| CA |
740 |
California |
Design and environmental analysis for State Route 11
connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego. |
1,000,000 |
|
| CA |
867 |
California |
Construct
road from Mace Blvd in Yolo County to federally supported Pacflc Flyway
wild4fe area |
1,000,000 |
|
| CA |
882 |
California |
Reconstruct
Eastern Ave from Muller St to Watcher St in Bell Gardens |
1,000,000 |
|
| CA |
896 |
California |
Colima Road
at Fullerton Road Intersection Improvements |
1,000,000 |
|
| CA |
951 |
California |
Improve
bridge 58-7 on SR 115 that crosses the Alamo River in Holtville and also
project design and environmental ananlysis of a
new bridge over the same river |
1,000,000 |
|
| CA |
1256 |
California |
San Diego,
CA Interstate 15 Managed Lanes |
1,000,000 |
|
| CA |
1509 |
California |
Construction
of new roadway lighting on major transportation corridors in the Southwest
San Fernando Valley |
1,000,000 |
|
| CA |
1557 |
California |
Improve
1-8 off ramp at Ocotillo to the Imperial Valley College Desert
Museum/Regional Traveler Visitor Center, Imperial
County |
1,000,000 |
|
| CA |
1662 |
California |
City
ofRedondo Beach Esplanade Improvement Project |
1,000,000 |
|
| CA |
1759 |
California |
Highways
152 -156 Intersection improvements, CA |
1,000,000 |
|
| CA |
1778 |
California |
Conduct
Study and Construct 1205 Chrisman Road Interchange Project, Tracy, CA - |
1,000,000 |
|
| CA |
2018 |
California |
Design
and Construction Camino Tassajara Crown Canyon to East Town Project,
Danville, CA |
1,000,000 |
|
| CA |
2055 |
California |
Construction
of an interchange at Lammers Road and 1-205, Tracy, CA |
1,000,000 |
|
| CA |
2084 |
California |
Construct
Alviso Bay Trail from Gold Street in historic Alviso to San Tomas Aquino
Creek in San Jose |
1,000,000 |
|
| CA |
2089 |
California |
Vasco Road Safety Improvements, Contra Costa Transportation
Authority and the County of Alameda Public Works, Calfornia |
1,000,000 |
|
| CA |
2147 |
California |
Construction
of new roadway lighting on major transportation corridors in the Northwest
San Fernando Valley |
1,000,000 |
|
| CA |
2174 |
California |
Park
Boulevard-Harbor Drive Rail Grade Separation, San Diego |
1,000,000 |
|
| CA |
2209 |
California |
Construct
1-80 HOV lanes and interchange in Vallejo |
1,000,000 |
|
| CA |
2233 |
California |
Interstate
15 and Winchester Road Interchange Project |
1,000,000 |
|
| CA |
2278 |
California |
Construct
safe routes to school in Chertyland and Ashland |
1,000,000 |
|
| CA |
2293 |
California |
Widen
and make ITS improvements on Paramount Blvd between Telegraph Rd and
Gardendale St in Downey |
1,000,000 |
|
| CA |
2352 |
California |
Improve
1-8 off ramp to the Desert Farming Institute, Imperial County |
1,000,000 |
|
| CA |
2369 |
California |
Construct
fourth bore of Caldecott Tunnel on SR 24, California |
1,000,000 |
|
| CA |
2448 |
California |
Widen
1-238 between 1-580 & 1-880 in Alameda County |
1,000,000 |
|
| CA |
2479 |
California |
Construct
landscape medians along Skyline Drive from Sears Avenue to 58th Street, San
Diego |
1,000,000 |
|
| CA |
2514 |
California |
Widen
Atlantic Bl bridge over the Los Angeles River in Vernon |
1,000,000 |
|
| CA |
2543 |
California |
State
Route 86S and Ave 50 highway safety grade separation |
1,000,000 |
|
| CA |
2663 |
California |
Purchase
of Rosemead Blvd ROW, Temple City |
1,000,000 |
|
| CA |
2701 |
California |
Construct
Route 101 bicycle/pedestrian overpass at Millbrae Ave for the San Francisco
Bay Trail |
1,000,000 |
|
| CA |
2843 |
California |
Crenshaw
Blvd. Rehabilitation, Maricopa St. to Sepulveda Blvd., City of Torrance |
1,000,000 |
|
| CA |
2849 |
California |
Improve
pedestrian and biking trails within East Bay Regional Park District, Contra
Costa County |
1,000,000 |
|
| CA |
2932 |
California |
Construct
213th Street pedestrian bridge to provide safe passage for pedestrians and
wheelchairs, Carson |
1,000,000 |
|
| CA |
3133 |
California |
Design and implement Harbor Boulevard ITS in Garden Grove |
1,000,000 |
|
| CA |
3184 |
California |
Construct parking facility and improve museum pedestrian
access from trolley station, San Diego |
1,000,000 |
|
| CA |
3209 |
California |
Highway 74 and Interstate 215 Interchange Project |
1,000,000 |
|
| CA |
3229 |
California |
Construction and enhancements of trails in the Santa Monica
Mountains National Recreation Area |
1,000,000 |
|
| CA |
3285 |
California |
Improve
access from 1-8 and construct parking lot for the Imperial Sand Dunes
Recreation Area Visitor’s Center, Imperial Valley |
1,000,000 |
|
| CA |
3313 |
California |
San
Diego, CA Construction of North Coast Interstate 5 |
1,000,000 |
|
| CA |
480 |
California |
Construct
Air Cargo Access Road to Oakland International Airport. |
900,000 |
|
| CA |
3022 |
California |
Valley
View/Stage Grade Separation Project, La Mirada and Santa Fe Springs,
California |
900,000 |
|
| CA |
1307 |
California |
Construct
sound barriers at the I-805/S.R. 54 Interchange, National City |
850,000 |
|
| CA |
2626 |
California |
Construct
Cabot-Camino Capistrano Bridge Project and related roadway improvements in
Cities of Mission Viejo and Laguna Niguel,
California |
838,690 |
|
| CA |
43 |
California |
Roadway
surface improvements, street lighting, and storm drain improvements to South
Center Street from Baughman Road to State Route
78/86, Westmorland |
800,000 |
|
| CA |
595 |
California |
Street
Closure at Chevy Chase Drive, Glendale |
800,000 |
|
| CA |
2157 |
California |
Crenshaw
Blvd. Rehabilitation, 182nd St. -190th St., and Crenshaw Blvd. at 182nd St.
Fvy on-off Ramp Capacity Enhancement, City of
Torrance |
800,000 |
|
| CA |
308 |
California |
Streetscape
improvements at East 14th St-Mission Blvd in Alameda County |
750,000 |
|
| CA |
709 |
California |
Construct
bicycle and pedestrian bridge between Oyster Bay Regional Park in San Leandro
and Metropolitan Golf Course in Oakland |
750,000 |
|
| CA |
806 |
California |
Replace
1-880 overpass at Davis St in San Leandro |
750,000 |
|
| CA |
984 |
California |
Construct
oveFpass on Central Ave at the railroad crossing in Newark |
750,000 |
|
| CA |
1138 |
California |
Construct
Valley Boulevard Drainage Improvements, El Monte |
750,000 |
|
| CA |
1407 |
California |
Construct
Traffic flow improvements Vincent and Lakes Drive, West Covina |
750,000 |
|
| CA |
357 |
California |
Construct
new left turn lane at State Route 19 and Teistar in El Monte |
700,000 |
|
| CA |
1414 |
California |
Rio
Vista Bridge Realignment Study & Street Sign Safety Program |
700,000 |
|
| CA |
881 |
California |
North
Atlantic Pedestrian Bridge, Monterey Park |
600,000 |
|
| CA |
1390 |
California |
Reconstruct
Paramount Blvd. with medians and improve drainage from Artesia Bi. to
Candlewood St. in Long Beach |
600,000 |
|
| CA |
2699 |
California |
Construct
the Los Angeles River bicycle and pedestrian path in the San Fernando Valley |
575,000 |
|
| CA |
2162 |
California |
Construct
truck lane on Baughman Roadfrom State Route 78/86 to Forrester Road,
Westmorland |
550,000 |
|
| CA |
1 |
California |
Construct
safe access to streets for bicyclists and pedestrians including crosswalks,
sidewalks and traffic calming measures, Covina |
500,000 |
|
| CA |
28 |
California |
Huntington
Beach, Remove off-ramp on 1-405 at Beach Blvd. Construct fourth lane on 1-405
North, at the Beach Blvd. interchange |
500,000 |
|
| CA |
90 |
California |
San
Diego River Multiuse Bicycle and Pedestrian Path |
500,000 |
|
| CA |
134 |
California |
Improvement
of intersection at Balboa Blvd. and San Fernando Rd |
500,000 |
|
| CA |
570 |
California |
1-5
HOV improvements from Route 134 to Route 170 |
500,000 |
|
| CA |
716 |
California |
Conduct
a Project Study Report for new Highway 99 interchange between SR 165 and
Bradbury Road, serving Turlock/Hilmar region |
500,000 |
|
| CA |
855 |
California |
Implement
Riverside Avenue Railroad Bridge improvements, south of Interstate 10 in
Rialto |
500,000 |
|
| CA |
1023 |
California |
Implement
Van Nuys Road and Safety Improvements |
500,000 |
|
| CA |
1148 |
California |
Los
Angeles Regional Diesel Emissions Reduction Program For Engine Retrofit,
Gateway Cities |
500,000 |
|
| CA |
1285 |
California |
Rehabilitate
pavement on Azusa Avenue and San Gabriel Avenue in Azusa |
500,000 |
|
| CA |
1608 |
California |
Project
design, environmental assessment, and roadway construction of Lonestar Road
from Alta Road to Enrico Fermi Drive San Diego
County |
500,000 |
|
| CA |
1633 |
California |
Conduct
project report study on Old River School Rd — Firestone Blvd intersection
reconfiguration |
500,000 |
|
| CA |
1697 |
California |
Construction
of new roadway lighting on major transportation corridors in the Northeast
San Fernando Valley |
500,000 |
|
| CA |
1722 |
California |
State Route
88 - Pine Grove Corridor Improvement Project |
500,000 |
|
| CA |
1767 |
California |
Construct Hwy 101 bicycle-pedestrian project in Marin and
Sonoma Counties from north ofAthenton Ave to south of Petaluma River bridge |
500,000 |
|
| CA |
1776 |
California |
Install Emergency Vehicle PreemptionEQ along major arterials
in the I 880 Corridor, A,ameda County |
500,000 |
|
| CA |
1780 |
California |
Construction
of Campus Parkway from State Route 99 to Yosemite Ave., Merced County |
500,000 |
|
| CA |
2378 |
California |
Make
traffic and safety improvements to Atlantic Blvd in Maywood |
500,000 |
|
| CA |
2427 |
California |
US-395
Realignment and Widening Project |
500,000 |
|
| CA |
2542 |
California |
Replace
twin 2 lane bridge with single 4 lane bridge on SR 138 overBig Rock Wash |
500,000 |
|
| CA |
2618 |
California |
Grade
Separation at Cesar Chavez Parkway and Harbor Drive, San Diego |
500,000 |
|
| CA |
2762 |
California |
Conduct
traffic study ofproposed realignment of Nutwood Ave in Fullerton |
500,000 |
|
| CA |
2835 |
California |
Provide
landscape enhancement of an existing open culvert on Atherton Street, Long
Beach |
500,000 |
|
| CA |
2883 |
California |
Construct
pedestrian sidewalk enhancements in Beliflower |
500,000 |
|
| CA |
3145 |
California |
Citywide traffic signal upgrades requireing the installation
of hardware and software at 9 major intersection, Palo Alto |
500,000 |
|
| CA |
3167 |
California |
Construct grade separations at Washington Ave & UPRR
crossing east and Washington Ave & La Cadena Drive in Colton |
500,000 |
|
| CA |
326 |
California |
Construct
a raised landscaped median on Alondra Blvd between Clark Ave and WoodruffAve
in Beliflower |
400,000 |
|
| CA |
379 |
California |
Construct
Class I bike and pedestrian path from San Luis Obispo to Avila Beach |
400,000 |
|
| CA |
732 |
California |
Riverside
Drive Improvements, Los Angeles |
400,000 |
|
| CA |
1388 |
California |
Reconstruct
BloomfieldAv. with medians from Carson St. to north city limits in Hawaiian
Gardens |
400,000 |
|
| CA |
1609 |
California |
Project
Study Reports for 1-105 and 1-405 Interchanges at Los Angeles International
Airport |
400,000 |
|
| CA |
1770 |
California |
Extension
of a regional Class I bikeway from the West City limits to the East City
limits along leased railroad right-of- away |
400,000 |
|
| CA |
1816 |
California |
Improvement
of intersection at Burbank Blvd. and Hayvenhurst Ave |
400,000 |
|
| CA |
1933 |
California |
Construct
two right hand turn for Byzantine Latino Quarter transit plazas at Normandie
and Pico, and Hoover and Pico, Los Angeles |
400,000 |
|
| CA |
1955 |
California |
Improvements
to US-101 ramps between Winnetka Ave. and Van Nuys Blvd |
400,000 |
|
| CA |
2651 |
California |
Construct
crosswalk bump-outs and related streetscape improvements on Temple St between
Hoover St and Glendale Blvd. Los Angeles |
400,000 |
|
| CA |
3126 |
California |
Reconstruct Rosecrans Av. And construct bus pads from Garfield
to Century Bl. In Paramount |
400,000 |
|
| CA |
84 |
California |
Adams
Street Rehabilitation Project, Glendale |
388,000 |
|
| CA |
3066 |
California |
Construct parking facility and improve access to Imperial
Vally Expo |
377,500 |
|
| CA |
2517 |
California |
Widen Maine Avenue
in Baldwin Park |
375,000 |
|
| CA |
1274 |
California |
Upgrade
Bellflower intersections at Alondra Blvd and at Rosecrans Ave in Bellflower |
350,000 |
|
| CA |
1883 |
California |
Planning
for Orange Line Mag Lev from downtown Los Angeles to central Orange County |
350,000 |
|
| CA |
122 |
California |
Willow and Herndon Traffic Flow Improvements, City of Clovis |
300,000 |
|
| CA |
167 |
California |
Construct
pedestrian, bicycle and ADA accessible boardwalks at the Pismo Beach
Promenade in San Luis Obispo County |
300,000 |
|
| CA |
471 |
California |
San
Gabriel Blvd Rehabilitation Project — Mission Rd to Broadway, San Gabriel |
300,000 |
|
| CA |
489 |
California |
Pasadena Ave/Monterey Rd Partial Grade Separation- Prelim
Engineering-- Feasibility, So. Pasadena |
300,000 |
|
| CA |
938 |
California |
Repair
and realignment of Brahma Dr. and Winnetka Ave |
300,000 |
|
| CA |
1436 |
California |
Alameda
Corridor-East Construction Authority, San Gabriel Valley |
300,000 |
|
| CA |
2965 |
California |
ModfIes
9 traffic signals between Willow Road and Middlefield Road and Hamilton
Avenue, Menlo Park |
300,000 |
|
| CA |
3067 |
California |
Develop bicycle paths and pedestrian access to Third Avenue
Chula Vista |
300,000 |
|
| CA |
594 |
California |
Reduce Orange
County Congestion Program |
250,000 |
|
| CA |
1655 |
California |
Landscape
south side of the 91 fwy at Bellflower Blvd in Bellflower |
250,000 |
|
| CA |
2405 |
California |
Acquire
lands adjacent to US 101 as part of Southern Santa Clara County Wildlife
Corridor Protection and Scenic Enhancement Project
|
250,000 |
|
| CA |
3308 |
California |
Walnut
Grove at Broadway Intersection Capacity Enhancements, San Gabriel |
250,000 |
|
| CA |
2978 |
California |
Develop
conceptual master plan to improve the efficiency of transportation
facilities, Covina |
215,000 |
|
| CA |
1579 |
California |
San
Gabriel Blvd Intersection Improvements at Broadway and at Las Tunas, San
Gabriel |
200,000 |
|
| CA |
1703 |
California |
Implement
Northeast San Fernando Valley Road and Safety Improvements |
200,000 |
|
| CA |
2299 |
California |
Widen
Haskell Avenue between Chase St. and Roscoe Blvd |
200,000 |
|
| CA |
2538 |
California |
Construct
traffic intersection island improvements on North side of Olympic Blvd where
Irolo St. and Normandie Ave. split in Koreatown,
Los Angeles |
200,000 |
|
| CA |
2690 |
California |
San
Gabriel Blvd and Mission Road Intersection Improvements, San Gabriel |
200,000 |
|
| CA |
2811 |
California |
San
Gabriel Blvd Rehabilitation Project — Broadway to Las Tunas, San Gabriel |
200,000 |
|
| CA |
3284 |
California |
Improve
West Adams Blvd Streetscape in West Adams Historic District, Los Angeles |
200,000 |
|
| CA |
1181 |
California |
Improvement
of intersection at Burbank Blvd. and Woodley Ave |
160,000 |
|
| CA |
2389 |
California |
Las
Tunas Drive Pedestrian Enhancement, San Gabriel |
150,000 |
|
| CA |
2750 |
California |
Engineering
support to I-S Joint Powers Authority to widen 1- 5 freeway and improve
corridor arterials from 1-710 to Orange County
line |
150,000 |
|
| CA |
2812 |
California |
Signal
upgrades on Avenida de las Flores, Melinda Road, Avenida de las Banderas, and
Alma Aldea, Rancho Santa Margarita, Cahfornia |
125,200 |
|
| CA |
388 |
California |
Construction
of a traffic signal at the intersection of Independence Avenue and Sherman
Way |
125,000 |
|
| CA |
2634 |
California |
Construction
of a traffic signal at the intersection of Hamlin St. and Corbin Ave |
125,000 |
|
| CA |
3201 |
California |
Construction of a traffic signal at the intersection of Oso
Ave. and Vancowen St |
125,000 |
|
| CA |
937 |
California |
Rehabilitate
street surfaces in Sherman Oaks |
124,000 |
|
| CA |
2591 |
California |
Install
traffic signal on Balboa Blvd. at Knollwood Shopping Center |
120,000 |
|
| CA |
891 |
California |
Rosemead
Boulevard/Highway 19 Renovation Project, Pico Rivera |
100,000 |
|
| CA |
2045 |
California |
Project
to evaluate air quality and congestion mitigation benefits of a Hybrid
Utility Vehicle in Santa Barbara County |
100,000 |
|
| CA |
2617 |
California |
Gale
Avenue widening between Fullerton Road and Nogales Street, and Nogales Street
widening at Gale Avenue |
100,000 |
|
| CA |
2828 |
California |
Implement
streetscape improvements along Wilbur Avenue to enhance traffic and
pedestrian safety |
100,000 |
|
| CA |
1228 |
California |
Improve
the Rosecrans Ave and Alondra Blvd bridges over the San Gabriel River in
Bellflower |
50,000 |
|
| CA |
1531 |
California |
Construction
of a smart crosswalk system at the intersection of Arminta St. and Mason Ave |
50,000 |
|
| CA |
1867 |
California |
Construction
of a smart crosswalk system at the intersection of Topanga Canyon Blvd. and
Gault St |
50,000 |
|
| CA |
3062 |
California |
Conduct environmental review of proposed improvements related
to the connection of Dumbarton Bridge to Highway 101 |
50,000 |
|
| CA |
3157 |
California |
Rehabilitate street surface of Addison St. between Kester Ave.
and Lemona Ave. |
47,000 |
|
| CA |
550 |
California |
Rehabilitate
street surface of Cedros Avenue between Burbank Blvd. and Magnolia Blvd |
43,000 |
|
| CA |
2345 |
California |
Upgrade
first responders signal pre-emption hardware, Culver City |
32,000 |
|
| CA |
3175 |
California |
SR 91 I 605 Needs Assesment Study, Whittier, CA |
16,000 |
|
| CO |
1451 |
Colorado |
Construction
of Powers Boulevard and Woodman Road interchange, Colorado Springs |
8,000,000 |
|
| CO |
1882 |
Colorado |
North
1-25: Denver to Fort Collins Colorado |
8,000,000 |
|
| CO |
304 |
Colorado |
US 50 East, State
Line to Pueblo |
7,500,000 |
|
| CO |
889 |
Colorado |
US 160, East of Wolf
Creek Pass |
7,500,000 |
|
| CO |
1881 |
Colorado |
Construct
arterial on Wside of Montrose to ease traffic congestion on SH 550 between
Grand Avenue, N/S of city |
7,500,000 |
|
| CO |
1352 |
Colorado |
CO
56th Avenue & Quebec Street Improvements Phase I, Denver |
6,500,000 |
|
| CO |
3128 |
Colorado |
|
6,500,000 |
|
| CO |
604 |
Colorado |
US
160, State Highway 3 to East 0/the Florida River |
6,000,000 |
|
| CO |
854 |
Colorado |
Construction
of US 24 - Tennessee Pass, Colorado |
6,000,000 |
|
| CO |
1299 |
Colorado |
US 550, New
Mexico State Line to Durango |
6,000,000 |
|
| CO |
2899 |
Colorado |
Design
and builda multimodal corridor on US 36 |
5,000,000 |
|
| CO |
329 |
Colorado |
For
construction and architectural improvements of Wadsworth Bypass
(SHI2J)Burlington Northern Railroad and Grandview
Grade Separation |
4,000,000 |
|
| CO |
1166 |
Colorado |
1-25
Improvements - Douglas - Arapahoe County Line to El Paso County Line |
4,000,000 |
|
| CO |
1803 |
Colorado |
|
4,000,000 |
|
| CO |
1856 |
Colorado |
Improve
and widen State Highway 44 from Colorado Boulevard to State Highway 2 |
4,000,000 |
|
| CO |
2108 |
Colorado |
1-70
and SH58 Interchange: Reconstruction of existing ramps, building of missing
ramps and ROW acquisition |
4,000,000 |
|
| CO |
2230 |
Colorado |
Dillon
Drive Overpass at Interstate 25 in Pueblo |
4,000,000 |
|
| CO |
2383 |
Colorado |
Reconstruct
C470-US85 Interchange |
4,000,000 |
|
| CO |
3003 |
Colorado |
Roadway
widening and interchange rebuilding on 1-225 from 1-70 to Parker Road |
4,000,000 |
|
| CO |
3119 |
Colorado |
|
4,000,000 |
|
| CO |
2423 |
Colorado |
US 287
- Ports-to-Plains Corridor in Colorado |
3,000,000 |
|
| CO |
2558 |
Colorado |
1-76: Colorados
Northeast Gateway |
3,000,000 |
|
| CO |
1715 |
Colorado |
CO 1-70
East Multimodal Corridor (Highway Expansion), Denver |
2,500,000 |
|
| CO |
186 |
Colorado |
Construct
Wadsworth Interchange over US 36 in Broomfield |
2,000,000 |
|
| CO |
1415 |
Colorado |
SH
121 - Bowles Ave Intersection and Roadway Improvements, Jefferson County
Colorado |
2,000,000 |
|
| CO |
2382 |
Colorado |
1-70,
Havana, Yosemite Street Interchange Reconstruction Project, Denver |
1,500,000 |
|
| CO |
946 |
Colorado |
East
104th and US85 Intersection: Study, design and construction of needed
improvements to intersection |
1,000,000 |
|
| CO |
1476 |
Colorado |
Construction
of McCaslin Boulevard US 36 Interchange in Superior |
1,000,000 |
|
| CO |
2990 |
Colorado |
Bromley
Lane and US 85 interchange feasibility study and construction of needed
improvements |
1,000,000 |
|
| CO |
2001 |
Colorado |
Construct
trail to extend the Pequonnock Valley rail-trail through Trumbull and into
Bridgeport, CT |
500,000 |
|
| CT |
642 |
Connecticut |
Construct
Route 11 Extension and Greenway from Salem to Waterford |
16,000,000 |
|
| CT |
1056 |
Connecticut |
Construct
New arterial roadway from Boston Avenue north to roposed Lake Success
Business Park in Bridgeport, CT |
10,000,000 |
|
| CT |
1492 |
Connecticut |
Construct
UCONN Storrs Campus-Hillside Road |
5,000,000 |
|
| CT |
2281 |
Connecticut |
Make
Improvements to Montville-Preston Mohegan Bridge |
3,000,000 |
|
| CT |
3217 |
Connecticut |
|
3,000,000 |
|
| CT |
1311 |
Connecticut |
Construct
Farmington Canal Greenway enhancements, New Haven and Hamden |
2,500,000 |
|
| CT |
1131 |
Connecticut |
Construct
high-speed rail crossing to bike and pedestrian trails -Enfield, CT |
2,300,000 |
|
| CT |
145 |
Connecticut |
Improve
Route 1 between East Avenue and Belden Avenue, Norwalk, CT |
2,000,000 |
|
| CT |
232 |
Connecticut |
Reconstruct
Pearl Harbor Memorial Bridge, New Haven |
2,000,000 |
|
| CT |
980 |
Connecticut |
Construct
Valley Service Road Extension, North Haven |
2,000,000 |
|
| CT |
1197 |
Connecticut |
Construct
Shoreline Transportation Enhancement Projects, Guilford, Branford, East Haven
|
2,000,000 |
|
| CT |
1640 |
Connecticut |
Undertake
road improvements associated with Coltsville Area Redevelopment, Hartford |
2,000,000 |
|
| CT |
1714 |
Connecticut |
Upgrade Mark Twain
Drive, Harçford |
2,000,000 |
|
| CT |
1885 |
Connecticut |
Reconstruct
1-95/1-91 interchange and construct pedestrian walkway, New Haven |
2,000,000 |
|
| CT |
2924 |
Connecticut |
Enfield,
Connecticut Make improvements to South Maple Street Bridge |
1,910,000 |
|
| CT |
978 |
Connecticut |
Broad Street Reconstruction Project in New Britain |
1,800,000 |
|
| CT |
507 |
Connecticut |
Reconstruction
and conversion of Union Station in North Canaan to establish a transportation
museum |
1,705,000 |
|
| CT |
1672 |
Connecticut |
Reconstruct
Waterfront Street Corridor, New Haven |
1,500,000 |
|
| CT |
2006 |
Connecticut |
Reconstruction
of State Route 111 from Purdy Hill Road to Fan Hill Road, Monroe, CT |
1,500,000 |
|
| CT |
2066 |
Connecticut |
1-84
Danbury Exits 1-11 Upgrade Interchanges |
1,500,000 |
|
| CT |
2585 |
Connecticut |
Street
and streetscape improvements along Campbell Ave., West Haven |
1,500,000 |
|
| CT |
2799 |
Connecticut |
Reconstruct
and widen Homer St and Chase Ave in Waterbuiy from Waterville Ave to
Nottingham Terrace |
1,500,000 |
|
| CT |
1262 |
Connecticut |
Construct
and Widen Stamford Rail Underpass & Road Realignment Project |
1,000,000 |
|
| CT |
1344 |
Connecticut |
Construct
Quinnipiac Linear Trail, Wallingford |
1,000,000 |
|
| CT |
1570 |
Connecticut |
Construct
bike/pedestrian path, Shelton |
1,000,000 |
|
| CT |
2322 |
Connecticut |
Construct
Entrance Ramp at Route 8 Exit]], Shelton, CT |
1,000,000 |
|
| CT |
2946 |
Connecticut |
Conduct
multi-modal study ofRoute 8 corridor between Beacon Falls-Seymour town line
and exit 40 |
1,000,000 |
|
| CT |
3221 |
Connecticut |
|
1,000,000 |
|
| CT |
3281 |
Connecticut |
Construction
of Housatonic River Walk, Shelton, CT |
1,000,000 |
|
| CT |
469 |
Connecticut |
Reconstructoin
of Lakeville Center to improve pedestrian and vehicle safety at the
intersection of Routes 41 and 44 |
895,000 |
|
| CT |
1249 |
Connecticut |
Relocation
of Edmond Road in Newtown and construction of additional turning lanes at Rte
6 and Commerce and Edmond Rds |
600,000 |
|
| CT |
1542 |
Connecticut |
Construct
roadway on East Commerce Drive, Oxford, CT |
500,000 |
|
| CT |
3223 |
Connecticut |
|
500,000 |
|
| CT |
3278 |
Connecticut |
Make
Improvements to North Stonington, CT Westerly, R.I. Pawcatuck River Bridge |
500,000 |
|
| CT |
812 |
Connecticut |
Make
Improvements to Groton Bicycle and Pedestrian Trails and Facilities |
380,000 |
|
| CT |
2492 |
Connecticut |
Make
Improvements to Plainfield Moosup Pond Road |
300,000 |
|
| CT |
2927 |
Connecticut |
Make
Improvements to Plainfield Cemetaiy Road |
300,000 |
|
| CT |
1916 |
Connecticut |
Construct Pomfret
Pedestrian Bridge |
120,000 |
|
| CT |
2682 |
Connecticut |
Construct
bike and pedestrian paths along Salem Greenway - Salem, CT |
100,000 |
|
| CT |
3237 |
Connecticut |
|
100,000 |
|
| CT |
2164 |
Connecticut |
Construct Putnam curb cuts
|
50,000 |
|
| DE |
2623 |
Delaware |
Reconstructing
1-95/SR-i interchange, adding a fifth lane, and replacing toll plaza on
Delaware’s portion of 1-95 corridor |
5,000,000 |
|
| DE |
2943 |
Delaware |
Replacement
of the Indian River Inlet Bridge, Sussex County Delaware |
4,000,000 |
|
| DC |
1105 |
District of Columbia |
11th
St. Bridges, Rehabilitation of structures as well as new ramps to provide for
traffic at Naiy Yard, Southeast Federal Ctr., and
Gateway Government Ctr |
32,000,000 |
|
| DC |
1547 |
District of Columbia |
Replace
and reconstruct South Capitol Street/Frederick Douglass Memorial Bridge |
30,000,000 |
|
| DC |
791 |
District of Columbia |
Metro Branch Trail
Construction |
2,000,000 |
|
| DC |
3060 |
District of Columbia |
1,000,000 |
|
| FL |
781 |
Florida |
1-75
Widening and Improvements in Collier and Lee County, Florida |
45,000,000 |
|
| FL |
931 |
Florida |
Widening
and Improvements for 1-75 in Collier and Lee County |
27,000,000 |
|
| FL |
1689 |
Florida |
Construct
widening of US 17 to 4 lanes from San Mateo to Volusia County line, Putnam
County, Florida |
16,300,000 |
|
| FL |
188 |
Florida |
1-95
Interchange in the City ofBoca Raton |
14,250,000 |
|
| FL |
3027 |
Florida |
Church Street
Improvements, Orlando |
13,000,000 |
|
| FL |
1525 |
Florida |
Four-laning
SR 281 (Avalon Boulevard) in Santa Rosa County from Interstate 10 to north of
CSXRR Bridge |
12,500,000 |
|
| FL |
811 |
Florida |
A new interchange with the Pineda Causeway Extension and I- |
11,000,000 |
|
| FL |
1692 |
Florida |
Design
and construct replacement for A. Max Brewer Bridge, Titusville |
10,000,000 |
|
| FL |
2493 |
Florida |
Construction
design ROW US27from SR 540 to SR544 & from 1-4 to US 192 in Polk County,
FL |
10,000,000 |
|
| FL |
2693 |
Florida |
Capital Circle
Northwest, Tallahassee |
10,000,000 |
|
| FL |
865 |
Florida |
Improvements
to 1-75 in the City of Pembroke Pines, Florida |
9,750,000 |
|
| FL |
265 |
Florida |
Homestead,
FL Widening ofSW328from SWI37Ave to 152 Ave |
7,000,000 |
|
| FL |
581 |
Florida |
US.
19 Continuous right turn lanes in Pasco County |
7,000,000 |
|
| FL |
1053 |
Florida |
Widen
State Road 50 in Lake County, Florida |
7,000,000 |
|
| FL |
3121 |
Florida |
|
6,600,000 |
|
| FL |
2790 |
Florida |
Grand
Lagoon Bridge Replacement Project. The replacement of a two lane bridge with
a four lane bridge |
6,500,000 |
|
| FL |
114 |
Florida |
Widen
County Line Road (CR 578) from Suncoast Parkway to US41 to four lanes |
6,000,000 |
|
| FL |
1024 |
Florida |
New
systems interchange ramps at SR 417 and Boggy Creek Road in Orange County, FL
|
6,000,000 |
|
| FL |
1980 |
Florida |
Sand Lake Road Improvements between Presidents Drive and |
6,000,000 |
|
| FL |
2232 |
Florida |
Depot Ave.
Enhancements, Gainesville |
6,000,000 |
|
| FL |
3011 |
Florida |
Construction
of an interchange at Florida’s Turnpike & Stirling Rd. in Broward County |
5,538,959 |
|
| FL |
1783 |
Florida |
|
5,500,000 |
|
| FL |
3150 |
Florida |
|
5,300,000 |
|
| FL |
794 |
Florida |
Construct
access road to link Jacksonville International Airport to 1-95 |
5,000,000 |
|
| FL |
1179 |
Florida |
Construct
Route 9Bfrom US] to Route 9A (1-295) to the Duval County line |
5,000,000 |
|
| FL |
2316 |
Florida |
Construct
new bridgefrom West -Florida Turnpike to CR 714 to 36th Street--cross S. Fork
of St. Lucie River--Indian Street to US ion east
side |
5,000,000 |
|
| FL |
2791 |
Florida |
Construct
SR 9B Extension, St. Johns County, Florida |
4,400,000 |
|
| FL |
1203 |
Florida |
Construct
SR 20 connection to SR 100 via CR 309-C, Putnam County, Florida |
4,300,000 |
|
| FL |
783 |
Florida |
Design
and construction of double-deck roadway system exiting FLL airport connecting
Y.S. 1 and 1-595 |
4,000,000 |
|
| FL |
902 |
Florida |
Six
lane expansion of State Road 200 (AlA) from Interstate 95 east to Amelia
Island |
4,000,000 |
|
| FL |
2511 |
Florida |
Replace Columbus Drive
Bridge |
4,000,000 |
|
| FL |
842 |
Florida |
Fund
advanced Right-of-Way Acquisition along SR 52 in Pasco County, Florida |
3,700,000 |
|
| FL |
908 |
Florida |
Widen State Road
80, Hendiy County |
3,500,000 |
|
| FL |
332 |
Florida |
Construction
ofpaved road over existing unpaved roadway on SE 144th Ave from SR 100 to US
301, distance of 1.2 miles |
3,000,000 |
|
| FL |
492 |
Florida |
S.R.43
(U.S.301) Improvement Project - Ellentown to Parrish, Florida |
3,000,000 |
|
| FL |
699 |
Florida |
Construction
of 4 lane highway around Jacksonville connecting US] to Route 9A |
3,000,000 |
|
| FL |
947 |
Florida |
Widen
West Virginia Drive from Floresta Drive to US] in St. Lucie |
3,000,000 |
|
| FL |
1079 |
Florida |
Widen
SR 710 by 2 lanes from Congress Avenue to US-i |
3,000,000 |
|
| FL |
1497 |
Florida |
Acquire
Land and Construct the Englewood Interstate Connector in Sarasota County,
Florida |
3,000,000 |
|
| FL |
1899 |
Florida |
Acquire
right-of-way and construct. East- West Connector from SR 37 to SR 563 in
Lakeland, FL |
3,000,000 |
|
| FL |
2035 |
Florida |
Replace Platt Street
Bridge |
3,000,000 |
|
| FL |
2455 |
Florida |
Temple Terrace
Highway Modification |
3,000,000 |
|
| FL |
2767 |
Florida |
Conduct
planning and engineering for US 17 widening and improvements in Hardee
County, Florida |
3,000,000 |
|
| FL |
2944 |
Florida |
Construct
link from 1-95 to I-JO through Clay County with terminus points SR23 to CAR
739B |
3,000,000 |
|
| FL |
3190 |
Florida |
|
3,000,000 |
|
| FL |
1068 |
Florida |
Widen
Palm Coast Parkway and 1-95 interchange and overpass, Flagler County, Florida
|
2,900,000 |
|
| FL |
2393 |
Florida |
Construct
St. Augustine to Palatka Rail Trail; Florida |
2,900,000 |
|
| FL |
681 |
Florida |
Reconstruction
of Hanford Boulevard, North Miami Beach |
2,750,000 |
|
| FL |
738 |
Florida |
Construct
US 1/SR 100 Connector, Bunnell, Florida |
2,500,000 |
|
| FL |
758 |
Florida |
Implement
Blue Heron Boulevard Streetscape Improvements, City of Riviera Beach |
2,500,000 |
|
| FL |
977 |
Florida |
Homestead,
FL Widening of SW 320 Street (Mowry Drive) from FlaglerAvenue to SWl87Avenue |
2,500,000 |
|
| FL |
1403 |
Florida |
Implement
Kennedy Boulevard corridor improvements to improve safety in Tampa |
2,500,000 |
|
| FL |
3038 |
Florida |
Implement
Busch Boulevard corridor improvements to improve safety in Tampa |
2,500,000 |
|
| FL |
314 |
Florida |
Hollywood
US Route 1 Young Circle Safety Improvement |
2,300,000 |
|
| FL |
228 |
Florida |
Construct
Saxon Boulevard Extension, Volusia County, Florida |
2,100,000 |
|
| FL |
333 |
Florida |
Construct
1-4 Frontage Rd. Volusia County, Florida |
2,000,000 |
|
| FL |
475 |
Florida |
US. Highway 19 Bayside
Segment |
2,000,000 |
|
| FL |
610 |
Florida |
Widen
Midway Roadfrom South 25th Street to US. 1 in St. Lucie County |
2,000,000 |
|
| FL |
1069 |
Florida |
Deiray
Beach Federal Highway pedestrian improvements SE 4th Street to NE 4th Street |
2,000,000 |
|
| FL |
1089 |
Florida |
Construction
and Design of Miami River Greenway Road Improvements and 5th Street
Improvements |
2,000,000 |
|
| FL |
1111 |
Florida |
Kennedy
Blvd. Reconstruction, Eatonville |
2,000,000 |
|
| FL |
1295 |
Florida |
Town of
Southwest Ranches Urban Interchange |
2,000,000 |
|
| FL |
1544 |
Florida |
Plan
and Construct 17th Street connector in the City of Sarasota, FL |
2,000,000 |
|
| FL |
1552 |
Florida |
Alleviate
congestion at Atlantic Corridor Green way Network, City of Miami Beach, FL |
2,000,000 |
|
| FL |
1634 |
Florida |
Conduct
study for Port of Miami Tunnel, Miami, FL |
2,000,000 |
|
| FL |
1844 |
Florida |
Design
and construct capacity and safety improvements for State Road 426-County Road
419 in Oviedo from Pine St to west of Lockwood
Blvd |
2,000,000 |
|
| FL |
1857 |
Florida |
Fund
improvement of US 301 corridor in Sumter and Marion Counties |
2,000,000 |
|
| FL |
1891 |
Florida |
Implementation
of the Advanced Traffic Managament System, Boca Raton, FL |
2,000,000 |
|
| FL |
2130 |
Florida |
Design
and construct Dunn Avenue Extension, Volusia County |
2,000,000 |
|
| FL |
2236 |
Florida |
Conduct
planning and engineering for SR 70 widening in Hardee, DeSoto and Okeechobee |
2,000,000 |
|
| FL |
2596 |
Florida |
Roadway
construction of SW 62 - SW24 Avenue in Gainesville |
2,000,000 |
|
| FL |
2670 |
Florida |
Construct access road to entrances to Opa-Locka Airport at |
2,000,000 |
|
| FL |
2714 |
Florida |
Plant City
Traffic Management System |
2,000,000 |
|
| FL |
2807 |
Florida |
Construct
bridges on SR7J 0 in Palm Beach County |
2,000,000 |
|
| FL |
936 |
Florida |
Construct
pedestrian underpass and safety improvements at SR AlA and Castillo Drive,
City of St. Augustine |
1,600,000 |
|
| FL |
965 |
Florida |
Construct
landscaped sidewalks, bus lanes, pedestrian/bicycle ,aths, vehicular lanes,
City of Plantation |
1,536,041 |
|
| FL |
560 |
Florida |
Acquisition,
engineering, and construction of West Avenue Connector Bridge, City of Miami
Beach, FL |
1,500,000 |
|
| FL |
722 |
Florida |
West
Relief Bridge Rehabilitation, Bay Harbor Islands |
1,500,000 |
|
| FL |
844 |
Florida |
SoutelDrive
Road Enhancements, Jacksonville |
1,500,000 |
|
| FL |
1022 |
Florida |
Construct
bicycle and pedestrian undperpass and park under 1-95, Miami |
1,500,000 |
|
| FL |
1084 |
Florida |
Construct
US 17-92 improvements, Maitland, Florida |
1,500,000 |
|
| FL |
1845 |
Florida |
Coordinated Regional Transportation Study of US 98 from |
1,500,000 |
|
| FL |
1880 |
Florida |
Arlington
Expressway Access Rd., Jacksonville |
1,500,000 |
|
| FL |
2688 |
Florida |
44th
St. Extension to Golfair Blvd, Jacksonville |
1,500,000 |
|
| FL |
2711 |
Florida |
Springfield
Rd. Improvements, Jacksonville |
1,500,000 |
|
| FL |
3288 |
Florida |
Coordinated Regional Transportation Study of US 98 from |
1,500,000 |
|
| FL |
1823 |
Florida |
Construct
North Ormond Beach Business Park Interchange at 1-95 between US. 1 and SR 40,
Volusia County |
1,100,000 |
|
| FL |
58 |
Florida |
Construct
a new bridge at Indian Street, Martin County |
1,000,000 |
|
| FL |
117 |
Florida |
Construct
East Central Regional Rail Trail in Volusia County, Florida |
1,000,000 |
|
| FL |
484 |
Florida |
Implement
NE 6th Street/Sistrunk Boulevard Streetscape and Enhancement Project, City of
Ft. Lauderdale |
1,000,000 |
|
| FL |
542 |
Florida |
Fund
design phase for widening US 41 north of Dunnellon to four lanes |
1,000,000 |
|
| FL |
549 |
Florida |
Construct
Flagler Avenue Improvements, City of Key West, Florida |
1,000,000 |
|
| FL |
795 |
Florida |
Widening
of SR 60 from 66th Avenue to 1-95 in Indian River County, FL |
1,000,000 |
|
| FL |
1141 |
Florida |
Construct
Atlantic Boulevard Improvements, Key West, Florida |
1,000,000 |
|
| FL |
1186 |
Florida |
Improvements
to Eller Drive including right-of-way acquisition and construction of return
loop connector |
1,000,000 |
|
| FL |
1225 |
Florida |
Croos Creek Boulevard
Widening |
1,000,000 |
|
| FL |
1288 |
Florida |
US
1 six laning from St. Lucie County line to south of 4th St in Indian River
County, FL |
1,000,000 |
|
| FL |
1309 |
Florida |
West Palm
Beach, Florida, Flagler Drive Reconfiguration |
1,000,000 |
|
| FL |
1341 |
Florida |
Implement
Snake Road (BL4 Route 1281) Widening and Improvements |
1,000,000 |
|
| FL |
1560 |
Florida |
Airport Access Rd.,
Gainesville |
1,000,000 |
|
| FL |
1963 |
Florida |
Construct
interchange at 1-95 and Matanzas Woods Parkway, Flagler County |
1,000,000 |
|
| FL |
1995 |
Florida |
Traffic
Reconfiguration of SR 934 and US 1 Route, Miami |
1,000,000 |
|
| FL |
2124 |
Florida |
Destiny Rd
Reconstruction, Eatonville |
1,000,000 |
|
| FL |
2377 |
Florida |
Construction
of Little Venice Road, Marathon, FL |
1,000,000 |
|
| FL |
2410 |
Florida |
Coral
Way, SR 972 Highway Beau%flcation, Phase One, Miami Florida |
1,000,000 |
|
| FL |
2698 |
Florida |
Palm Bay
Parkway from Emerson Drive to US 192, Palm Bay, FL |
1,000,000 |
|
| FL |
2721 |
Florida |
Construct
Eastern Connector from SR 417 to 1-95, Volusia & Seminole Counties
Florida |
1,000,000 |
|
| FL |
2773 |
Florida |
AlA
Transportation Enhancements, Daytona Beach |
1,000,000 |
|
| FL |
2800 |
Florida |
Construct new east-west road from the intersection of Beeline |
1,000,000 |
|
| FL |
2841 |
Florida |
New
Kings Rd. Pedestrian Overpass & Enhancements, Jacksonville |
1,000,000 |
|
| FL |
2859 |
Florida |
Construct
Interstate-4/ Crosstown Connector |
1,000,000 |
|
| FL |
654 |
Florida |
US
441 Traffic Improvements —Road sutface, road access, curb, gutter, and right
of way, Miami Gardens |
900,000 |
|
| FL |
434 |
Florida |
Shapes
Ferry Bridge replacement in Marion County |
800,000 |
|
| FL |
852 |
Florida |
Acquire
Right-of- Way for Ludlam Trail, Miami, Florida |
750,000 |
|
| FL |
95 |
Florida |
Improve
pedestrian and bicycle sidewalks, lighting, and ADA ramps---Main Street,
Canal Street, Miramar |
600,000 |
|
| FL |
32 |
Florida |
Construction
a new multi-lane tunnel below the channel to link the Port of Miami on Dodge
Island with 1-395 on Watson Island and 1-95 in
Downtown Miami |
500,000 |
|
| FL |
328 |
Florida |
Construct
interchange improvements at 1-75 and University Parkway |
500,000 |
|
| FL |
522 |
Florida |
Construct
Downtown Bypass Roadway Connector, Lake Mary, Florida |
500,000 |
|
| FL |
675 |
Florida |
Planning
and design for development offuture highway connections to the Southwest
Florida International Airport |
500,000 |
|
| FL |
988 |
Florida |
Us] 7-92
and French Ave. Roundabout, Sanford |
500,000 |
|
| FL |
1305 |
Florida |
Construct
College Road Improvements, Key West, Florida |
500,000 |
|
| FL |
1324 |
Florida |
Normandy
Blvd. & Cassat Ave. Transportation Enhancements, Jacksonville |
500,000 |
|
| FL |
2036 |
Florida |
Access Rd.
Streetscaping, Sanford Airport |
500,000 |
|
| FL |
764 |
Florida |
Construct
US 1 Improvements, Cities of Holly Hill and Ormond Beach, Florida |
400,000 |
|
| FL |
1949 |
Florida |
City
of Wilton Manors Powerline Road Streetscape Enhancement Project |
375,000 |
|
| FL |
338 |
Florida |
Bicycle
and Pedestrian Improvements in the Town of Windermere, Florida |
300,000 |
|
| GA |
2336 |
Georgia |
Construct
US 411 Connector from US 41 to 1-75, Bartow Countj Georgia |
21,350,000 |
|
| GA |
2715 |
Georgia |
SR
347 widen-new construction from 1-985 toSR 211, Hall County, Georgia |
10,000,000 |
|
| GA |
2367 |
Georgia |
SR
92 relocation from Durelee Road to SR 92 at Malone, including grade
separation, Douglas County, Georgia |
8,000,000 |
|
| GA |
2686 |
Georgia |
1-20
West from SR 5 BillArp to SR 6- HOVLanes |
7,250,000 |
|
| GA |
2083 |
Georgia |
Construction
of infrastructure for inter-parcel access, median upgrades, lighting, and
beautfication along Highway 78 corridor |
6,500,000 |
|
| GA |
2846 |
Georgia |
Install wallcways, bridges, lighting, landscaping in Water |
6,020,083 |
|
| GA |
2250 |
Georgia |
Construction
of interchange on 1-985 north of SR-13, Hall County Georgia |
5,000,000 |
|
| GA |
2459 |
Georgia |
Streetscape,
Pedestrian Improvements in City Center, City of Clarkston |
5,000,000 |
|
| GA |
267 |
Georgia |
SR
4 widen from Milledgeville Road to Government Street, Richmond County |
4,000,000 |
|
| GA |
558 |
Georgia |
US
341 US 41 SR 7 from Barnesville to SR 3, Georgia |
4,000,000 |
|
| GA |
959 |
Georgia |
Construct
and Improve Westside Parkway, Northern Section, in Fulton County |
4,000,000 |
|
| GA |
1082 |
Georgia |
Widen SR 104 from SR 383/Belaire Road to CR |
4,000,000 |
|
| GA |
2027 |
Georgia |
US 17/SR
404 Spur, Back River bridge replacement, Savannah |
4,000,000 |
|
| GA |
2630 |
Georgia |
Widen
Old Petersburg Road-Old Evans Roadfrom Baston Road to Washington Road,
Columbia County, Georgia |
4,000,000 |
|
| GA |
3179 |
Georgia |
|
4,000,000 |
|
| GA |
1048 |
Georgia |
GA
400 and McGinnis Ferry Road Interchange, Forsyth County, GA |
3,900,000 |
|
| GA |
916 |
Georgia |
Widening
Cedarcrest Road from Paulding County line to Governors Towne |
3,150,000 |
|
| GA |
2535 |
Georgia |
SR
36 passing lanes north of Jackson to Newton County line, Butts County,
Georgia |
3,050,000 |
|
| GA |
529 |
Georgia |
Upgrade
Safety of Bicycle and Pedestrian Access to Public Schools, Dekalb County |
3,000,000 |
|
| GA |
1055 |
Georgia |
Widen
SR 85 from SR 74 to County Route 126 Bernhard Road, Fayette County, Georgia |
3,000,000 |
|
| GA |
1104 |
Georgia |
Construct
Pedestrian Safety Improvements on Buford Hwy (SR-13), Dekaib County |
3,000,000 |
|
| GA |
1150 |
Georgia |
Social
Circle bjpass completion, from Stanford Road to SR 11, Social Circle |
3,000,000 |
|
| GA |
1376 |
Georgia |
Effingham
Parkway to Connect SR1I9 to SR3O |
3,000,000 |
|
| GA |
1484 |
Georgia |
National
Infantry Museum Transporation Network |
3,000,000 |
|
| GA |
3089 |
Georgia |
|
3,000,000 |
|
| GA |
165 |
Georgia |
Extend
the south Toccoa Bypass east of Toccoa to CR 311, four lanes for
approximately 5.7 miles on new location |
2,900,000 |
|
| GA |
785 |
Georgia |
Construct
the West Cleveland Bypass from US 129SR 11 near Hope Road exteding west of
Cleveland, on new and existing locations to SR7S |
2,900,000 |
|
| GA |
1041 |
Georgia |
Construction
of bypass around town of Hiram, from SR 92 to US 278, Paulding County,
Georgia |
2,500,000 |
|
| GA |
2968 |
Georgia |
Athens-Clarke
County Greenway Enhancement Project |
2,320,000 |
|
| GA |
132 |
Georgia |
Construct
Waycross East Bypass from US 84 in Pierce County, Georgia to US 1 in Ware
County, Georgia |
2,200,000 |
|
| GA |
497 |
Georgia |
Widen
SR 133 from Spence Field to SR 35 in Colquitt County, Georgia |
2,000,000 |
|
| GA |
645 |
Georgia |
Widen
US 17 SR 25 from Yacht Drive to Harry Driggers Boulevard, Glynn County,
Georgia |
2,000,000 |
|
| GA |
1163 |
Georgia |
Interstate
75/ Windy Hill Road Interchange |
2,000,000 |
|
| GA |
1222 |
Georgia |
Improvement
and construction of SR 40 from east of St. Marys cutoff at mile post 5.0,
Chariton County to County Route 61, Camden County,
Georgia |
2,000,000 |
|
| GA |
1224 |
Georgia |
Georgia
Construct Three Greenway Trail Project, Dekaib County |
2,000,000 |
|
| GA |
1518 |
Georgia |
Create
a greenway trail along the Oconee River connecting ,arks, preserving historic
sites, and promoting economic development |
2,000,000 |
|
| GA |
1529 |
Georgia |
Rebuild
SR-JO Memorial Drive for bicycle and pedestrian safety, from Mountain Drive
to Goldsmith Road, Dekalb County |
2,000,000 |
|
| GA |
1566 |
Georgia |
Northside Drive
Multi Modal Corridor |
2,000,000 |
|
| GA |
2101 |
Georgia |
Construct
access roads on Airport Loop road in Hapeville |
2,000,000 |
|
| GA |
2554 |
Georgia |
Memorial Drive Corridor |
2,000,000 |
|
| GA |
2845 |
Georgia |
Johnson
Ferry Road Glenridge Drive Widening; Abernathy Road to Hammond Drive |
2,000,000 |
|
| GA |
3055 |
Georgia |
Widen and construct US 84 Connector Bypass fi-om west of |
2,000,000 |
|
| GA |
2341 |
Georgia |
Reconstruct
the interchange at Interstate 185 and Victory Drive (SR 520), Columbus, GA
Victory Drive (SR 520), Columbus, GA |
1,806,000 |
|
| GA |
213 |
Georgia |
US.
19/SR92 median workfrom Ellis RD to West Taylor ST, Griffin |
1,500,000 |
|
| GA |
659 |
Georgia |
Build a
bridge across Big Indian Creek, Perry |
1,500,000 |
|
| GA |
1101 |
Georgia |
1-285
Riverside interchange reconstruction, Fulton County, Georgia |
1,500,000 |
|
| GA |
1473 |
Georgia |
Construct
and Improve Cobb County Trails |
1,500,000 |
|
| GA |
1502 |
Georgia |
1-75
lanes from Aviation Boulevard to SR 54, Clayton County |
1,500,000 |
|
| GA |
2170 |
Georgia |
1-20
HOV lanes from Evans Mill Road to Salem Road, Dekalb and Rockdale Counties |
1,500,000 |
|
| GA |
2306 |
Georgia |
SR
85 widening from Adams DR to 1-75 and reconstruct the Forest Parkway
interchange, Clayton County |
1,500,000 |
|
| GA |
3176 |
Georgia |
|
1,500,000 |
|
| GA |
1491 |
Georgia |
Athens-Clarke
County Bike Trail Project |
1,400,000 |
|
| GA |
1385 |
Georgia |
Construction
of the Truman Linear Park Trail-Phase II |
1,260,000 |
|
| GA |
2136 |
Georgia |
Greene
County, Georgia conversion of 1-20 and Carey Station Road oveipass to full
interchange |
1,200,000 |
|
| GA |
244 |
Georgia |
Construction
on US 82 from Dawson to Alabama Line |
1,000,000 |
|
| GA |
647 |
Georgia |
Widen
US 280/SR 30 from east of Flint River to SR 300 Connector west of Cordele |
1,000,000 |
|
| GA |
796 |
Georgia |
Widening
of SR 133: Colquitt Co./Daughtery Co |
1,000,000 |
|
| GA |
927 |
Georgia |
Widening
and improvements on Colerain Road in St. Maiys, Georgia |
1,000,000 |
|
| GA |
1080 |
Georgia |
Widen
SR 234/Gillionville Road from Eight Mile Road to Lockett Station, Dougherty
County |
1,000,000 |
|
| GA |
1123 |
Georgia |
Extension
of Sugarloaf Parkway, Gwinnett County |
1,000,000 |
|
| GA |
1126 |
Georgia |
1-285
SR 400 interchange reconstruction and HO V interchange, Fulton County,
Georgia |
1,000,000 |
|
| GA |
1467 |
Georgia |
S.R. 20
widening from 1-575 to S.R. 369, Cherokee County |
1,000,000 |
|
| GA |
1709 |
Georgia |
Construct
Stone Mountain-Lithonia road Bike Lane and Sidewalks, Dekaib County |
1,000,000 |
|
| GA |
1889 |
Georgia |
1-75
interchanges from north of Tflon to Turner County line |
1,000,000 |
|
| GA |
2031 |
Georgia |
SR
400 at SR 120 Old Milton Parkway intersection improvement Fulton County
Georgia |
1,000,000 |
|
| GA |
2179 |
Georgia |
Phase III
Streetscape-Columbus |
1,000,000 |
|
| GA |
2569 |
Georgia |
SR
400 reconstruction from 1285 to McFarland Road, Fulton and Forsyth Counties |
1,000,000 |
|
| GA |
2825 |
Georgia |
SR
133 south bound lane bridge replacement over the Georgia Florida Railnet
line, Dougherty County |
1,000,000 |
|
| GA |
3095 |
Georgia |
|
1,000,000 |
|
| GA |
3194 |
Georgia |
|
1,000,000 |
|
| GA |
3293 |
Georgia |
US 27
Reconstruction from Colguit to CR 279 |
1,000,000 |
|
| GA |
3305 |
Georgia |
Construction
of 1-575 HOVLanes from Sixes Road to S.R. 20, Cherokee County, Georgia |
1,000,000 |
|
| GA |
493 |
Georgia |
Bike
and pedestrian paths and other transportation enhancements at Georgia
Veterans Memorial Park |
800,000 |
|
| GA |
2823 |
Georgia |
Construct
City of Fayetteville, Ga. School Access Bike Ped Project |
625,000 |
|
| GA |
367 |
Georgia |
Intersection
improvement at Harris Drive at SR 42 |
600,000 |
|
| GA |
1154 |
Georgia |
Construct
1-751-575 HOV interchange, Cobb County, Georgia |
600,000 |
|
| GA |
2605 |
Georgia |
Intersection
improvement at Lake Dow Road and SR 81 Harris Dr at SR 42 |
600,000 |
|
| GA |
59 |
Georgia |
Improve
sidewalks, upgrade lighting, and add landscaping in downtown Glennville |
500,000 |
|
| GA |
343 |
Georgia |
South
Tfton Bypass from US 82/SR 520 west to US 319/SR 35 east, Tft County |
500,000 |
|
| GA |
516 |
Georgia |
Broad Avenue Bridge:
Albany |
500,000 |
|
| GA |
808 |
Georgia |
St
reetscape project to improve accessibility and safety for ,edestrians, Mount
Vernon |
500,000 |
|
| GA |
822 |
Georgia |
Install
sidewalks, trails, lighting, and amenities in Balls Feriy Park, Wilkinson
County |
500,000 |
|
| GA |
1151 |
Georgia |
Streetscape
Project to install sidewalks and bicycle trails, Gray |
500,000 |
|
| GA |
1411 |
Georgia |
Construct
sidewalks and install landscaping, Vienna |
500,000 |
|
| GA |
1418 |
Georgia |
SR
316/SR 20 interchange construction Gwinnett, County |
500,000 |
|
| GA |
1606 |
Georgia |
Install
traffic lights and pedestrian walkways on Highway 441 atMLK Jr. Boulevard,
Dublin |
500,000 |
|
| GA |
1650 |
Georgia |
Revitalization
project will extend and resurface the Roberta Walking Trail, Roberta |
500,000 |
|
| GA |
1676 |
Georgia |
Rehabilitate
sidewalks and replace streetlights, Swainsboro |
500,000 |
|
| GA |
1701 |
Georgia |
Riverside
Drive Streetscape Project, Macon |
500,000 |
|
| GA |
1702 |
Georgia |
South Lumpldn Road
Trail-Columbus |
500,000 |
|
| GA |
1721 |
Georgia |
Upgrade
sidewalks and lighting, Lyons |
500,000 |
|
| GA |
2008 |
Georgia |
HWY 78
Corridor Improvement Gwinnett County |
500,000 |
|
| GA |
2217 |
Georgia |
Rockdale
County Veteran ‘sPark — create park trails |
500,000 |
|
| GA |
2237 |
Georgia |
Streetscape-Albany |
500,000 |
|
| GA |
2307 |
Georgia |
Jogging,
and Bicycle Trails around CSU, Columbus |
500,000 |
|
| GA |
2334 |
Georgia |
Sidewalk
revitalization project in downtown Eastman |
500,000 |
|
| GA |
2386 |
Georgia |
Extend
sidewalks, upgrade landscaping in downtown Hawldnsville |
500,000 |
|
| GA |
2417 |
Georgia |
Replace
sidewalks, upgrade lighting, and install landscaping, Soperton |
500,000 |
|
| GA |
2452 |
Georgia |
Replace
sidewalks, upgrade lighting in downtown Vidalia |
500,000 |
|
| GA |
2571 |
Georgia |
Upgrade
sidewalks, replace streetlights, and landscaping, Metter |
500,000 |
|
| GA |
2641 |
Georgia |
Upgrade
sidewalks, parking, street lighting, and landscaping, Claxton |
500,000 |
|
| GA |
3075 |
Georgia |
|
500,000 |
|
| GA |
3151 |
Georgia |
|
500,000 |
|
| GA |
3289 |
Georgia |
Leesburg
North Bypass from US 19 to SR 195, Lee County |
500,000 |
|
| GA |
3291 |
Georgia |
Upgrade
sidewalks, lighting, landscaping from Cherry Street to Hampton Street,
Industrial Park to Dooly Street, Montezuma |
500,000 |
|
| GA |
2276 |
Georgia |
Bridge
replacement on County Road 183-FAS Route 1509, Peach County |
425,000 |
|
| GA |
138 |
Georgia |
Pedestrian
and streetscape improvements, Ellaville |
400,000 |
|
| GA |
225 |
Georgia |
Upgrade
sidewalks and lighting, Wrightsville |
400,000 |
|
| GA |
725 |
Georgia |
Extend
East Greene Street, install streetlights, utilities, and landscaping,
Milledgeville |
400,000 |
|
| GA |
1312 |
Georgia |
Replace
sidewalks, upgrade lighting, and install landscaping, Helena |
400,000 |
|
| GA |
1567 |
Georgia |
Replace
sidewalks, meet ADA guidelines, and install a crosswalk, McRae |
400,000 |
|
| GA |
2737 |
Georgia |
Commission
a study and report regarding the construction and designation of a new
Interstate linking Savannah, Augusta, &
Knoxville |
400,000 |
|
| GA |
3236 |
Georgia |
|
400,000 |
|
| GA |
1940 |
Georgia |
Pave
portions of CR 345, CR 44, and CR 45, Hancock County |
370,000 |
|
| GA |
533 |
Georgia |
Install
landscaping and upgrade lighting on Fall Line Freeway, Reynolds |
350,000 |
|
| GA |
445 |
Georgia |
Streetscape
project to replace sidewalks in downtown Forsyth |
300,000 |
|
| GA |
1536 |
Georgia |
Construct
sidewalks between Marion Middle School, City Par/c and Community Center,
Buena Vista |
300,000 |
|
| GA |
1630 |
Georgia |
Streetscape
project for lighting and landscaping on Main Street along Georgia Highway
231, Davisboro |
300,000 |
|
| GA |
2330 |
Georgia |
Streetscape-Thomasville |
300,000 |
|
| GA |
2473 |
Georgia |
Install
sidewalks on Highway 23froin Dykes Street to Sarah Street, Cochran |
300,000 |
|
| GA |
220 |
Georgia |
Streetscape-Ashburn |
250,000 |
|
| GA |
573 |
Georgia |
Streetscape-Cordele |
250,000 |
|
| GA |
687 |
Georgia |
Rebuild
sidewalks, install sidewalks, and add speed monitoring system, Alamo |
250,000 |
|
| GA |
2560 |
Georgia |
1-75 Welcom Project |
250,000 |
|
| GA |
2764 |
Georgia |
Streetscape-Bainbridge |
250,000 |
|
| GA |
482 |
Georgia |
Resuiface
and widen Jac-.4rt Road as part of the Bleckley County Development Authority
project |
200,000 |
|
| GA |
556 |
Georgia |
Streetscape-Dawson |
200,000 |
|
| GA |
762 |
Georgia |
Streetscape
improvements along La Vista Road in the Northialce business district of
DeKalb County, Georgia |
200,000 |
|
| GA |
1209 |
Georgia |
Streetscape-Quitman |
200,000 |
|
| GA |
1890 |
Georgia |
City
of Savannah, Construct bike and pedestrian paths along Heritage Rail |
200,000 |
|
| GA |
2238 |
Georgia |
Streetscape-Richland |
200,000 |
|
| GA |
2657 |
Georgia |
Design
and construction of 2.2 miles of multi-use trail in the City ofDouglas,
Georgia |
200,000 |
|
| GA |
2722 |
Georgia |
Construction
of the McIntosh Path on SR 99, 7.15 miles between Darien, Georgia and the
Sapelo Island Visitor Center |
200,000 |
|
| GA |
1244 |
Georgia |
Historic
preservation of a city bus station in downtown Eastman |
134,917 |
|
| GA |
495 |
Georgia |
Replace and
upgrade sidewalks, Glenwood |
50,000 |
|
| GU |
77 |
Guam |
Reconstruct
Hagtña River Bridges, Municipality of Hagtfla |
6,600,000 |
|
| GU |
1395 |
Guam |
Piti,
GU Construct Cabras Island Intermodal Facility |
6,000,000 |
|
| GU |
3147 |
Guam |
|
3,000,000 |
|
| GU |
2702 |
Guam |
Guam
Mass Transit Authority Acquisition of transit vehicles for disabled persons |
400,000 |
|
| HI |
2907 |
Hawaii |
Interstate
Route Hi rehabilitation, Kaahumanu Street to Kaimakani Street |
7,430,000 |
|
| HI |
742 |
Hawaii |
Interstate
Route Hi Deck Repair, Airport Viaduct |
4,770,000 |
|
| HI |
894 |
Hawaii |
Interstate
Route Hi guard rail and shoulder improvements, Waikele Bridge to Airport
Interchange, Honolulu |
3,800,000 |
|
| HI |
2104 |
Hawaii |
Construct
Honoapiilani Highway Realignment |
3,000,000 |
|
| HI |
2454 |
Hawaii |
Construct Kapaa Bypass |
3,000,000 |
|
| HI |
3216 |
Hawaii |
|
3,000,000 |
|
| HI |
276 |
Hawaii |
Construct Waimea Bypass |
1,000,000 |
|
| HI |
413 |
Hawaii |
Construct Puanaiko Street |
1,000,000 |
|
| HI |
1035 |
Hawaii |
Construct
access road for Kahului Aiiyort |
1,000,000 |
|
| HI |
1146 |
Hawaii |
Kapolei
Transportation Improvements, Island of Oahu |
1,000,000 |
|
| HI |
2222 |
Hawaii |
Replace
and Rehabilitate Kamehameha Highway Bridges, Island of Oahu |
1,000,000 |
|
| HI |
3006 |
Hawaii |
Upgrades to Farrington
Highway |
1,000,000 |
|
| HI |
1314 |
Hawaii |
Study of
Waianae Coast Emergency Access Road |
500,000 |
|
| HI |
2354 |
Hawaii |
Construct
Bike Lanes on Kalanianaole Highway, vicinity of Makapuu to Keolu Drive |
300,000 |
|
| HI |
1294 |
Hawaii |
Study of
East Hawaii Alternative Road, Island of Hawaii |
200,000 |
|
| ID |
968 |
Idaho |
Improve SH-75
from Timmerman to Ketchum |
5,000,000 |
|
| ID |
634 |
Idaho |
Construct
Washington Street North from Addison Avenue to Pole Line Road |
4,500,000 |
|
| ID |
948 |
Idaho |
Widen
US-95 in Idaho from Jct. SH-1 to Canadian Border |
3,000,000 |
|
| ID |
952 |
Idaho |
analysis of a new bridge over the same river |
3,000,000 |
|
| ID |
914 |
Idaho |
Widen
Amity Roadfrom Chestnut Street to Robinson Road in Nampa, Idaho |
2,000,000 |
|
| ID |
991 |
Idaho |
Widen
US-95 from Top of Lewiston Hill to Moscow, Idaho |
2,000,000 |
|
| ID |
1852 |
Idaho |
Reconstruct
Grangemont Road (Idaho Forest Highway 67) from Orofino to Milepost 9.3 |
2,000,000 |
|
| ID |
2908 |
Idaho |
Construct
Interchange on 1-84 at Ten Mile Rd, Meridian, Idaho |
2,000,000 |
|
| IL |
26 |
Illinois |
Construct
Interchange on Interstate 255 at Dupo/Columbia |
19,000,000 |
|
| IL |
824 |
Illinois |
Reconstruct
Milwaukee Avenue, including Six Corners |
17,000,000 |
|
| IL |
1149 |
Illinois |
Reconstruct
intersection of Wood Dale and Irving Park roads in DuPage County, IL |
12,300,000 |
|
| IL |
1489 |
Illinois |
13 0th
and Torrance Avenue Intersection Improvement, Chicago |
9,000,000 |
|
| IL |
2954 |
Illinois |
Reconstruct
and Widen Route 60 Bridge over 1-94 in Lake Forest |
8,000,000 |
|
| IL |
1964 |
Illinois |
Miller
Road Widening and Improvement, McHenry |
7,955,000 |
|
| IL |
623 |
Illinois |
Construction
of 2 North/South Blvds. and 2 East/West Blvds. in the vicinity of Northern
Illinois University |
7,500,000 |
|
| IL |
2329 |
Illinois |
Resuifacing
of aprrox 30 miles of roadway in Village 0/Oak Lawn |
7,000,000 |
|
| IL |
2913 |
Illinois |
Construction
of a new roadway and grade separation of the UP West Line east of Elburn |
7,000,000 |
|
| IL |
2180 |
Illinois |
Pre-construction
and construction IL 15 over Wabash River at Mt. Cannel |
6,960,000 |
|
| IL |
162 |
Illinois |
Improve
North illinois St and related roads, Belleville |
6,500,000 |
|
| IL |
1026 |
Illinois |
Widen
Rakow Roadfrom Ackman Road to IL Rt 31 in McHenty County, Illinois |
6,400,000 |
|
| IL |
1099 |
Illinois |
Expand
and improve illinois Route 47 Roadway from Reed Road to Kreutzer Road in
Huntley, Illinois |
6,400,000 |
|
| IL |
438 |
Illinois |
Development
and construction of an interchange at Brisbin Rd and Interstate 80 |
6,000,000 |
|
| IL |
2040 |
Illinois |
US
Rt 30 between Williams Street and IL Rt 43 for signals, turn & or
deceleration lanes at 80th Aye, Wolf Rd. Lincoln Way HS and Locust St |
6,000,000 |
|
| IL |
2870 |
Illinois |
Construct
connector road between Collinsville Rd to 1L3/Worth 1st St. St. Clair County |
6,000,000 |
|
| IL |
3246 |
Illinois |
|
6,000,000 |
|
| IL |
1339 |
Illinois |
Construct
underpass at intersection of Damen/Fullerton/Elston Avenues, Chicago |
5,500,000 |
|
| IL |
2309 |
Illinois |
Reconstruct
Winter Aye, existing 1 lane RR subway, and 1 lane bridge to provide access to
Winter Park in Danville |
5,400,000 |
|
| IL |
863 |
Illinois |
Construct
West Corbin Overpass over illinois 255, Bethalto |
5,000,000 |
|
| IL |
3019 |
Illinois |
Offi-amp
and oveipass from 1-57 outside of Marion and necessary connector roads |
5,000,000 |
|
| IL |
809 |
Illinois |
Replacement
of Fullerton Avenue Bridge and Pedestrian Walkway |
4,800,000 |
|
| IL |
2879 |
Illinois |
Extension
North from Rt. 30 to Wheeler Road and Galena Boulevard extension west ofRt.
47 in Sugar Grove, IL |
4,760,000 |
|
| IL |
1419 |
Illinois |
Construct
Pedestrian walkways and streetscaping projects in the Village of Western
Springs |
4,210,000 |
|
| IL |
318 |
Illinois |
Imp rove
Roads and Bridges, Cook County |
4,000,000 |
|
| IL |
1019 |
Illinois |
Widen
US. Route 34 from US. 67 to Carmen Road |
4,000,000 |
|
| IL |
1264 |
Illinois |
Implement
ITS and congestion Mitigation Project on 1-294 and 1-90 |
4,000,000 |
|
| IL |
2295 |
Illinois |
Widen
Annie Glidden Road to fIve lanes with intersection improvements. DeKaib, IL |
4,000,000 |
|
| IL |
2970 |
Illinois |
Irving Park
Bridge over the Chicago River |
4,000,000 |
|
| IL |
3243 |
Illinois |
|
4,000,000 |
|
| IL |
1574 |
Illinois |
Construct
Commuter Parking Structure in the Central Business District in the vicinity
of La Grange Road |
3,700,000 |
|
| IL |
1191 |
Illinois |
For
IDOT to expedite pre-construction and construction to widen 1-55 from
Naperville Road south to 1-80 |
3,500,000 |
|
| IL |
3036 |
Illinois |
Washington Street
Widening, Gurnee |
3,360,000 |
|
| IL |
1161 |
Illinois |
Development
of a coordinated trail system, parking and trial systems in Dixon, IL |
3,200,000 |
|
| IL |
102 |
Illinois |
West Ridge Nature
Preserve, Chicago |
3,000,000 |
|
| IL |
703 |
Illinois |
Upgrade Ridge Avenue, Evanston |
3,000,000 |
|
| IL |
987 |
Illinois |
The
continuation of US Route 12 from the Wisconsin state line to the intersection
of Tryon Grove Road, Route 12 and Illinois State
Route 31 |
3,000,000 |
|
| IL |
1018 |
Illinois |
Widen US.
Route 51 from Pana to Vandalia |
3,000,000 |
|
| IL |
1508 |
Illinois |
Construct
and expand Northwest illinois US Rte 20 from Freeport to Galena, IL |
3,000,000 |
|
| IL |
1815 |
Illinois |
|
3,000,000 |
|
| IL |
2087 |
Illinois |
Increasing
the height on the IL Rt. 82 Railroad Underpass in Geneseo, IL |
3,000,000 |
|
| IL |
2840 |
Illinois |
1-57 and 1-294 Interchange
|
3,000,000 |
|
| IL |
2992 |
Illinois |
Eastern Peoria Bypass |
3,000,000 |
|
| IL |
555 |
Illinois |
State
Street Road Improvements from 43rd Street to IL Rt 157, East St. Louis |
2,945,000 |
|
| IL |
2111 |
Illinois |
Extend
Frank Scott Parkway East Road to Scott AFB, St. Clair County |
2,800,000 |
|
| IL |
1937 |
Illinois |
Intersection
Reconstruction and Bridge Rehabilitation at IL 60 and Peterson Road |
2,500,000 |
|
| IL |
3200 |
Illinois |
|
2,500,000 |
|
| IL |
1457 |
Illinois |
Preconstruction
and Construction at IL 31 from Bull Valley Road to IL 176 |
2,420,000 |
|
| IL |
1279 |
Illinois |
Upgrade
connector road from IL Ri 1-255 to IL Rt 3, Sauget |
2,400,000 |
|
| IL |
1468 |
Illinois |
Road Construction and reconstruction in the Village of |
2,300,000 |
|
| IL |
887 |
Illinois |
Reconstruction and realignment of Baseline Rd, Montgomery, |
2,080,000 |
|
| IL |
57 |
Illinois |
IL
6 to 1-180 - Phase 2 study and land acquisition |
2,000,000 |
|
| IL |
129 |
Illinois |
Construct
streetscape along Morse avenue from Clark street to Sheridan road, Chicago |
2,000,000 |
|
| IL |
140 |
Illinois |
Preconstruction
activities IL 336 from Macomb to Peoria |
2,000,000 |
|
| IL |
296 |
Illinois |
For Will County to begin Phase II engineering and |
2,000,000 |
|
| IL |
321 |
Illinois |
Construct
Reed Station Parkway Extension to IL Rt 3, Carbondale |
2,000,000 |
|
| IL |
786 |
Illinois |
Eliminate
Highway-Railway crossing over US 14 and realignment of US 14, Des Flames |
2,000,000 |
|
| IL |
803 |
Illinois |
Widening
of Old Madison Road, St. Clair County |
2,000,000 |
|
| IL |
1017 |
Illinois |
Widen
US. Route 67from Macomb to illinois 101 |
2,000,000 |
|
| IL |
1364 |
Illinois |
Foster
Avenue at Kedzie Avenue Streetscape |
2,000,000 |
|
| IL |
1527 |
Illinois |
Construction
of a bridge at Stearns Road in Kane County, Illinois |
2,000,000 |
|
| IL |
1785 |
Illinois |
|
2,000,000 |
|
| IL |
1925 |
Illinois |
Design,
land acquistion, and construction of South Main St (IL 2) Corridor from
Beitline Rd to Cedar Street in Rockford, IL |
2,000,000 |
|
| IL |
1987 |
Illinois |
Design,
land acquistion, and construct West State St (US Business 20) from Meridan Rd
to Rockton Ave in Rockford, IL |
2,000,000 |
|
| IL |
2025 |
Illinois |
Resurface
Elston Avenue from Milwaukee to Pulaski, Chicago |
2,000,000 |
|
| IL |
2137 |
Illinois |
Pioneer
Parlcvay upgrade in Peoria - Extension from Allen Road to Route 91 |
2,000,000 |
|
| IL |
2199 |
Illinois |
Construct
illinois Route 336 from Macomb to Peoria |
2,000,000 |
|
| IL |
2269 |
Illinois |
US 67 west
of Jacksonville, IL Bypass to east of IL 100 |
2,000,000 |
|
| IL |
2356 |
Illinois |
Improve Sheridan
Road, Evanston |
2,000,000 |
|
| IL |
2394 |
Illinois |
Construction
of a traffic circle to reduce traffic congestion, Museum Campus Chicago |
2,000,000 |
|
| IL |
2420 |
Illinois |
To
construct an extension of US-Si from .9 miles south of Mowea qua to 4.6 miles
south ofMowea qua |
2,000,000 |
|
| IL |
2528 |
Illinois |
Improve 63rd Street,
Chicago |
2,000,000 |
|
| Il |
3068 |
Illinois |
|
2,000,000 |
|
| IL |
3260 |
Illinois |
Undertake
Traffic Mitigation and Circulation Enhancements on 57th and Lake Shore Drive,
Chicago |
2,000,000 |
|
| IL |
963 |
Illinois |
For engineering, right-of-way acquisition and reconstruction
of two existing lanes on Arsenal Road from Baseline Rd to Rt |
1,750,000 |
|
| IL |
2916 |
Illinois |
Allow IDOT to proceed with engineering and construction of |
1,750,000 |
|
| IL |
3163 |
Illinois |
|
1,750,000 |
|
| IL |
1779 |
Illinois |
|
1,700,000 |
|
| IL |
2658 |
Illinois |
Entry Road to
SlUResearch Park |
1,600,000 |
|
| IL |
3182 |
Illinois |
|
1,600,000 |
|
| IL |
31 |
Illinois |
Reconstruction
of Moclcingbird Lane and Stratford St, Granite City |
1,500,000 |
|
| IL |
1029 |
Illinois |
Perform
Broadway and Sheridan Road signal interconnect project, Chicago |
1,500,000 |
|
| IL |
1459 |
Illinois |
Reconstruct
Lakeshore Drive Overpass over Wilson avenue, Chicago |
1,500,000 |
|
| IL |
1637 |
Illinois |
Reconstruct
Lakeshore Drive overpass over Lawrence Avenue |
1,500,000 |
|
| IL |
1984 |
Illinois |
The
extension of MacArthur Blvd. from Wabash to Iron Bridge Road. Springfield |
1,500,000 |
|
| IL |
2428 |
Illinois |
To connect about a two-mile segment through Collinsville at |
1,500,000 |
|
| IL |
3045 |
Illinois |
Improve Roads and
Bridges, Cicero |
1,500,000 |
|
| IL |
3162 |
Illinois |
|
1,400,000 |
|
| IL |
1649 |
Illinois |
Preconstruction
and Construction at IL 120 at Bacon Road and Cedar Lake Road |
1,365,000 |
|
| IL |
510 |
Illinois |
South Shore
Drive and 67th Underpass |
1,300,000 |
|
| IL |
1914 |
Illinois |
Completion
of the Grand illinois Trail, Cook County |
1,292,500 |
|
| IL |
3261 |
Illinois |
For
the the construction of a highway on new alignment to create a cross town
route across Godfrey |
1,250,000 |
|
| IL |
3300 |
Illinois |
Resurface
Shawnee College Road, Pulaski County |
1,250,000 |
|
| IL |
2106 |
Illinois |
Construction
of a new bicycle-pedestrian bridge in Wayne, IL |
1,200,000 |
|
| IL |
2524 |
Illinois |
Restoration
and reconstruction of the central business district street. Cambridge, IL |
1,200,000 |
|
| IL |
2578 |
Illinois |
For
the construction of the Grand Avenue Underpass, Village of Franklin Park |
1,160,000 |
|
| IL |
562 |
Illinois |
Study,
design, and construction of a designated truck route through the City of
Monticello |
1,132,000 |
|
| IL |
6 |
Illinois |
Land
acquisition for the widening of Rt. 47 in Yorlcille, IL |
1,000,000 |
|
| IL |
10 |
Illinois |
Preconstruction
and Construction of ZL 83 at ZL 132 |
1,000,000 |
|
| IL |
25 |
Illinois |
Paricing facility in
Peoria, IL |
1,000,000 |
|
| IL |
73 |
Illinois |
Upgrade
streets in the City of Rushville, IL |
1,000,000 |
|
| IL |
142 |
Illinois |
Replacement
of bridge on Harlem Avenue, The Village of River Forest |
1,000,000 |
|
| IL |
224 |
Illinois |
Upgrade roads,
The Village of Berkeley |
1,000,000 |
|
| IL |
295 |
Illinois |
For
IDOT to conduct Phase II engineering for reconstruction of 159th St-US 6-IL 7
in Will and Cook Counties |
1,000,000 |
|
| IL |
583 |
Illinois |
Improve
roads, The Village of Westchester |
1,000,000 |
|
| IL |
715 |
Illinois |
Repair
of CH29 and reconstruction of CH 8 at interchanges with Interstate 55 at
Towanda and Lexington illinois |
1,000,000 |
|
| IL |
790 |
Illinois |
East
Peoria, Illinois Technology Blvd. upgrades |
1,000,000 |
|
| IL |
912 |
Illinois |
Widening
and Reconstruction of 55th Street from Holmes Avenue to Williams Street in
Westmont and Clarendon Hills |
1,000,000 |
|
| IL |
1030 |
Illinois |
Widen
US. Highway 30 in Whiteside County, illinois |
1,000,000 |
|
| IL |
1075 |
Illinois |
Land
acquisition, engineering, and construction for the initial 2-lane segments of
the Corridor between 1L31 to 1L25 and other
segments of the Corridor as appropriate |
1,000,000 |
|
| IL |
1272 |
Illinois |
Streetscape
improvements on Blue Island from 19th -21st St. Chicago |
1,000,000 |
|
| IL |
1469 |
Illinois |
Conduct
study and design of Chicago North lakefront path expansion project |
1,000,000 |
|
| IL |
1537 |
Illinois |
Construct
afour lane connection between Rt. 13 and Rt. 45 |
1,000,000 |
|
| IL |
1719 |
Illinois |
Upgrade roads,
The Village ofMaywood |
1,000,000 |
|
| IL |
1749 |
Illinois |
Upgrade
Veterans Drive in Pekin Illinois |
1,000,000 |
|
| IL |
1805 |
Illinois |
|
1,000,000 |
|
| IL |
1809 |
Illinois |
|
1,000,000 |
|
| IL |
1874 |
Illinois |
Henry
Homer Homes CHA Street Construction, City of Chicago |
1,000,000 |
|
| IL |
1945 |
Illinois |
Construct
1-80, Ridgeland Ave. Improvements, Tinley Park |
1,000,000 |
|
| IL |
2063 |
Illinois |
St. Charles
Road, The Village of Beliwood |
1,000,000 |
|
| IL |
2081 |
Illinois |
Pre-construction
and construction activities on US 45/LaGrange Road from 131st Street to 179th
Street |
1,000,000 |
|
| IL |
2150 |
Illinois |
Construct
1290, The Village of Oak Park |
1,000,000 |
|
| IL |
2240 |
Illinois |
improve
Cottage Grove intersection, South Chicago Avenue and 71st Street |
1,000,000 |
|
| IL |
2312 |
Illinois |
Construct pedestrian tunnel at railroad crossing in Winfleld, |
1,000,000 |
|
| IL |
2421 |
Illinois |
Upgrade roads,
The Village of Hillside |
1,000,000 |
|
| IL |
2646 |
Illinois |
Construct
Bridge Overpass, DuSable Museum-Chicago |
1,000,000 |
|
| IL |
2818 |
Illinois |
Road
extension for Redco Drive to Skyline Dr. Williamson County |
1,000,000 |
|
| IL |
3056 |
Illinois |
Project
is a stand-alone roadway improvement consisting of the complete
reconstruction of the roadway, The Village of Forest
Park |
1,000,000 |
|
| IL |
3183 |
Illinois |
|
1,000,000 |
|
| IL |
3187 |
Illinois |
|
1,000,000 |
|
| IL |
36 |
Illinois |
City
of Havana. Illinois Upgrades to Broadway Street |
952,572 |
|
| IL |
985 |
Illinois |
City
of Bartonville, Street widening and improvements and sidewalk improvements |
952,572 |
|
| IL |
2121 |
Illinois |
Village
of South Jacksonville - West Vandalia Road upgrades |
952,572 |
|
| IL |
3158 |
Illinois |
|
952,572 |
|
| IL |
1391 |
Illinois |
Reconstruction
of 5th Street Road (FAS 569)in Logan County, IL |
952,570 |
|
| IL |
2521 |
Illinois |
IL 8 from
East Peoria to Washington, IL |
952,570 |
|
| IL |
2768 |
Illinois |
Traffic
Signalization, Matteson |
907,500 |
|
| IL |
2609 |
Illinois |
Intersection
Reconstruction at US 12-1L31-Tryon Grove Road |
900,000 |
|
| IL |
913 |
Illinois |
Road
upgrades for the Village of Oreana, IL |
884,000 |
|
| IL |
144 |
Illinois |
Construct
Bissel Street Roadway Connector, Tn-City Regional Port District |
850,000 |
|
| IL |
1375 |
Illinois |
Construct
Streetscape Project, Village of Robbins |
800,000 |
|
| IL |
115 |
Illinois |
Improve
GreatRiverRoad, Warsaw |
750,000 |
|
| IL |
1036 |
Illinois |
Improve
Highway-Railroad Crossings, Galesburg |
750,000 |
|
| IL |
1125 |
Illinois |
For
widening from two to four lanes, the Brookmont Boulevard Viaduct in Kankakee,
IL and adjusting approach grades |
750,000 |
|
| IL |
1211 |
Illinois |
Turning
lanes to US Rt. 14 (Northwest Highway) at the Arthur Ave Union Pacflc Grade
in Arlington Heights |
700,000 |
|
| IL |
2282 |
Illinois |
Widen and
improve Pulaski Road, Alsip |
700,000 |
|
| IL |
2486 |
Illinois |
Road
extension for Highway 22 in Macon COunty, IL |
668,000 |
|
| IL |
1207 |
Illinois |
Complete
Heavy Truck Loop for DuQuoin Industrial Park |
625,000 |
|
| IL |
802 |
Illinois |
Construct
four lane extension of IL RT29 from Rochester to Taylorville |
600,000 |
|
| IL |
1596 |
Illinois |
River walk
Reconstruction, City of Chicago |
600,000 |
|
| IL |
1625 |
Illinois |
For
Naperville Township to fund improvements to Diehi Road between Eola Road and
Route 59 |
600,000 |
|
| IL |
1732 |
Illinois |
Construction
of the 43rd Street Bicycle Pedestrian Bridge over Lake Shore Drive, City of
Chicago |
600,000 |
|
| IL |
1861 |
Illinois |
Francis
Cabrini/W Green Homes CHA Street Construction, City of Chicago |
600,000 |
|
| IL |
2267 |
Illinois |
Haisted
Bridge over North Branch Canal Reconstruction, City of Chicago |
600,000 |
|
| IL |
2780 |
Illinois |
Preconstruction
and construction McCarthy Road, Bell Road to US 45 and 123rd Street US 45 to
86th Avenue in Palos Park |
600,000 |
|
| IL |
2987 |
Illinois |
Midlothian
Road Signalization, Lake Zurich |
600,000 |
|
| IL |
3123 |
Illinois |
|
600,000 |
|
| IL |
1712 |
Illinois |
To
contruct a new intersection of a public road and US Route 50 and a new street
|
550,000 |
|
| IL |
1977 |
Illinois |
Robert
Taylor Homes CHA Street Construction, City of Chicago |
550,000 |
|
| IL |
2549 |
Illinois |
Establish
transportation museum on Naiy Pier, Chicago |
540,000 |
|
| IL |
83 |
Illinois |
Improve University
Drive, Macomb |
500,000 |
|
| IL |
398 |
Illinois |
To
construct a new 2-lane road extending 1650 feet north rom intersection with
University Park Drive, Edwardsville |
500,000 |
|
| IL |
736 |
Illinois |
25th
Avenue Grade Separation, Meirose Park |
500,000 |
|
| IL |
749 |
Illinois |
Widening
of Lake Cook Road ITS in Deerfield, IL |
500,000 |
|
| IL |
944 |
Illinois |
Upgrade
traffic signal system on 87th Street, Chicago |
500,000 |
|
| IL |
973 |
Illinois |
Resuifacing
Congress Parkway, The Illinois Department of Transportation |
500,000 |
|
| IL |
1027 |
Illinois |
Widen
US. Route 30 from Rock Falls to Round Grove, Whiteside County |
500,000 |
|
| IL |
1323 |
Illinois |
Improve Great
River Road, Mercer County |
500,000 |
|
| IL |
1378 |
Illinois |
For
Will County for engineering and right-of-way acquisition to extend 95th
Street from Plainfield-Naperville Road east to
Boughton Road |
500,000 |
|
| IL |
1514 |
Illinois |
Improve
US. Route 34 from Kewanee to Kentville Road |
500,000 |
|
| IL |
1541 |
Illinois |
Relocate
Pocket Road for Access to Racehorse Business Park, Alorton |
500,000 |
|
| IL |
1654 |
Illinois |
Construct
Streetscape Project, City of Markham |
500,000 |
|
| IL |
1985 |
Illinois |
Construct
Cedar Creek Linear Park Trail, Quincy |
500,000 |
|
| IL |
2052 |
Illinois |
Preconstruction activities for Sangamon Valley Bicycle Trail |
500,000 |
|
| IL |
2435 |
Illinois |
Improve Mill Street,
Rock Island |
500,000 |
|
| IL |
2463 |
Illinois |
Interstate
41 and Route 176 Interchange replacement |
500,000 |
|
| IL |
2804 |
Illinois |
Establish
transportation museum on Naiy Pier, Chicago |
500,000 |
|
| IL |
2961 |
Illinois |
For
Village ofBolingbrook to construct Remington Blvd. extension |
500,000 |
|
| IL |
3013 |
Illinois |
Install
countdown devices on pedestrian crossing signals on USRoutes 12/20 and50 in
OakLawn |
500,000 |
|
| IL |
277 |
Illinois |
Widening
two blocks of Poplar St from Park Ave to 13th Street, Williamson County |
480,000 |
|
| IL |
21 |
Illinois |
Construct
Bike, Pedestrian Paths, Orland Hills |
400,000 |
|
| IL |
514 |
Illinois |
Resuiface
Cflflon Park Ave. and S. Louis Ave., Village of Evergreen |
400,000 |
|
| IL |
748 |
Illinois |
Construct
Streetscape Project, Orland Hills |
400,000 |
|
| IL |
2007 |
Illinois |
Resurface
Trumbull Ave. and Homan Ave., Evergreen Park |
400,000 |
|
| IL |
2607 |
Illinois |
Resuiface
Yellow Banks Road, Franklin County |
400,000 |
|
| IL |
2857 |
Illinois |
Construct recreational trail from Spring Creek Forest |
400,000 |
|
| IL |
2208 |
Illinois |
For
Village ofLemont to modernize and improve the intersection ofMcCarthy Road,
Derby Road, and Archer Avenue |
350,000 |
|
| IL |
923 |
Illinois |
Improve safety of culvert replacement on 250th Rd between |
320,000 |
|
| IL |
242 |
Illinois |
Construct
new bridge on Illinois Prairie Path over East Branch River in Milton
Township, IL |
300,000 |
|
| IL |
2930 |
Illinois |
Resurfacing
and restrlping Euclid Ave between Walnut Ave and Douglas Ave in Arlington
Heights |
300,000 |
|
| IL |
176 |
Illinois |
Upgrades
for Muller Road in the City of Washington, IL |
280,000 |
|
| IL |
299 |
Illinois |
Construct
Citywide bicycle path network, city of Evanston |
250,000 |
|
| IL |
1155 |
Illinois |
Construct
multi-use pedestrian path between Oakton St. and Dempster St., Skokie |
250,000 |
|
| IL |
2401 |
Illinois |
Install
traffic control devices on traffic signals in Village of OakLawn |
240,000 |
|
| IL |
949 |
Illinois |
Engineering
of the Willow Creek Trail Extension from Rock Cut State Park to the Long
Prairie Trail |
200,000 |
|
| IL |
1515 |
Illinois |
For
Naperville Township to fund improvements to North Aurora Road |
200,000 |
|
| IL |
2429 |
Illinois |
Construct
Parking Facility and pedestrian walkways at 94th an S. Oak Park Ave. Oak Lawn
|
200,000 |
|
| IL |
2902 |
Illinois |
Imp rove Streets,
Westchester |
150,000 |
|
| IL |
456 |
Illinois |
Construction
of a pedestrian sidewalk along S. Chicago Street in Geneseo, IL |
145,000 |
|
| IL |
368 |
Illinois |
Engineering
and construction of the East Branch DuPage River Greenway Trail in central
DuPage County, IL |
100,000 |
|
| IL |
857 |
Illinois |
Traffic Signal Coordination, at US 45 at IL 132 (Grand |
100,000 |
|
| IL |
1168 |
Illinois |
For Village of Lemont to construct a bridge over Chicago |
100,000 |
|
| IL |
1756 |
Illinois |
For
DuPage County to construct certain segments of Southern DuPage County
Regional Trail |
100,000 |
|
| IL |
2457 |
Illinois |
For
the Village of Woodridge to resuiface Intern ationale Parkway |
100,000 |
|
| IL |
3033 |
Illinois |
For
Plainfleld Township Park District to construct DuPage River Bike &
Pedestrian Trail linking Grand Illinois, Midewin, &
I&M Canal Trails |
100,000 |
|
| IL |
2743 |
Illinois |
Improve
safety of a horizontal curve on Clarksville St. .25 mile north of27sth Road
in Grandview Township, Edgar County, illinois |
88,000 |
|
| IN |
1598 |
Indiana |
Design
and construct Indiana Ohio River Bridges Project on I 65 and265 |
20,000,000 |
|
| IN |
2368 |
Indiana |
Construct
169 Evansville to Indianapolis, Indiana |
14,000,000 |
|
| IN |
2346 |
Indiana |
Construction
of Maplecrest Rd Extension -- Allen County, Indiana |
11,000,000 |
|
| IN |
305 |
Indiana |
Widening
road (along Gordon Road, Sixth Street, and West Shafer Drive) to 3-lane
street, with sidewalk and improvements to existing
bridge - White County/Monticello, Indiana |
10,000,000 |
|
| IN |
2189 |
Indiana |
Downtown
road improvements, Indianapolis |
10,000,000 |
|
| IN |
2343 |
Indiana |
Preliminary
engineering, right-of-way, and construction for Perimeter Parkway - West
Lafayette/Purdue University, Indiana |
10,000,000 |
|
| IN |
2224 |
Indiana |
Construct
US 31 Plymouth to South Bend Freeway Project in Marshall and St. Joseph
Counties, Indiana |
8,000,000 |
|
| IN |
366 |
Indiana |
Construct
Interchange at 1-65 and 109th Avenue, Crown Point |
7,454,219 |
|
| IN |
817 |
Indiana |
Construct US231 in Spencer and Dubois Counties in Indiana |
6,000,000 |
|
| IN |
2678 |
Indiana |
Construdtion
of 164 Interchange, Harrison County, Indiana |
5,310,000 |
|
| IN |
2958 |
Indiana |
SR56
Reconstruction, Aurora, Indiana |
5,120,000 |
|
| IN |
2365 |
Indiana |
Realign State Road
312, Hammond |
4,162,891 |
|
| IN |
1573 |
Indiana |
Replace
Samuelson Road Underpass, Portage |
3,162,890 |
|
| IN |
159 |
Indiana |
Construct
interchange for 146th St. and 1-69, Hamilton County, Indiana |
3,000,000 |
|
| IN |
1396 |
Indiana |
Redevelop
and Complete the Cardinal Greenway and Starr- Gennett Area in the City of
Richmond, Indiana |
3,000,000 |
|
| IN |
1956 |
Indiana |
Acquire
right of way for and construct University Parlcway from Upper Mt. Vernon Road
to SR 66 |
3,000,000 |
|
| IN |
2313 |
Indiana |
Construct
Margaret Avenue Safety and Capacity Enhancement Project |
3,000,000 |
|
| IN |
2371 |
Indiana |
Construct
service road parallel to 1-69 in the City of Anderson, Indiana |
3,000,000 |
|
| IN |
3218 |
Indiana |
|
3,000,000 |
|
| IN |
1786 |
Indiana |
|
2,930,000 |
|
| IN |
584 |
Indiana |
Reconstruct
45th Avenue from Colfax Street to Grant Street, Lake County |
2,700,000 |
|
| IN |
3266 |
Indiana |
Construction
of Star Hill Road, Clark County, Indiana |
2,215,000 |
|
| IN |
1669 |
Indiana |
Construct
Hoosier Heartland Highway in Cass and Carroll County, Indiana |
2,000,000 |
|
| IN |
1872 |
Indiana |
Design
engineering, right-of-way acquistion, and construction for the Grant County
Economic Corridor |
2,000,000 |
|
| IN |
2602 |
Indiana |
Improve
campus streets to increase pedestrian safety and ease vehicular congestion in
the City ofAnderson, Indiana |
2,000,000 |
|
| IN |
2976 |
Indiana |
Reconstruct
Standard Avenue, Whiting |
1,300,000 |
|
| IN |
412 |
Indiana |
126th
Street Project, Town of Fishers, Indiana |
1,250,000 |
|
| IN |
1120 |
Indiana |
Design
and construct Tanner Creek Bridge on US5O, Dearborn County Indiana |
1,240,000 |
|
| IN |
2466 |
Indiana |
North
Calumet Avenue Improvements, Valparaiso |
1,200,000 |
|
| IN |
442 |
Indiana |
Improve 100 South,
Porter County |
1,000,000 |
|
| IN |
585 |
Indiana |
Construct
Grade Separation Underpass on Main Street in Mishawaka, Indiana |
1,000,000 |
|
| IN |
619 |
Indiana |
Widen
Old Meridian Street from 2 to 4 lanes, City ofCannel, Indiana |
1,000,000 |
|
| IN |
658 |
Indiana |
Widen US 31
Hamilton County, Indiana |
1,000,000 |
|
| IN |
678 |
Indiana |
Reconstruct
and widen Shelby County Indiana 500 East from I200Nto USS2 |
1,000,000 |
|
| IN |
2013 |
Indiana |
Construct
US 31 Kokomo Corridor Project for Kokomo Howard County, Indiana |
1,000,000 |
|
| IN |
934 |
Indiana |
Widen
Wheeling Avenue from Centennial to McGalliard Road in the City of Muncie,
Indiana |
960,000 |
|
| IN |
433 |
Indiana |
Upgrade
Traffic Signals Phase III in the City of Muncie, Indiana |
640,000 |
|
| IN |
775 |
Indiana |
Extend
Everbrook Drive from SR 332 to Bethel Avenue in the City of Muncie, Indiana |
640,000 |
|
| IN |
1475 |
Indiana |
Improve
Intersection at Jackson Street and Morrison Road in the City of Muncie,
Delaware County, Indiana |
560,000 |
|
| IN |
215 |
Indiana |
Construction
of Dixon Roadfrom Markiand Avenue to Judson Road in Kokomo, Indiana |
500,000 |
|
| IN |
353 |
Indiana |
Cyntheanne
Rd. Interchange and Corridor Improvements, Town of Fishers, Indiana |
500,000 |
|
| IN |
661 |
Indiana |
Resuiface
and widen Shelby County Indiana 400 North Phases IVand V |
500,000 |
|
| IN |
1346 |
Indiana |
Reconstruct
Boston Street, from State Road 2 to Bach St., Larson- Whirlpool St. in
LaForte, Indiana |
500,000 |
|
| IN |
1381 |
Indiana |
45th Street
Improvements, Munster |
500,000 |
|
| IN |
1602 |
Indiana |
Construct
Shelby County Indiana Shelbyville Parkway |
500,000 |
|
| IN |
2793 |
Indiana |
Improve SR
9 Greenfield Corridor, Indiana |
500,000 |
|
| IN |
2936 |
Indiana |
Revelop
Hazeldell Road, Hamilton County, Indiana |
500,000 |
|
| IN |
3111 |
Indiana |
|
500,000 |
|
| IN |
2564 |
Indiana |
Complete
construction ofpaths at Hamilton County Riverwalk, Noblesville, Indiana |
375,000 |
|
| IN |
2023 |
Indiana |
Improve Bailie
Street, Kentland |
320,000 |
|
| IN |
1986 |
Indiana |
Conduct
study for US5O Corridor Improvements, Dearborn County Indiana |
300,000 |
|
| IN |
2896 |
Indiana |
improve
streetscape and signage, McMinn County, TN |
300,000 |
|
| IN |
1951 |
Indiana |
Construction
of multi-use paths, Town of Fishers, Indiana |
250,000 |
|
| IN |
1078 |
Indiana |
Upgrade
rail crossing at 93rd Avenue, St. John |
200,000 |
|
| IN |
2726 |
Indiana |
Study
alternatives along 2 miles of railroad to eliminae in- town highway-rail
crossings to improve safety and reduce congestion
in Delaware County |
150,000 |
|
| iN |
1083 |
Indiana |
Study Traffic on Muncie By-Pass from Centennial Avenue to |
120,000 |
|
| IA |
2574 |
Iowa |
US 20
Mississippi River Bridge and approaches, Dubuque Co, IA |
25,000,000 |
|
| IA |
1145 |
Iowa |
Construct
IA-32 Arterialfrom US 20 in Dubuque Co, IA to US 61 and US 151 |
19,000,000 |
|
| IA |
1313 |
Iowa |
Upgrade US
30 “Liberty Square” in City of Clinton, Iowa |
9,500,000 |
|
| IA |
1737 |
Iowa |
Construction of a Four Lane US. Highway 20 between |
9,000,000 |
|
| IA |
858 |
Iowa |
US 63
improvement near NewHampton, Iowa |
8,700,000 |
|
| IA |
1088 |
Iowa |
Construct
SE Connector/MLK Pkwy, Des Moines |
7,500,000 |
|
| IA |
705 |
Iowa |
Widening
and Reconstruction, 1235, Des Moines |
6,500,000 |
|
| IA |
848 |
Iowa |
NW 70th Ave
reconstruction, Johnston |
4,500,000 |
|
| IA |
2837 |
Iowa |
135 interchange
improvements, Ankeny |
4,500,000 |
|
| IA |
2249 |
Iowa |
US 30 reconstruction,
near Tama |
4,000,000 |
|
| IA |
3298 |
Iowa |
Construct
Principal Riverwalk, Des Moines |
4,000,000 |
|
| IA |
1757 |
Iowa |
US 20
relocated, Webster, Sac and Calhoun Counties, Iowa |
3,000,000 |
|
| IA |
435 |
Iowa |
US
34 Missouri River bridge relocation and replacement |
2,500,000 |
|
| IA |
830 |
Iowa |
Iowa
City, IA Construction of arterial extension project connecting Coralville to
west and south Iowa City |
2,500,000 |
|
| IA |
1621 |
Iowa |
Fort
Madison, IA Construction of US 61 bypass around Fort Madison to. create a
safer and faster route |
2,500,000 |
|
| IA |
3295 |
Iowa |
US
30 widening, reconstruction in Story and Marshall Counties, Iowa |
2,300,000 |
|
| IA |
2248 |
Iowa |
Construct SW
Connector, West Des Moines |
2,000,000 |
|
| IA |
2494 |
Iowa |
Construction
of approaches and viaduct on Edgewood Rd SW over the UP Railroad, Prairie
Creek, and the CRANDIC railroad |
1,600,000 |
|
| IA |
245 |
Iowa |
Construct 1-74
Bridge in Bettendorf IA |
1,500,000 |
|
| IA |
1581 |
Iowa |
Sioux
City, Iowa Hoeven Corridor - Outer Drive Project |
1,500,000 |
|
| IA |
42 |
Iowa |
Access
and enhancements to access Lake Belva Deer, Sigourney |
1,000,000 |
|
| IA |
86 |
Iowa |
Construction
of] 00th St interchange on 135-80, Urbandale |
1,000,000 |
|
| IA |
146 |
Iowa |
Central
IA Trail Loop, bicycle and pedestrian, Ankeny to Woodward section |
1,000,000 |
|
| IA |
275 |
Iowa |
Widening University
Blvd, aive |
1,000,000 |
|
| IA |
1284 |
Iowa |
IA Reconstruction of the Neal Smith Trail, bicycle and |
1,000,000 |
|
| IA |
1540 |
Iowa |
Reconstruction
of NE 56th St, eastern Polk Co |
1,000,000 |
|
| IA |
1631 |
Iowa |
City
of Council Bluffs and Pottawattamie county East Beltway Roadway and
Connectors Project |
1,000,000 |
|
| IA |
1791 |
Iowa |
|
1,000,000 |
|
| IA |
2182 |
Iowa |
Improvements
at the IA 146 and 180 interchange, Grinnell |
1,000,000 |
|
| IA |
3258 |
Iowa |
Construction
ofNW26th St interchange on 135, Polk Co |
1,000,000 |
|
| IA |
1098 |
Iowa |
Coralville,
IA Implementation offinal phase of Safety Improvements Project from 12th Ave
to 22nd Ave |
900,000 |
|
| IA |
54 |
Iowa |
Study of a
direct link to 180, Pella |
500,000 |
|
| IA |
209 |
Iowa |
Study for NE Beltway,
Polk Co |
500,000 |
|
| IA |
396 |
Iowa |
Reconstruction
ofNWMadrid Dr, Polk Co |
500,000 |
|
| IA |
834 |
Iowa |
Widening of Hwy 44, Grimes
|
500,000 |
|
| KS |
2884 |
Kansas |
Improvement
and expansion for 2.7 miles of K-i 8 in Geaiy County |
14,500,000 |
|
| KS |
1409 |
Kansas |
Construct
highway-rail grade separation from Douglas Avenue to 17th Street North in
Wichita, KS |
14,000,000 |
|
| KS |
2185 |
Kansas |
Construction
of a two-lane on afour-lane right of way bypass with controlled access on
US-400 at Dodge City |
12,800,000 |
|
| KS |
1077 |
Kansas |
Construction
of a four-lane access controlled improvement for 4 miles on US-54/400 in
Pratt County |
10,686,000 |
|
| KS |
2661 |
Kansas |
Replacement
of US-i 69 bridge in Kansas City |
8,500,000 |
|
| KS |
1626 |
Kansas |
Remove
and Replace Topeka Blvd. Bridge over the Kansas River |
6,000,000 |
|
| KS |
2076 |
Kansas |
Construct
1-35 and Lone Elm Road interchange and widen I- 35 from 51st St. to 59th St.,
Olathe |
5,000,000 |
|
| KS |
2161 |
Kansas |
Interchange
improvement at K-7 and 55th St. in Johnson Co |
5,000,000 |
|
| KS |
2407 |
Kansas |
Construct
K-JO and Lone Elm Road interchange, Lenexa |
5,000,000 |
|
| KS |
755 |
Kansas |
Construction
and reconstruction offour interchanges on I- 435, 1-35 and US-69 in Johnson
Co |
4,000,000 |
|
| KS |
2426 |
Kansas |
Route
designation, environmental clearance, final design and right-of-way
acquisition for Crawford County, KS corridor of
US. Highway 69 |
4,000,000 |
|
| KS |
330 |
Kansas |
Construction
of 4-lane improvement on K-18 in Riley County, Kansas |
2,000,000 |
|
| KS |
1255 |
Kansas |
Replacement
or rehabilitation of the Amelia Earhart US-59 Bridge in Atchison County,
Kansas |
2,000,000 |
|
| KS |
127 |
Kansas |
Resurfacing,
grading, replacing guardrails & adding shoulders to Highway 77 in Geary
Cty, to accommodate expected traffic increase |
784,000 |
|
| KS |
1905 |
Kansas |
Construction
of a 1.5 mile alternate truck route in Downs, Kansas |
500,000 |
|
| KS |
2353 |
Kansas |
Construct
bike and pedestrian path along K-b between Douglas and Johnson Counties |
500,000 |
|
| KY |
910 |
Kentucky |
Extension
of Newtown Pike from West Main Street to South Limestone Street, Lexington |
16,500,000 |
|
| KY |
3270 |
Kentucky |
Construct
two bridges across the Ohio River from Louisville to southern Indiana |
14,000,000 |
|
| KY |
2160 |
Kentucky |
Expansion
to four lanes of Hwy 55 and Hwy 555 Heartland Parkway in Taylor County |
10,000,000 |
|
| KY |
712 |
Kentucky |
Construct
North Somerset Bypass in Pulaski County from Nunn Parirway to KY8O |
7,000,000 |
|
| KY |
2795 |
Kentucky |
Construct
1-66 east of Somerset, Kentucky in Pulaski County to 1-75 at London, Kentucky
|
7,000,000 |
|
| KY |
3208 |
Kentucky |
|
5,000,000 |
|
| KY |
1946 |
Kentucky |
Construct
Pedestrian Mall and Streetscape Improvements, Wilmore |
3,905,000 |
|
| KY |
393 |
Kentucky |
Right
of way for and construction of Pennyrile Parkway Extension from 41A S. to
1-24 |
3,200,000 |