House TEA LU - FHWA High Priority Project Earmarks House TEA LU - FHWA High Priority Project Earmarks
Allocations for High Priority Projects Specified in TEA LU Bill as Passed by House T&I Committee on 3/24/04 - PRIOR TO FLOOR CONSIDERATION California Earmarks for High Priority Projects Specified in TEA LU Bill, H.R. 3550, Version as Passed by House T&I Committee on 3/24/04, but before Adoption of Manager's Amendment on House Floor on 4/1/2004
TEA LU High Priority Projects Popn. 2003  Per Capita Population 2003        33,461,000 Widen State Route 46 to four lanes between Airport Road and the Shandon Rest Stop in San Luis Obispo County.
Total Funds % of all $ % of States $ % of States  HPP Funds        18,500,000 Build interchange connecting State Route 99 to newly aligned State Hwy 132, Modesto.
U.S. Total    2,070,022,092            100.00        15,500,000 Alameda Corridor East Gateway to America Trade Corridor Project, Highway-railgrade separation along 35-mile corridor from Alameda Corridor to LA/S.Bern County Line
U.S. States Total    2,051,222,092                 100.0              100.00                 7.05       290,809,777        15,000,000 Upgrade Route 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County.
       15,000,000 Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego.
 Alabama         31,500,000                 1.52                    1.54                  1.55                 7.00 4,500,752        14,000,000 Widen State Route 99 to six lanes between Kingsburg and Selma, Fresno County.
 Alaska         30,500,000                 1.47                    1.49                  0.22              47.01 648,818        14,000,000 Construct nine rail-highway grade separations along Alameda Corridor East through cities of Fullerton, Placentia and Anaheim.
 Arizona            7,420,000                 0.36                    0.36                  1.92                 1.33 5,580,811        14,000,000 Development study of the Riverside-Orange corridor through
the Community Environmental Transportation Acceptibility
Process (CETAP).
 Arkansas         24,000,000                 1.16                    1.17                  0.94                 8.81 2,725,714        13,000,000 Widen the Marin-Sonoma Narrows section of Highway 101 to include a carpool HOV lane in each direction.
 California       207,060,000              10.00                 10.09                12.20                 5.84 35,484,453        13,000,000 Upgrade and reconstruct the I-80/I-680/SR 12 Interchange, Solano County.
 Colorado         14,940,000                 0.72                    0.73                  1.56                 3.28 4,550,688        12,900,000 Construct an auxiliary lane on Highway 17 between Camden and Hamilton Avenues, Campbell.
 Connecticut         22,980,000                 1.11                    1.12                  1.20                 6.60 3,483,372        12,600,000 Construct a diamond interchange on State Route 60 at Lemon Avenue in the city of Diamond Bar.
 Delaware                           -                       -                          -                    0.28                     -   817,491        12,000,000 Geary Boulevard Improvements, San Francisco.
 District of Columbia            2,000,000                 0.10                    0.10                  0.19                 3.55 563,384        10,000,000 Construct highway connecting State Route 78/86 and
State Route 111, Brawley.
 Florida       138,900,000                 6.71                    6.77                  5.85                 8.16 17,019,068        10,000,000 Reconstruct the interchange of I-5 and Richards Blvd and
other improvements.
 Georgia         35,650,000                 1.72                    1.74                  2.99                 4.10 8,684,715        10,000,000 The Foothill South Project will construct 16 miles of a six
lane limited access highway system.
 Hawaii            6,770,000                 0.33                    0.33                  0.43                 5.38 1,257,608        10,000,000 Replacement of exisitng 2 lane interchange to full 6 lane
interchange where Cajalco Road and I-15 meet in Corona,
CA.
 Idaho            4,500,000                 0.22                    0.22                  0.47                 3.29 1,366,332        10,000,000 Golden Gate Bridge Seismic Retrofit
 Illinois         97,884,572                 4.73                    4.77                  4.35                 7.74 12,653,544        10,000,000 San Jose, I880/Coleman Avenue Interchange
 Indiana         38,619,219                 1.87                    1.88                  2.13                 6.23 6,195,643          9,000,000 Widen highway 101 and reconstruct offramps between
Steel Lane & the town of Windsor
 Iowa         16,000,000                 0.77                    0.78                  1.01                 5.43 2,944,062          9,000,000 Folsom Blvd and Power Inn Rd widening and Improvements
 Kansas            6,784,000                 0.33                    0.33                  0.94                 2.49 2,723,507          8,500,000 Pine Avenue extension from route 71 from Pomona Rincon
Road in the City of Chino.
 Kentucky         17,200,000                 0.83                    0.84                  1.42                 4.18 4,117,827          8,000,000 Construct bypass along California Hwy 101 around the
town of Willits.
 Louisiana         16,450,000                 0.79                    0.80                  1.55                 3.66 4,496,334          8,000,000 Upgrade and reconstruct the I-80/I-680/SR 12 Interchange,
Solano County.
 Maine         13,200,000                 0.64                    0.64                  0.45              10.11 1,305,728          8,000,000 Realign California State Route 299 between the Trinity
County line and mile marker 7.4, Shasta County.
 Maryland         14,482,000                 0.70                    0.71                  1.89                 2.63 5,508,909          8,000,000 Improvements for Folsom Boulevard between Rod Beaudry
Drive and Sunrise Boulevard.
 Massachusetts         59,730,000                 2.89                    2.91                  2.21                 9.28 6,433,422          8,000,000 Widen State Route 112 to four lanes through Jamieson
Canyon (between Interstate 80 and SR 29).
 Michigan         66,765,400                 3.23                    3.25                  3.47                 6.62 10,079,985          7,500,000 Upgrade San Fernando Road corridor to include traffic
calming measures, Los Angeles.
 Minnesota         68,430,745                 3.31                    3.34                  1.74              13.53 5,059,375          7,500,000 State Route 44 Interchange construction
 Mississippi         17,500,000                 0.85                    0.85                  0.99                 6.07 2,881,281          7,300,000 Replace SR22 Interchanges and Bridges, Garden Grove.
 Missouri         25,000,000                 1.21                    1.22                  1.96                 4.38 5,704,484          7,036,110 Eucalyptus/Peyton Drive intersection improvements in the
City of Chino Hills.
 Montana                           -                       -                          -                    0.32                     -   917,621          7,000,000 Reconstruction of Sheldon Road and SR 99 Interchange,
Elk Grove, CA.
 Nebraska         34,300,000                 1.66                    1.67                  0.60              19.72 1,739,291          7,000,000 Reconstruct Intersections at Highways 152 & 156, Santa
Clara County.
 Nevada         20,000,000                 0.97                    0.98                  0.77                 8.92 2,241,154          6,700,000 405 Freeway Widening.
 New Hampshire            5,700,000                 0.28                    0.28                  0.44                 4.43 1,287,687          6,500,000 Improve access roads to Beale Air Force Base (Spenceville, Smartville, Hammanton-Smartville, and North Beale Roads).
 New Jersey         85,906,556                 4.15                    4.19                  2.97                 9.94 8,638,396          6,500,000 Widen roads, construct bicycle lane and parking facility to
enhance access to Hansen Dam Recreation Area, Los
Angeles.
 New Mexico         17,700,000                 0.86                    0.86                  0.64                 9.44 1,874,614          6,400,000 State Route 67 (Mapleview to Dye Rd) Project Studies/
Environmental Phase.
 New York       141,085,500                 6.82                    6.88                  6.60                 7.35 19,190,115          6,400,000 State Route 52 East upgrade (SR 125 to SR 67).
 North Carolina         56,000,000                 2.71                    2.73                  2.89                 6.66 8,407,248          6,000,000 Replace South Access to Golden Gate Bridge, San
Francisco.
 North Dakota         30,000,000                 1.45                    1.46                  0.22              47.33 633,837          6,000,000 Construct Silicon Valley Transportation Incident
Management Center, San Jose.
 Ohio         51,679,000                 2.50                    2.52                  3.93                 4.52 11,435,798          6,000,000 Improve farm to market roads in Tulare County.
 Oklahoma            5,750,000                 0.28                    0.28                  1.21                 1.64 3,511,532          6,000,000 Rosecrans Avenue/Aviation Boulevard/Douglas Street
improvements to reduce congestion and improve traffic
flow, El Segundo.
 Oregon         47,227,000                 2.28                    2.30                  1.22              13.27 3,559,596          6,000,000 Adds NB lane & auxiliary lanes on I-4 and widens I-8 west to I-5 north, San Diego
 Pennsylvania       121,462,300                 5.87                    5.92                  4.25                 9.82 12,365,455          5,650,000 I-5 CIP adds general purpose lanes, HOV lanes & corridor
arterial improvements from SR 91 to I-710
 Rhode Island         11,480,000                 0.55                    0.56                  0.37              10.67 1,076,164          5,630,000 Widen & realign Cherry Avenue from 19th Street to one
block south of Pacific Coast Highway, Signal Hill.
 South Carolina         72,700,000                 3.51                    3.54                  1.43              17.53 4,147,152          5,500,000 Construct Coyote Creek Trail from Kelly Park to Berryessa
station, San Jose.
 South Dakota            1,400,000                 0.07                    0.07                  0.26                 1.83 764,309          5,500,000 Construct Guadalupe River Trail project from highway 237 to I-880, San Jose.
 Tennessee         66,587,000                 3.22                    3.25                  2.01              11.40 5,841,748          5,000,000 8.5 miles of six and eight lane arterial roadways, building
an essential eastwest route across Santa Clarita Valley.
 Texas       154,247,000                 7.45                    7.52                  7.61                 6.97 22,118,509          5,000,000 Construct Daggett Road and Bridge Project, Port of
Stockton, CA.
 Utah         13,500,000                 0.65                    0.66                  0.81                 5.74 2,351,467          5,000,000 Widening of State Route 76 from Melrose Drive to I-5.
 Vermont                           -                       -                          -                    0.21                     -   619,107          5,000,000 Develop bicycle paths and public park space adjacent to
the New River, Calexico.
 Virginia         27,901,800                 1.35                    1.36                  2.54                 3.78 7,386,330          5,000,000 Widen and reconstruct Arch-Sperry Road to improve
connection between Interstate 5 and State Route 99, San
Joaquin County.
 Washington         32,860,000                 1.59                    1.60                  2.11                 5.36 6,131,445          5,000,000 Monterey Bay Sanctuary Scenic Tail - connect missing
segments of a bike and pedestrian trail around the
Monterey Bay National Marine Sanctuary.
 West Virginia         10,600,000                 0.51                    0.52                  0.62                 5.86 1,810,354          5,000,000 Widen State Route 98 from Route 111 to State Route 7,
Calexico.
 Wisconsin         56,870,000                 2.75                    2.77                  1.88              10.39 5,472,299          5,000,000 Design and Implement Trails and Bikeway Plans for the
Golden Gate National Recreation Area and Presidio.
 Wyoming            2,000,000                 0.10                    0.10                  0.17                 3.99 501,242          5,000,000 Construct Illinois Street Bridge/Amador Street Connection and Improvements, San Francisco.
 Puerto Rico            9,000,000                 0.43          5,000,000 Planning, engineering, and construction of a tunnel on SR
75/282 to Naval Air Station, San Diego.
 American Samoa            3,200,000                 0.15          5,000,000 Upgrade Kanan Road interchange at US 101 (Aguora Hills) to improve safety and accessibility.
 Guam            6,600,000                 0.32          5,000,000 For environmental review and preliminary engineering for a
freeway-to-freeway interchange connecting Interstate 5 to   
State Route 78.
 N. Mariana Islands                           -                       -            5,000,000 Preparation of environmental documents and design for conversion of the reliquished railroad bridge over the Feather River between Yuba City and Marysville
 Virgin Islands                           -                       -            5,000,000 Alameda Co. Construct I580 Corr. HOV Projects
         5,000,000 Rancho Cucamonga, I-15 Base Line Interchange Aux lanes and ramps
NOTE:  House TEA LU bill authorizes $11.1 billion for HPPs over 6 years.  The additional $2.5 billion above the amount spent (shown here) will be allocated at a later time.          5,000,000 Contra Costa County Brentwood Tracy Express way study and construct
         4,856,000 Improvements to interchange between SR 23 and SR 101.
Could include wideing of SR 23 from 2 lanes to 3.
         4,700,000 Port of Hueneme Intermodal Access Improvement Project
including grade separaiton at Rice Avenue/State Route 34;
road widening at Hueneme Road.
Source:  Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org          4,644,000 Utilize funds  over a four-year period to reconstruct and
deep-lift asphalt on various roads thorughout the district in
Santa Barbara County.
         4,500,000 Construciton of interchange at State Hwy 86 at Ave 66 in
Coachella, CA.
         4,400,000 4-lane overpass for Mission Blvd grade separation project,
City of Pomona.
         4,240,000 Realignment of La Brea Avenue to reduce congestion,
Inglewood.
         4,200,000 Construct Route 101 Auxiliary Lanes 3rd Avenue in the city
of San Mateo to Millbrae Ave in Millbrae.
         4,000,000 Reconstruct and widen Garfield Ave bridge over Rio Hondo
River Channel and apply seismic improvements, South
Gate.
         4,000,000 Reconstruct overcrossing and interchange at Interstate 10
& Tippacanoe Ave in Loma Linda.
         4,000,000 Construct truck lane from Britannia Blvd to the Otay Mesa
Port Entry, San Diego County.
         4,000,000 Construction of new freeway lanes, including HOV lanes at
US HWY 50 and Empire Ranch Road, Folsom,CA.
         4,000,000 Widen South Main Street/Soda Bay Road between
CR 400A/miler marker 0.0-mile marker 0.7 and CR502/mile marker 0.0 and mile marker 0.9.
         4,000,000 Widen Avenue P to six lanes to alleviate trafic congestion in Palm Dale, CA.
         4,000,000 Bay Road improvements between Clarke Avenue and
Cooley Landing. Northern access improvements between
University and Illinois Avenue, East Palo Alto.
         4,000,000 Conduct Study and Construct McKinley Intechange at SR
120 Project, Manteca, CA.
         4,000,000 SF, Implement ITS on Muni Transit
         4,000,000 I-5/SR-56 Connector
         3,800,000 Widen State Route 99 between Tulare and Kingsburg, CA.
         3,750,000 Improvements (including arterial streets rehabilitation) to
enhance traffic and pedestrian safety in Northridge, Granada Hills, and Porter Ranch, Los Angeles.
         3,670,000 Salinas Airport Boulevard/Hwy 101 interchange -- new 4 lane overpass with 2 lanes each direction, new approaches, new southbound on/off ramps, bicycle lanes.
         3,670,000 Santa Cruz Highway 1 widening and HOV Lanes
         3,660,000 Holllister SR25 widening --4 lane freeway between San
Felipe Road to the US 101 separation, Gilroy.
         3,520,000 Multi Year Riverside and Orange County Major investment Study and Phase work
         3,500,000 Construct Cypress Avenue over-pass to separate
Interstate 10 and Union Pacific Railroad tracks, Fontana.
         3,500,000 Implement streetscape project on Central Avenue from
103rd Street to Watts/103rd Street Station , Watts.
         3,500,000 Santa Clara County, aux., bike and ped. Improvements-Almaden Expressway
         3,400,000 Widen Santa Maria River Bridge on U.S. Highway 101
between Santa Barbara County and San Luis Obispo Co.
         3,250,000 Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in Reseda, Canoga Park, and Winnetka, Los Angeles.
         3,250,000 Diesel Emissions Reduction Program for Gateway Cities
Council of Governments.
         3,000,000 Improvements for the Watt Avenue corridor between
Antelope Road and the Capital City Freeway.
         3,000,000 Resurface and construct truck lane at CA Hwy. 94 and Interstate 8 interchange, Boulevard.
         3,000,000 Construction of the improvements to the Western Placerville Interchanges on SR50 between the Missouri Flat Road Over-crossing and the Placerville Drive under-crossing in and near the City of Placerville in El Dorado County.
         3,000,000 Construct off ramp at Interstate 8/Imperial Avenue
Interchange, El Centro.
         3,000,000 Coastal Corridor Investments Phase II -A - multi-modal
improvements on Rosecrans Avenue between  Sepulveda
Blvd and I-405, El Segundo.
         3,000,000 Reconstruct and widen Del Mao Blvd to four lanes between
Normadie Ave andNew Hampshire Ave, Los Angeles County
         3,000,000 Gateway Cities intelligent management and logistics freight
movement measures
         3,000,000 Mitigate congestion & operation problems along Harbor Blvd. Between I-405 southbound offramp & Sunflower Ave.
         3,000,000 Intelligent Transportation Systems on Long Beach Boulevard, Compton Boulevard, Wilmington Avenue, Walnut Avenue incl. interface with the L.A. County ITS system.
         3,000,000 Widen State Route 98, including storm drain improvements, from Kloke Road to State Route 111, Calexico.
         3,000,000 Constructs a Highway and Railroad grade separation at
North Milliken Avenue, Ontario.
         3,000,000 Repair and replace tunnel lining on Kanan, Kanan Dume,
and Malibu Canyon Roads, Los Angeles County.
         3,000,000 Widen Washington Boulevard, Commerce.
         3,000,000 Reconstruct interchange with partial-cloverleaf on-rmap for south-bound traffic entering I-80 from Central Avenue, City of Richmond.
         3,000,000 Technical Feasibility Study for the 710 Tunnel to connect
the 710 to the 210.
         3,000,000 Provide widening of the exisitng two-lane railroad underpass on SR89 in Nevada County.
         3,000,000 Construct new ramps to Route 262, widen 262, reconstruct
railroad bridges, Fremont.
         3,000,000 Interchange improvements at Rice Avenue and US Highway
101, City of Oxnard.
         3,000,000 Arcadia, Santa Anita  Ave. Corridor Improvement project
         3,000,000 Placer County Ferrari Interchange Project
         2,800,000 Reconstruct interchange at I-10 and Riverside Avenue to
improve traffic, Rialto.
         2,500,000 Traffic signal upgrade, road configuration, and median strip
improvements to Lakewood Blvd between Telegraph Rd
and Gardendale St, Downey.
         2,500,000 Mid Valley Station Road and Inter-Modal Improvement
Project.
         2,500,000 Will add landscaping enhancements along the freeway for
aesthetic purposes in Ventura County.
         2,500,000 Pasadena Multi-modal intelligent transportation system:
traffic management center upgrade, transit management
system , parking guidance system, the City of Pasadena.
         2,500,000 Improve Glendale Freeway Terminus to provide pedestrian
access, construct sound barriers, and implement
landscaping, Los Angeles.
         2,500,000 Reconstruct segments of Hollister Avenue between San
Antonio Road and State Route 154, Santa Barbara County.
         2,500,000 Transportation enhancements on Slauson Ave and Atlantic
Blvd, Maywood.
         2,500,000 Construct a 2.8 mile bikeway, working in conjuction with the City of La Habra, along Lambert Road from Mills Ave to
Valley Home Ave.
         2,500,000 Construct truck lane on Keystone Road from State Route 111 to Austin Road, Imperial County.
         2,500,000 I-880 Federal highway safety improvements, High Street to
I-980, Oakland.
         2,500,000 Imperial Co. I8 Widening overpass at Dogwood Rd.
         2,500,000 Downey, Fiestone Blvd. Widen and add turn lane
         2,500,000 City of Livermore, Upgrad and Reconstruct 1580/Vasco Rd. Interchange
         2,400,000 Construct right turn lanes, bus turn out lanes, right of way,
traffic signals.
         2,300,000 Improvement of Culver Boulevard between Elenda and
Sepulveda; Sepulveda Blvd between Green Valley Circle
and Jefferson Boulevard, Culver City.
         2,200,000 Reconstruct 1.1 miles of Long Beach Blvd from Imperial
Hwy to Tweedy Blvd., Lynwood.
         2,150,000 Construction of 7 grade separations in cities of Sante Fe
Springs, Pico Rivera, and La Mirada along BNSF Railway.
         2,000,000 Improvement of intersection at Aviation Blvd. And
Rosecrans Ave. to reduce congestion, Hawthorne.
         2,000,000 Construction of interchange on Interstate 10 at Palm Drive
         2,000,000 Expand carsharing pilot program to serve low- and
moderate-income neighborhoods in the City and County of
San Francisco.
         2,000,000 Reconstruct I-880/Route 92 Interchange, Hayward.
         2,000,000 Widening on Bear Valley Pkwy, City of Escondido, Citrus
Avenue to Valley Pkwy and to northern city limit, local arterial.
         2,000,000 Improvements to increase beach access, prevent storm
drain failure and accommodate increasing pedestrian
traffic on The Stand, Manhattan Beach.
         2,000,000 Upgrade Jepson Parkway at the North and South Access
Gates of Travis Air Force Base and widen Vanden Road
segment , Solano County.
         2,000,000 Construciton of a .2 miles section of Pointsettia Lane in the
City of Carlsbad, local arterial.
         2,000,000 Realign State Route 79 from Gilman Springs Road to
Domenigoni Parkway in San Jacinto.
         2,000,000 Construct grade separation at State College Blvd., Fullerton
/Anaheim.
         2,000,000 Improve 16 roads, bridge and one bike path in Mariposa
County.
         2,000,000 Widen Wilmington Ave from 223rd street including ramp
modifications, Carson.
         2,000,000 Improvements at First Street and Erringer Road. The project will widen off ramps and surface streets.
         2,000,000 Construct new interchange at I-15 and State Route 18
(Falchion Road) and provide new highway access to U.S.
395.
         2,000,000 Widening of two lanes SR79 highway to four lanes.
         2,000,000 Auburn Boulevard Reliever Route Under-grounding construction along I-80, Sacramento, CA.
         2,000,000 Realign Route 4 in City of Oakley bypass NW of Vintage Parkway to Main St at Second St.
         2,000,000 Alhambra Valley Blvd Enhancement Project
         2,000,000 Montclair Ramona Avenue grade separation along Alameda
Corridor East.
         2,000,000 Improve Ben Maddox Bridge crossing State Route 198, Visalia.
         2,000,000 Upgrade Olympic Boulevard between Vermont Ave and
Western Ave to improve pedestrian safety and improve
congestion, Los Angeles.
         2,000,000 Construction of HOV and BRT lanes on I-15 from SR-78 to
SR-163.
         2,000,000 Upgrade existing county highway J59 in Toulumne,
Stanislaus and Merced Counties.
         2,000,000 Replace Winters Bridge, Yolo County.
         2,000,000 I-80 to Eureka Road Interchange - Improve access to I-80
by reducing traffic congestion at two heavily traveled on-
ramps at Eureka Road and Riverside Avenue in Placer Co.
         2,000,000 Provides funding for the construction of auxiliary lanes in
each direction of US 101 fom Marsh Road to the Santa
Clara County line.
         2,000,000 Oregon-Page Mill expressway improvements between US
101 and SR 82, Palo Alto. 
         2,000,000 Improving the interchanges on I-5 at Genesee Ave and 
Sorrento Valley Blvd.
         2,000,000 This project will widen the northbound ramps and widen the
southbound ramps at the I-15 and SR-79 south interchange
         2,000,000 Widen the Mountain View Avenue Bridge in Loma Linda.
         2,000,000 Builds a pedestrian bridge form Hiller Street to the Bay
Trail, Belmont.
         2,000,000 Construct a soundwall along Esperanza Road in the City of
Yorba Linda.
         2,000,000 Montclair Monte Vista Avenue grade separation along
Alameda Corridor East.
         2,000,000 Improve SR219 to 4-lanes in the cities of Riverside, Oakdale and Modesto.
         2,000,000 Temecula Winchester Project- This project will require a
partial cloverleaf interchange on I-15 at exit/entrance ramps
at Winchester Road.
         2,000,000 Conduct Study of State Route 130 Realignment Project,
San Joaquin County and Santa Clara County.
         2,000,000 Murrieta, Los Alamos Rd. I15 Interchange Improvements
         2,000,000 Placer County, Sierra College I-80 Interchange Project. Design Deficiencies
         2,000,000 Solano County Cordellia Hill/ Sky Valley, transportation enhancement project
         2,000,000 Hesperia, Install new crossing at Ranchero Road
         1,900,000 Widening the Fairview Road bridge over I, widening the
onramp to accommodate three lanes, and provide one
right-turn lane, one optional through or right lane and three
through lanes.
         1,900,000 I-238 Widening between I-580 and I-880, Ashland,
Cherryland/San Leandro/San Lorenzo.
         1,750,000 Upgrade and extend Commerce Avenue, City of Concord.
         1,600,000 I605 Interchange Construction Arrow Highway and Live Oak Ave., Irwindale
         1,500,000 Rehabilitate arterials, Compton…
         1,500,000 Construct pedestrian streetscape improvements on Ocean
Blvd and Anaheim Street in Long Beach, including lighting
landscaping and irrigation, and seating, drinking fountains,
bicycle racks and trash receptacles.
         1,500,000 Improve Ave 12-Fwy 99 interchange; create five lanes and
install traffic signals. Construct Road 29 entrance east of
the interchange.
         1,500,000 I-80 Gilman Street interchange improvements, Berkeley.
         1,500,000 Upgrade roads, traffic signals and turn lanes in order to
ease traffic congestion for the Willow/Ashlan & Shaw
intersections.
         1,500,000 Add carpool lane and truck lane on Interstate 5 in Santa
Clarita Valley, CA.
         1,500,000 Grade separation of Lenwood Road in Barstow, CA.
         1,500,000 Construct truck ramp linking Interstate 5 to National City
Marine Cargo Terminal, Naitonal City.
         1,500,000 Construct Inland Empire transportaiton Management Center
to better regulate traffic and dispatch personnel to incidents, Fontana.
         1,500,000 Replace Route 1 San Pedro Creek bridge, Pacifica.
         1,500,000 Fresno, Upgrade Save Mart Center intersection
         1,500,000 Victorville, I15 Interchange
         1,300,000 Campbell, Add Turn Lane and Technology to San Thomas Expressway and Hamilton Ave intersection
         1,250,000 Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in Sylmar, Lake View
Terrace, and Mission, Los Angeles.
         1,250,000 First Street Bridge realignment, Los Angeles.
         1,250,000 Widening Mt Vernon Ave bridge to four lanes, Colton.
         1,250,000 Reconstruct 1.5 miles of Paramount Blvd from Carson Street to Candlewood St., Lakewood.
         1,250,000 FHWA Diesel Emissions Reduction Program for the
Gateway Cities. Los Angeles County.
         1,250,000 Construct left turn lane to ease congestion at Interstate-10
into Rosemead Boulevard and Telstar Avenue, El Monte.
         1,250,000 Streetscape Improvements at E. 14th/Mission Blvd.,
Alameda County.
         1,250,000 San Bernardino, Grad Separation between State Street and BNSF Tracks
         1,200,000 Implement streetscape improvements on segments
of Laurel Canyon Blvd. And Victory Blvd., North Hollywood.
         1,200,000 I-580 Castro Valley Interchange Improvements.
         1,200,000 Harbor Blvd Intelligent Transportation System (ITS). Widen
intersections and add lanes, Garden Grove/Anaheim
         1,100,000 Construct multi-use trails at Galster Park that link to other
local Los Angeles County trails, West Covina.
         1,100,000 Reconstruct 7 miles of Whittier Blvd, from Valley Home
(SR 72) to Riviera Rd, Whittier.
         1,050,000 Construct 213th Street pedestrian bridge to provide safe
passage for pedestrians and wheelchairs, Carson.
         1,000,000 Construct parking lot and improved museum pedestrian
access from the trolley station, San Diego.
         1,000,000 Study feasibility of Maglev link between San Diego and
proposed San Diego Regional International Airport,
Imperial County.
         1,000,000 Provide grade separation at the Firestone/Old River School
Road intersection, Downey.
         1,000,000 Improve I-8 offramp to the Desert Farming Institute, Imperial
County.
         1,000,000 Conduct Study and Construct I 205/Chrisman Road
Interchange Project, Tracey, CA.
         1,000,000 Widen Boulder Avenue Bridge in Highland.
         1,000,000 Elk Horn Boulevard Widening to SR 99, Sacramento, CA.
         1,000,000 Reconstruct 152/156 Interception Project, Santa Clara
County, CA.
         1,000,000 Replace Davis Street Highway I-880 overpass, San Leandro
         1,000,000 Realign and make improvements to California Hwy 199
between mile marker 22.16 and mile marker 23.65.
         1,000,000 Develop and implement traffic calming measures for traffic
exiting the I-710 into Long Beach.
         1,000,000 Widen Harbor Blvd to 8 lanes in Anaheim Resort Area.
         1,000,000 Improve I-8 offramp at Octotillo to the Imperial Valley
College Desert Museum /Regional Traveler Visitor Center,
Imperial County.
         1,000,000 Atlantic Boulevard Bridge widening, Vernon
         1,000,000 Conduct Study and Construct Vasco Road Safety
Improvements Project, Contra Costa County, CA.
         1,000,000 Interchange expansion at Interstate 10 and Indian Canyon
Drive, City of Palm Springs.
         1,000,000 Construct 4-lane connector between I-40 and Arizona Route 95 in Needles.
         1,000,000 Construction of HOV lanes on I-5 from Vandegrift Blvd to
La Jolla Village Drive.
         1,000,000 San Gabriel Boulevard Highway widening and intersection
improvement project, the City of San Gabriel.
         1,000,000 Design and environmental analysis for State Route 11
connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego.
         1,000,000 Colima Road/Fullerton Road intersection improvements in
the city of Rowland Heights.
         1,000,000 Reconstruct I-710 southern terminus off ramps, Long Beach
         1,000,000 Improve Central Avenue Historic Corridor Streetscape, Los
Angeles.
         1,000,000 Improve access from I-8 and construct parking lot for the
Imperial Sand Dunes Recreation Area Visitors Center,
Imperial Valley.
         1,000,000 Land acquisition to mitigate impacts to natural habitats
and wetlands caused by highway projects on US 1 and US
101 in areas around Solstice Canyon in the Santa Monica
National Mountains Recreation Area.
         1,000,000 Construct overpass at Central Avenue Overpass in the Union Pacific Railroad Crossing, Newark.
         1,000,000 Land acquisition in Sargent Hills to mitigate for road runoff
into water sources and to protect a wildlife corridor
connecting Santa Cruz Mountains to Mt. Hamilton Range,
Santa Clara County.
         1,000,000 Construct fourth bore of Caldecott Tunnel on Route 24.
         1,000,000 Construct road from Mace Blvd in Yolo County to federally
supported Pacific Flyway wildlife area.
         1,000,000 Conduct study and Construct Lammers Rd/ I-205 Widening and Interchange Project, Tracy, CA.
         1,000,000 Construction of interchange at State Hwy 86 and Ave 50 in
Coachella, CA.
         1,000,000 Quincy-Oroville Highway Rehabilitation - Provides for 9.5
miles of pavement rehabilitaiton, culvert replacements,
guardrail installation, signing and stripping in Plumas Co.
         1,000,000 The Esplanade improvements to reduce pedestrian/bicycle/
automobile traffic congestion and improve oceanfront
access Redondo Beach.
         1,000,000 Feasibility study, design, engineering, grade separation,
pedestrian improvements, and traffic calming project, the
City of South Pasadena.
         1,000,000 Acquire approximately 4,000 acres of land at the Desert
Cahullia Prehistoric Site, Imperial County.
         1,000,000 Implement Congestion Mitigation and Air Quality Improve-
ment Project, Orange County.
         1,000,000 Danville, Camino Tassajara-Crown Canyon to East Town Project.
         1,000,000 Contra Costa County, Fernandez Ranch Trans Enhancements
         1,000,000 Millbrae, SF Bay Trail 101 bike/ped overpass
         1,000,000 Contra Costa Co. Improve ped and bike trails in East Bay Reg. Park District
            838,690 Cabot-Camino Capistrano Bridge. Construction of a bridge
that will connect highways Camino Capistrano and Cabot
Road.
            800,000 Implement Manor Drive overpass improvement, Pacifica.
            800,000 Roadway surface improvments, street lighting, and storm
drain improvments to South Center Street from Baughman
Road to State Route 78/86, Westmoreland.
            800,000 Construct Alviso Bay Trail Project, a 1.3 mile trail from
from Gold Street to San Tomas Aquino Creek, Santa Clara
County.
            784,000 Reconstruction and repair of pedestrian walkways in and
around the campus of California State University Northridge
to improve traffic and safety.
            750,000 Construct San Leandro-Oakland biking and hiking path.
            750,000 Improvements (inclusing arterial street rehabilitation) to
enhance traffic and pedestrian safety in the Van Nuys
community, Los Angeles.
            700,000 Construct 4,700 ft. of medians to improve safety/congestion
on Imperial Highway from Valley View to Telegraph Road,
La Mirada.
            700,000 Construct Dry Creek and Enterprise canal trails in Clovis.
            600,000 Provide landscape enhancement of an existing open culvert on Atherton Street, Long Beach.
            600,000 Repair and realignment of Brahma Drive and Winettka
Avenue, which serves the students of Los Angeles Pierce
College.
            600,000 San Gabriel City, Ped Calming Measures on Las Tunas Blvd.
            575,000 LA River bikeway, Sherman Oaks
            550,000 Construct truck lane on Baughman Road from State Route
78/86 to Forrester Road, Westmoreland.
            510,000 Pedestrian Bridge Over Atlantic Boulevard, the City of
Monterey Park.
            500,000 Implement and maintain an incident management system
for I-880 and I-80, Alameda and Contra Costa Counties.
            500,000 Project design, environmental assessment, and roadway
construction of Lonestar Road from Alta Road to Enrico
Fermi Drive, San Diego County.
            500,000 Construct exit from SR 78 to SDSU Brawley Campus
            500,000 Citywide traffic signal upgrades requiring the installation of
hardware and software at 9 major intersections, Palo Alto.
            500,000 Construct Marin-Sonoma Narrows bicycle and pedestrian
walkway.
            500,000 Conduct a project study to examine an interchange at State Route 165 and Bradbury Road, Merced County.
            500,000 Study to evaluate traffic implications resulting from the
proposed re-alignment of Nutwood Avenue, Fullerton.
            500,000 Construct safe access to streets for bicyclists and
pedestrians including crosswalks, sidewaks, and traffic
calming measures, Covina.
            500,000 Long Beach, Paramount Blvd. Reconstruction
            480,000 ATIS added to the Magnolia corridor connecting Riverside,
Corona, Moreno Valley, and portions of Riverside County.
            450,000 Rehabilitate the pavement of Vinvcent Avenue between
Interstate I-10 and the north city limit, West Covina.
            400,000 Costruct A 2.8 mile bikeway, working in conjuction with the
city of Whittier, that will connect four other regional trails
and bikeways.
            400,000 Reconstruct Carson  w/ on/off ramp I 605 Hawaiian Gardens
            350,000 Traffic signal upgrades on Bellflower Blvd at Alondra Blvd and Rosecrans Ave, Bellflower.
            300,000 Construct pedestrian bicycle and ADA accessible
boardwalks at the Pismo Beach Promenade, San Luis
Obispo County.
            300,000 Modifies 9 traffic signals between Willow Road and
Middlefield Road and Hamilton Avenue, Menlo Park.
            300,000 Preliminary engineering and EIS/EIR process for 33-mile
long Orange Line mag-lev connecting Los Angeles with
Orange County.
            300,000 Phase II of the Alameda Corridor East Project, constructing
grade separation projects from E. Los Angeles to Pomona.
            300,000 Develop bicycle paths and pedestrian access to Third
Avenue, Chula Vista.
            215,000 Develop conceptual master plan including economic
analysis and environmental study to improve the efficiency
of transportation facilities, Covina.
            214,000 Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in the Sherman Oaks
community, Los Angeles.
            150,000 Construct sound barriers at the I-5/S.R. 54 Interchange,
National City.
            125,200 Antonio Parkway Improve Signal System
            108,000 Install signal pre-emption hardware at 53 traffic signals
throughout Culver City to improve bus and first responder
travel times.
            100,000 Renovation and repair of Rosemead Blvd-Hwy 19 such as
new sidewalks, traffic loops, pavement, street lights.
            100,000 Study economic, environmental and congestion mitigation
benefits of a Hybrid Utility Vehicle, Santa Barbara County.
               85,000 Install traffic signal and ramps at Interstate-10 and Walnut
Grove Avenue to reduce congestion, Rosemead.
               75,000 Transportation enhancements, Bellflower.
               50,000 Repair Rosecrans Ave and Alondra Blvd bridges, Bellflower.
    938,897,000 Total California High Projects
Source:  Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org