| House TEA LU - FHWA High Priority Project Earmarks | House TEA LU - FHWA High Priority Project Earmarks | |||||||||||||
| Allocations for High Priority Projects Specified in TEA LU Bill as Passed by House T&I Committee on 3/24/04 - PRIOR TO FLOOR CONSIDERATION | California Earmarks for High Priority Projects Specified in TEA LU Bill, H.R. 3550, Version as Passed by House T&I Committee on 3/24/04, but before Adoption of Manager's Amendment on House Floor on 4/1/2004 | |||||||||||||
| TEA LU High Priority Projects | Popn. 2003 | Per Capita | Population 2003 | 33,461,000 | Widen State Route 46 to four lanes between Airport Road and the Shandon Rest Stop in San Luis Obispo County. | |||||||||
| Total Funds | % of all $ | % of States $ | % of States | HPP Funds | 18,500,000 | Build interchange connecting State Route 99 to newly aligned State Hwy 132, Modesto. | ||||||||
| U.S. Total | 2,070,022,092 | 100.00 | 15,500,000 | Alameda Corridor East Gateway to America Trade Corridor Project, Highway-railgrade separation along 35-mile corridor from Alameda Corridor to LA/S.Bern County Line | ||||||||||
| U.S. States Total | 2,051,222,092 | 100.0 | 100.00 | 7.05 | 290,809,777 | 15,000,000 | Upgrade Route 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County. | |||||||
| 15,000,000 | Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego. | |||||||||||||
| Alabama | 31,500,000 | 1.52 | 1.54 | 1.55 | 7.00 | 4,500,752 | 14,000,000 | Widen State Route 99 to six lanes between Kingsburg and Selma, Fresno County. | ||||||
| Alaska | 30,500,000 | 1.47 | 1.49 | 0.22 | 47.01 | 648,818 | 14,000,000 | Construct nine rail-highway grade separations along Alameda Corridor East through cities of Fullerton, Placentia and Anaheim. | ||||||
| Arizona | 7,420,000 | 0.36 | 0.36 | 1.92 | 1.33 | 5,580,811 | 14,000,000 | Development study of the Riverside-Orange corridor
through the Community Environmental Transportation Acceptibility Process (CETAP). |
||||||
| Arkansas | 24,000,000 | 1.16 | 1.17 | 0.94 | 8.81 | 2,725,714 | 13,000,000 | Widen the Marin-Sonoma Narrows section of Highway 101 to include a carpool HOV lane in each direction. | ||||||
| California | 207,060,000 | 10.00 | 10.09 | 12.20 | 5.84 | 35,484,453 | 13,000,000 | Upgrade and reconstruct the I-80/I-680/SR 12 Interchange, Solano County. | ||||||
| Colorado | 14,940,000 | 0.72 | 0.73 | 1.56 | 3.28 | 4,550,688 | 12,900,000 | Construct an auxiliary lane on Highway 17 between Camden and Hamilton Avenues, Campbell. | ||||||
| Connecticut | 22,980,000 | 1.11 | 1.12 | 1.20 | 6.60 | 3,483,372 | 12,600,000 | Construct a diamond interchange on State Route 60 at Lemon Avenue in the city of Diamond Bar. | ||||||
| Delaware | - | - | - | 0.28 | - | 817,491 | 12,000,000 | Geary Boulevard Improvements, San Francisco. | ||||||
| District of Columbia | 2,000,000 | 0.10 | 0.10 | 0.19 | 3.55 | 563,384 | 10,000,000 | Construct highway connecting State Route 78/86 and State Route 111, Brawley. |
||||||
| Florida | 138,900,000 | 6.71 | 6.77 | 5.85 | 8.16 | 17,019,068 | 10,000,000 | Reconstruct the interchange of I-5 and Richards Blvd and
other improvements. |
||||||
| Georgia | 35,650,000 | 1.72 | 1.74 | 2.99 | 4.10 | 8,684,715 | 10,000,000 | The Foothill South Project will construct 16 miles of a six
lane limited access highway system. |
||||||
| Hawaii | 6,770,000 | 0.33 | 0.33 | 0.43 | 5.38 | 1,257,608 | 10,000,000 | Replacement of exisitng 2 lane interchange to full 6 lane
interchange where Cajalco Road and I-15 meet in Corona, CA. |
||||||
| Idaho | 4,500,000 | 0.22 | 0.22 | 0.47 | 3.29 | 1,366,332 | 10,000,000 | Golden Gate Bridge Seismic Retrofit | ||||||
| Illinois | 97,884,572 | 4.73 | 4.77 | 4.35 | 7.74 | 12,653,544 | 10,000,000 | San Jose, I880/Coleman Avenue Interchange | ||||||
| Indiana | 38,619,219 | 1.87 | 1.88 | 2.13 | 6.23 | 6,195,643 | 9,000,000 | Widen highway 101 and reconstruct offramps between Steel Lane & the town of Windsor |
||||||
| Iowa | 16,000,000 | 0.77 | 0.78 | 1.01 | 5.43 | 2,944,062 | 9,000,000 | Folsom Blvd and Power Inn Rd widening and Improvements | ||||||
| Kansas | 6,784,000 | 0.33 | 0.33 | 0.94 | 2.49 | 2,723,507 | 8,500,000 | Pine Avenue extension from route 71 from Pomona Rincon Road in the City of Chino. |
||||||
| Kentucky | 17,200,000 | 0.83 | 0.84 | 1.42 | 4.18 | 4,117,827 | 8,000,000 | Construct
bypass along California Hwy 101 around the town of Willits. |
||||||
| Louisiana | 16,450,000 | 0.79 | 0.80 | 1.55 | 3.66 | 4,496,334 | 8,000,000 | Upgrade and reconstruct the I-80/I-680/SR 12
Interchange, Solano County. |
||||||
| Maine | 13,200,000 | 0.64 | 0.64 | 0.45 | 10.11 | 1,305,728 | 8,000,000 | Realign California State Route 299 between the Trinity County line and mile marker 7.4, Shasta County. |
||||||
| Maryland | 14,482,000 | 0.70 | 0.71 | 1.89 | 2.63 | 5,508,909 | 8,000,000 | Improvements for Folsom Boulevard between Rod Beaudry Drive and Sunrise Boulevard. |
||||||
| Massachusetts | 59,730,000 | 2.89 | 2.91 | 2.21 | 9.28 | 6,433,422 | 8,000,000 | Widen State Route 112 to four lanes through Jamieson Canyon (between Interstate 80 and SR 29). |
||||||
| Michigan | 66,765,400 | 3.23 | 3.25 | 3.47 | 6.62 | 10,079,985 | 7,500,000 | Upgrade San Fernando Road corridor to include traffic calming measures, Los Angeles. |
||||||
| Minnesota | 68,430,745 | 3.31 | 3.34 | 1.74 | 13.53 | 5,059,375 | 7,500,000 | State Route 44 Interchange construction | ||||||
| Mississippi | 17,500,000 | 0.85 | 0.85 | 0.99 | 6.07 | 2,881,281 | 7,300,000 | Replace SR22 Interchanges and Bridges, Garden Grove. | ||||||
| Missouri | 25,000,000 | 1.21 | 1.22 | 1.96 | 4.38 | 5,704,484 | 7,036,110 | Eucalyptus/Peyton Drive intersection improvements in the
City of Chino Hills. |
||||||
| Montana | - | - | - | 0.32 | - | 917,621 | 7,000,000 | Reconstruction of Sheldon Road and SR 99 Interchange, Elk Grove, CA. |
||||||
| Nebraska | 34,300,000 | 1.66 | 1.67 | 0.60 | 19.72 | 1,739,291 | 7,000,000 | Reconstruct Intersections at Highways 152 & 156,
Santa Clara County. |
||||||
| Nevada | 20,000,000 | 0.97 | 0.98 | 0.77 | 8.92 | 2,241,154 | 6,700,000 | 405 Freeway Widening. | ||||||
| New Hampshire | 5,700,000 | 0.28 | 0.28 | 0.44 | 4.43 | 1,287,687 | 6,500,000 | Improve access roads to Beale Air Force Base (Spenceville, Smartville, Hammanton-Smartville, and North Beale Roads). | ||||||
| New Jersey | 85,906,556 | 4.15 | 4.19 | 2.97 | 9.94 | 8,638,396 | 6,500,000 | Widen roads, construct bicycle lane and parking facility
to enhance access to Hansen Dam Recreation Area, Los Angeles. |
||||||
| New Mexico | 17,700,000 | 0.86 | 0.86 | 0.64 | 9.44 | 1,874,614 | 6,400,000 | State Route 67 (Mapleview to Dye Rd) Project Studies/ Environmental Phase. |
||||||
| New York | 141,085,500 | 6.82 | 6.88 | 6.60 | 7.35 | 19,190,115 | 6,400,000 | State Route 52 East upgrade (SR 125 to SR 67). | ||||||
| North Carolina | 56,000,000 | 2.71 | 2.73 | 2.89 | 6.66 | 8,407,248 | 6,000,000 | Replace South Access to Golden Gate Bridge, San Francisco. |
||||||
| North Dakota | 30,000,000 | 1.45 | 1.46 | 0.22 | 47.33 | 633,837 | 6,000,000 | Construct Silicon Valley Transportation Incident Management Center, San Jose. |
||||||
| Ohio | 51,679,000 | 2.50 | 2.52 | 3.93 | 4.52 | 11,435,798 | 6,000,000 | Improve farm to market roads in Tulare County. | ||||||
| Oklahoma | 5,750,000 | 0.28 | 0.28 | 1.21 | 1.64 | 3,511,532 | 6,000,000 | Rosecrans Avenue/Aviation Boulevard/Douglas Street improvements to reduce congestion and improve traffic flow, El Segundo. |
||||||
| Oregon | 47,227,000 | 2.28 | 2.30 | 1.22 | 13.27 | 3,559,596 | 6,000,000 | Adds NB lane & auxiliary lanes on I-4 and widens I-8 west to I-5 north, San Diego | ||||||
| Pennsylvania | 121,462,300 | 5.87 | 5.92 | 4.25 | 9.82 | 12,365,455 | 5,650,000 | I-5 CIP adds general purpose lanes, HOV lanes & corridor
arterial improvements from SR 91 to I-710 |
||||||
| Rhode Island | 11,480,000 | 0.55 | 0.56 | 0.37 | 10.67 | 1,076,164 | 5,630,000 | Widen & realign Cherry Avenue from 19th Street to one
block south of Pacific Coast Highway, Signal Hill. |
||||||
| South Carolina | 72,700,000 | 3.51 | 3.54 | 1.43 | 17.53 | 4,147,152 | 5,500,000 | Construct Coyote Creek Trail from Kelly Park to
Berryessa station, San Jose. |
||||||
| South Dakota | 1,400,000 | 0.07 | 0.07 | 0.26 | 1.83 | 764,309 | 5,500,000 | Construct Guadalupe River Trail project from highway 237 to I-880, San Jose. | ||||||
| Tennessee | 66,587,000 | 3.22 | 3.25 | 2.01 | 11.40 | 5,841,748 | 5,000,000 | 8.5 miles of six and eight lane arterial roadways,
building an essential eastwest route across Santa Clarita Valley. |
||||||
| Texas | 154,247,000 | 7.45 | 7.52 | 7.61 | 6.97 | 22,118,509 | 5,000,000 | Construct Daggett Road and Bridge Project, Port of Stockton, CA. |
||||||
| Utah | 13,500,000 | 0.65 | 0.66 | 0.81 | 5.74 | 2,351,467 | 5,000,000 | Widening of State Route 76 from Melrose Drive to I-5. | ||||||
| Vermont | - | - | - | 0.21 | - | 619,107 | 5,000,000 | Develop bicycle paths and public park space adjacent to the New River, Calexico. |
||||||
| Virginia | 27,901,800 | 1.35 | 1.36 | 2.54 | 3.78 | 7,386,330 | 5,000,000 | Widen and reconstruct Arch-Sperry Road to improve connection between Interstate 5 and State Route 99, San Joaquin County. |
||||||
| Washington | 32,860,000 | 1.59 | 1.60 | 2.11 | 5.36 | 6,131,445 | 5,000,000 | Monterey Bay Sanctuary Scenic Tail - connect missing segments of a bike and pedestrian trail around the Monterey Bay National Marine Sanctuary. |
||||||
| West Virginia | 10,600,000 | 0.51 | 0.52 | 0.62 | 5.86 | 1,810,354 | 5,000,000 | Widen State Route 98 from Route 111 to State Route 7, Calexico. |
||||||
| Wisconsin | 56,870,000 | 2.75 | 2.77 | 1.88 | 10.39 | 5,472,299 | 5,000,000 | Design and Implement Trails and Bikeway Plans for the Golden Gate National Recreation Area and Presidio. |
||||||
| Wyoming | 2,000,000 | 0.10 | 0.10 | 0.17 | 3.99 | 501,242 | 5,000,000 | Construct Illinois Street Bridge/Amador Street Connection and Improvements, San Francisco. | ||||||
| Puerto Rico | 9,000,000 | 0.43 | 5,000,000 | Planning, engineering, and construction of a tunnel on SR
75/282 to Naval Air Station, San Diego. |
||||||||||
| American Samoa | 3,200,000 | 0.15 | 5,000,000 | Upgrade Kanan Road interchange at US 101 (Aguora Hills) to improve safety and accessibility. | ||||||||||
| Guam | 6,600,000 | 0.32 | 5,000,000 | For environmental review and preliminary engineering for a
freeway-to-freeway interchange connecting Interstate 5 to State Route 78. |
||||||||||
| N. Mariana Islands | - | - | 5,000,000 | Preparation of environmental documents and design for conversion of the reliquished railroad bridge over the Feather River between Yuba City and Marysville | ||||||||||
| Virgin Islands | - | - | 5,000,000 | Alameda Co. Construct I580 Corr. HOV Projects | ||||||||||
| 5,000,000 | Rancho Cucamonga, I-15 Base Line Interchange Aux lanes and ramps | |||||||||||||
| NOTE: House TEA LU bill authorizes $11.1 billion for HPPs over 6 years. The additional $2.5 billion above the amount spent (shown here) will be allocated at a later time. | 5,000,000 | Contra Costa County Brentwood Tracy Express way study and construct | ||||||||||||
| 4,856,000 | Improvements to interchange between SR 23 and SR 101. Could include wideing of SR 23 from 2 lanes to 3. |
|||||||||||||
| 4,700,000 | Port of Hueneme Intermodal Access Improvement Project including grade separaiton at Rice Avenue/State Route 34; road widening at Hueneme Road. |
|||||||||||||
| Source: Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org | 4,644,000 | Utilize funds over a
four-year period to reconstruct and deep-lift asphalt on various roads thorughout the district in Santa Barbara County. |
||||||||||||
| 4,500,000 | Construciton of interchange at State Hwy 86 at Ave 66 in Coachella, CA. |
|||||||||||||
| 4,400,000 | 4-lane overpass for Mission Blvd grade separation
project, City of Pomona. |
|||||||||||||
| 4,240,000 | Realignment of La Brea Avenue to reduce congestion, Inglewood. |
|||||||||||||
| 4,200,000 | Construct Route 101 Auxiliary Lanes 3rd Avenue in the
city of San Mateo to Millbrae Ave in Millbrae. |
|||||||||||||
| 4,000,000 | Reconstruct and widen Garfield Ave bridge over Rio Hondo River Channel and apply seismic improvements, South Gate. |
|||||||||||||
| 4,000,000 | Reconstruct overcrossing and interchange at Interstate
10 & Tippacanoe Ave in Loma Linda. |
|||||||||||||
| 4,000,000 | Construct truck lane from Britannia Blvd to the Otay
Mesa Port Entry, San Diego County. |
|||||||||||||
| 4,000,000 | Construction of new freeway lanes, including HOV lanes
at US HWY 50 and Empire Ranch Road, Folsom,CA. |
|||||||||||||
| 4,000,000 | Widen South Main Street/Soda Bay Road between CR 400A/miler marker 0.0-mile marker 0.7 and CR502/mile marker 0.0 and mile marker 0.9. |
|||||||||||||
| 4,000,000 | Widen Avenue P to six lanes to alleviate trafic congestion in Palm Dale, CA. | |||||||||||||
| 4,000,000 | Bay Road improvements between Clarke Avenue and Cooley Landing. Northern access improvements between University and Illinois Avenue, East Palo Alto. |
|||||||||||||
| 4,000,000 | Conduct Study and Construct McKinley Intechange at SR 120 Project, Manteca, CA. |
|||||||||||||
| 4,000,000 | SF, Implement ITS on Muni Transit | |||||||||||||
| 4,000,000 | I-5/SR-56 Connector | |||||||||||||
| 3,800,000 | Widen State Route 99 between Tulare and Kingsburg, CA. | |||||||||||||
| 3,750,000 | Improvements (including arterial streets rehabilitation) to
enhance traffic and pedestrian safety in Northridge, Granada Hills, and Porter Ranch, Los Angeles. |
|||||||||||||
| 3,670,000 | Salinas Airport Boulevard/Hwy 101 interchange -- new 4 lane overpass with 2 lanes each direction, new approaches, new southbound on/off ramps, bicycle lanes. | |||||||||||||
| 3,670,000 | Santa Cruz Highway 1 widening and HOV Lanes | |||||||||||||
| 3,660,000 | Holllister SR25 widening --4 lane freeway between San Felipe Road to the US 101 separation, Gilroy. |
|||||||||||||
| 3,520,000 | Multi Year Riverside and Orange County Major investment Study and Phase work | |||||||||||||
| 3,500,000 | Construct Cypress Avenue over-pass to separate Interstate 10 and Union Pacific Railroad tracks, Fontana. |
|||||||||||||
| 3,500,000 | Implement streetscape project on Central Avenue from 103rd Street to Watts/103rd Street Station , Watts. |
|||||||||||||
| 3,500,000 | Santa Clara County, aux., bike and ped. Improvements-Almaden Expressway | |||||||||||||
| 3,400,000 | Widen Santa Maria River Bridge on U.S. Highway 101 between Santa Barbara County and San Luis Obispo Co. |
|||||||||||||
| 3,250,000 | Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in Reseda, Canoga Park, and Winnetka, Los Angeles. |
|||||||||||||
| 3,250,000 | Diesel Emissions Reduction Program for Gateway Cities Council of Governments. |
|||||||||||||
| 3,000,000 | Improvements for the Watt Avenue corridor between Antelope Road and the Capital City Freeway. |
|||||||||||||
| 3,000,000 | Resurface and construct truck lane at CA Hwy. 94 and Interstate 8 interchange, Boulevard. | |||||||||||||
| 3,000,000 | Construction of the improvements to the Western Placerville Interchanges on SR50 between the Missouri Flat Road Over-crossing and the Placerville Drive under-crossing in and near the City of Placerville in El Dorado County. | |||||||||||||
| 3,000,000 | Construct off ramp at Interstate 8/Imperial Avenue Interchange, El Centro. |
|||||||||||||
| 3,000,000 | Coastal Corridor Investments Phase II -A - multi-modal improvements on Rosecrans Avenue between Sepulveda Blvd and I-405, El Segundo. |
|||||||||||||
| 3,000,000 | Reconstruct and widen Del Mao Blvd to four lanes between Normadie Ave andNew Hampshire Ave, Los Angeles County |
|||||||||||||
| 3,000,000 | Gateway Cities intelligent management and logistics
freight movement measures |
|||||||||||||
| 3,000,000 | Mitigate congestion & operation problems along Harbor Blvd. Between I-405 southbound offramp & Sunflower Ave. | |||||||||||||
| 3,000,000 | Intelligent Transportation Systems on Long Beach Boulevard, Compton Boulevard, Wilmington Avenue, Walnut Avenue incl. interface with the L.A. County ITS system. | |||||||||||||
| 3,000,000 | Widen State Route 98, including storm drain improvements, from Kloke Road to State Route 111, Calexico. | |||||||||||||
| 3,000,000 | Constructs a Highway and Railroad grade separation at North Milliken Avenue, Ontario. |
|||||||||||||
| 3,000,000 | Repair and replace tunnel lining on Kanan, Kanan Dume, and Malibu Canyon Roads, Los Angeles County. |
|||||||||||||
| 3,000,000 | Widen Washington Boulevard, Commerce. | |||||||||||||
| 3,000,000 | Reconstruct interchange with partial-cloverleaf on-rmap for south-bound traffic entering I-80 from Central Avenue, City of Richmond. | |||||||||||||
| 3,000,000 | Technical Feasibility Study for the 710 Tunnel to connect
the 710 to the 210. |
|||||||||||||
| 3,000,000 | Provide widening of the exisitng two-lane railroad underpass on SR89 in Nevada County. | |||||||||||||
| 3,000,000 | Construct new ramps to Route 262, widen 262, reconstruct railroad bridges, Fremont. |
|||||||||||||
| 3,000,000 | Interchange improvements at Rice Avenue and US Highway 101, City of Oxnard. |
|||||||||||||
| 3,000,000 | Arcadia, Santa Anita Ave. Corridor Improvement project | |||||||||||||
| 3,000,000 | Placer County Ferrari Interchange Project | |||||||||||||
| 2,800,000 | Reconstruct interchange at I-10 and Riverside Avenue to improve traffic, Rialto. |
|||||||||||||
| 2,500,000 | Traffic signal upgrade, road configuration, and median
strip improvements to Lakewood Blvd between Telegraph Rd and Gardendale St, Downey. |
|||||||||||||
| 2,500,000 | Mid
Valley Station Road and Inter-Modal Improvement Project. |
|||||||||||||
| 2,500,000 | Will
add landscaping enhancements along the freeway for aesthetic purposes in Ventura County. |
|||||||||||||
| 2,500,000 | Pasadena Multi-modal
intelligent transportation system: traffic management center upgrade, transit management system , parking guidance system, the City of Pasadena. |
|||||||||||||
| 2,500,000 | Improve Glendale Freeway Terminus to provide pedestrian access, construct sound barriers, and implement landscaping, Los Angeles. |
|||||||||||||
| 2,500,000 | Reconstruct segments of Hollister Avenue between San Antonio Road and State Route 154, Santa Barbara County. |
|||||||||||||
| 2,500,000 | Transportation enhancements on Slauson Ave and Atlantic Blvd, Maywood. |
|||||||||||||
| 2,500,000 | Construct a 2.8 mile bikeway, working in conjuction with the
City of La Habra, along Lambert Road from Mills Ave to Valley Home Ave. |
|||||||||||||
| 2,500,000 | Construct truck lane on Keystone Road from State Route 111 to Austin Road, Imperial County. | |||||||||||||
| 2,500,000 | I-880 Federal highway safety improvements, High Street to
I-980, Oakland. |
|||||||||||||
| 2,500,000 | Imperial Co. I8 Widening overpass at Dogwood Rd. | |||||||||||||
| 2,500,000 | Downey, Fiestone Blvd. Widen and add turn lane | |||||||||||||
| 2,500,000 | City of Livermore, Upgrad and Reconstruct 1580/Vasco Rd. Interchange | |||||||||||||
| 2,400,000 | Construct right turn lanes, bus turn out lanes, right of
way, traffic signals. |
|||||||||||||
| 2,300,000 | Improvement of Culver Boulevard between Elenda and Sepulveda; Sepulveda Blvd between Green Valley Circle and Jefferson Boulevard, Culver City. |
|||||||||||||
| 2,200,000 | Reconstruct 1.1 miles of Long Beach Blvd from Imperial Hwy to Tweedy Blvd., Lynwood. |
|||||||||||||
| 2,150,000 | Construction of 7 grade separations in cities of Sante
Fe Springs, Pico Rivera, and La Mirada along BNSF Railway. |
|||||||||||||
| 2,000,000 | Improvement of intersection at Aviation Blvd. And Rosecrans Ave. to reduce congestion, Hawthorne. |
|||||||||||||
| 2,000,000 | Construction of interchange on Interstate 10 at Palm Drive | |||||||||||||
| 2,000,000 | Expand carsharing pilot program to serve low- and moderate-income neighborhoods in the City and County of San Francisco. |
|||||||||||||
| 2,000,000 | Reconstruct I-880/Route 92 Interchange, Hayward. | |||||||||||||
| 2,000,000 | Widening on Bear Valley Pkwy, City of Escondido, Citrus Avenue to Valley Pkwy and to northern city limit, local arterial. |
|||||||||||||
| 2,000,000 | Improvements to increase beach access, prevent storm drain failure and accommodate increasing pedestrian traffic on The Stand, Manhattan Beach. |
|||||||||||||
| 2,000,000 | Upgrade Jepson Parkway at the North and South Access Gates of Travis Air Force Base and widen Vanden Road segment , Solano County. |
|||||||||||||
| 2,000,000 | Construciton of a .2 miles section of Pointsettia Lane in
the City of Carlsbad, local arterial. |
|||||||||||||
| 2,000,000 | Realign State Route 79 from Gilman Springs Road to Domenigoni Parkway in San Jacinto. |
|||||||||||||
| 2,000,000 | Construct grade separation at State College Blvd.,
Fullerton /Anaheim. |
|||||||||||||
| 2,000,000 | Improve 16 roads, bridge and one bike path in Mariposa County. |
|||||||||||||
| 2,000,000 | Widen Wilmington Ave from 223rd street including ramp modifications, Carson. |
|||||||||||||
| 2,000,000 | Improvements at First Street and Erringer Road. The project will widen off ramps and surface streets. | |||||||||||||
| 2,000,000 | Construct new interchange at I-15 and State Route 18 (Falchion Road) and provide new highway access to U.S. 395. |
|||||||||||||
| 2,000,000 | Widening of two lanes SR79 highway to four lanes. | |||||||||||||
| 2,000,000 | Auburn Boulevard Reliever Route Under-grounding construction along I-80, Sacramento, CA. | |||||||||||||
| 2,000,000 | Realign Route 4 in City of Oakley bypass NW of Vintage Parkway to Main St at Second St. | |||||||||||||
| 2,000,000 | Alhambra Valley Blvd Enhancement Project | |||||||||||||
| 2,000,000 | Montclair Ramona Avenue grade separation along Alameda Corridor East. |
|||||||||||||
| 2,000,000 | Improve Ben Maddox Bridge crossing State Route 198, Visalia. | |||||||||||||
| 2,000,000 | Upgrade Olympic Boulevard between Vermont Ave and Western Ave to improve pedestrian safety and improve congestion, Los Angeles. |
|||||||||||||
| 2,000,000 | Construction of HOV and BRT lanes on I-15 from SR-78 to SR-163. |
|||||||||||||
| 2,000,000 | Upgrade existing county highway J59 in Toulumne, Stanislaus and Merced Counties. |
|||||||||||||
| 2,000,000 | Replace Winters Bridge, Yolo County. | |||||||||||||
| 2,000,000 | I-80 to Eureka Road
Interchange - Improve access to I-80 by reducing traffic congestion at two heavily traveled on- ramps at Eureka Road and Riverside Avenue in Placer Co. |
|||||||||||||
| 2,000,000 | Provides funding for the construction of auxiliary lanes in
each direction of US 101 fom Marsh Road to the Santa Clara County line. |
|||||||||||||
| 2,000,000 | Oregon-Page
Mill expressway improvements between US 101 and SR 82, Palo Alto. |
|||||||||||||
| 2,000,000 | Improving the interchanges on I-5 at Genesee Ave and Sorrento Valley Blvd. |
|||||||||||||
| 2,000,000 | This project will widen the northbound ramps and widen the
southbound ramps at the I-15 and SR-79 south interchange |
|||||||||||||
| 2,000,000 | Widen the Mountain View Avenue Bridge in Loma Linda. | |||||||||||||
| 2,000,000 | Builds a pedestrian bridge form Hiller Street to the Bay
Trail, Belmont. |
|||||||||||||
| 2,000,000 | Construct a soundwall along Esperanza Road in the City
of Yorba Linda. |
|||||||||||||
| 2,000,000 | Montclair Monte Vista Avenue grade separation along Alameda Corridor East. |
|||||||||||||
| 2,000,000 | Improve SR219 to 4-lanes in the cities of Riverside, Oakdale and Modesto. | |||||||||||||
| 2,000,000 | Temecula Winchester Project- This project will require a partial cloverleaf interchange on I-15 at exit/entrance ramps at Winchester Road. |
|||||||||||||
| 2,000,000 | Conduct Study of State Route 130 Realignment Project, San Joaquin County and Santa Clara County. |
|||||||||||||
| 2,000,000 | Murrieta, Los Alamos Rd. I15 Interchange Improvements | |||||||||||||
| 2,000,000 | Placer County, Sierra College I-80 Interchange Project. Design Deficiencies | |||||||||||||
| 2,000,000 | Solano County Cordellia Hill/ Sky Valley, transportation enhancement project | |||||||||||||
| 2,000,000 | Hesperia, Install new crossing at Ranchero Road | |||||||||||||
| 1,900,000 | Widening the Fairview
Road bridge over I, widening the onramp to accommodate three lanes, and provide one right-turn lane, one optional through or right lane and three through lanes. |
|||||||||||||
| 1,900,000 | I-238 Widening between I-580 and I-880, Ashland, Cherryland/San Leandro/San Lorenzo. |
|||||||||||||
| 1,750,000 | Upgrade and extend Commerce Avenue, City of Concord. | |||||||||||||
| 1,600,000 | I605 Interchange Construction Arrow Highway and Live Oak Ave., Irwindale | |||||||||||||
| 1,500,000 | Rehabilitate arterials, Compton… | |||||||||||||
| 1,500,000 | Construct pedestrian
streetscape improvements on Ocean Blvd and Anaheim Street in Long Beach, including lighting landscaping and irrigation, and seating, drinking fountains, bicycle racks and trash receptacles. |
|||||||||||||
| 1,500,000 | Improve Ave 12-Fwy 99 interchange; create five lanes and
install traffic signals. Construct Road 29 entrance east of the interchange. |
|||||||||||||
| 1,500,000 | I-80 Gilman Street interchange improvements, Berkeley. | |||||||||||||
| 1,500,000 | Upgrade roads, traffic signals and turn lanes in order to
ease traffic congestion for the Willow/Ashlan & Shaw intersections. |
|||||||||||||
| 1,500,000 | Add carpool lane and truck lane on Interstate 5 in Santa
Clarita Valley, CA. |
|||||||||||||
| 1,500,000 | Grade separation of Lenwood Road in Barstow, CA. | |||||||||||||
| 1,500,000 | Construct truck ramp linking Interstate 5 to National City
Marine Cargo Terminal, Naitonal City. |
|||||||||||||
| 1,500,000 | Construct Inland Empire transportaiton Management Center to better regulate traffic and dispatch personnel to incidents, Fontana. |
|||||||||||||
| 1,500,000 | Replace Route 1 San Pedro Creek bridge, Pacifica. | |||||||||||||
| 1,500,000 | Fresno, Upgrade Save Mart Center intersection | |||||||||||||
| 1,500,000 | Victorville, I15 Interchange | |||||||||||||
| 1,300,000 | Campbell, Add Turn Lane and Technology to San Thomas Expressway and Hamilton Ave intersection | |||||||||||||
| 1,250,000 | Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in Sylmar, Lake View Terrace, and Mission, Los Angeles. |
|||||||||||||
| 1,250,000 | First Street Bridge realignment, Los Angeles. | |||||||||||||
| 1,250,000 | Widening Mt Vernon Ave bridge to four lanes, Colton. | |||||||||||||
| 1,250,000 | Reconstruct 1.5 miles of Paramount Blvd from Carson Street to Candlewood St., Lakewood. | |||||||||||||
| 1,250,000 | FHWA Diesel Emissions Reduction Program for the Gateway Cities. Los Angeles County. |
|||||||||||||
| 1,250,000 | Construct left turn lane to ease congestion at Interstate-10
into Rosemead Boulevard and Telstar Avenue, El Monte. |
|||||||||||||
| 1,250,000 | Streetscape Improvements at E. 14th/Mission Blvd., Alameda County. |
|||||||||||||
| 1,250,000 | San Bernardino, Grad Separation between State Street and BNSF Tracks | |||||||||||||
| 1,200,000 | Implement streetscape improvements on segments of Laurel Canyon Blvd. And Victory Blvd., North Hollywood. |
|||||||||||||
| 1,200,000 | I-580 Castro Valley Interchange Improvements. | |||||||||||||
| 1,200,000 | Harbor Blvd Intelligent Transportation System (ITS).
Widen intersections and add lanes, Garden Grove/Anaheim |
|||||||||||||
| 1,100,000 | Construct multi-use trails at Galster Park that link to
other local Los Angeles County trails, West Covina. |
|||||||||||||
| 1,100,000 | Reconstruct 7 miles of Whittier Blvd, from Valley Home (SR 72) to Riviera Rd, Whittier. |
|||||||||||||
| 1,050,000 | Construct 213th Street pedestrian bridge to provide safe passage for pedestrians and wheelchairs, Carson. |
|||||||||||||
| 1,000,000 | Construct parking lot and improved museum pedestrian access from the trolley station, San Diego. |
|||||||||||||
| 1,000,000 | Study
feasibility of Maglev link between San Diego and proposed San Diego Regional International Airport, Imperial County. |
|||||||||||||
| 1,000,000 | Provide grade separation at the Firestone/Old River School
Road intersection, Downey. |
|||||||||||||
| 1,000,000 | Improve I-8 offramp to the Desert Farming Institute,
Imperial County. |
|||||||||||||
| 1,000,000 | Conduct Study and Construct I 205/Chrisman Road Interchange Project, Tracey, CA. |
|||||||||||||
| 1,000,000 | Widen Boulder Avenue Bridge in Highland. | |||||||||||||
| 1,000,000 | Elk Horn Boulevard Widening to SR 99, Sacramento, CA. | |||||||||||||
| 1,000,000 | Reconstruct 152/156 Interception Project, Santa Clara County, CA. |
|||||||||||||
| 1,000,000 | Replace Davis Street Highway I-880 overpass, San Leandro | |||||||||||||
| 1,000,000 | Realign and make improvements to California Hwy 199 between mile marker 22.16 and mile marker 23.65. |
|||||||||||||
| 1,000,000 | Develop and implement traffic calming measures for
traffic exiting the I-710 into Long Beach. |
|||||||||||||
| 1,000,000 | Widen Harbor Blvd to 8 lanes in Anaheim Resort Area. | |||||||||||||
| 1,000,000 | Improve I-8 offramp at Octotillo to the Imperial Valley College Desert Museum /Regional Traveler Visitor Center, Imperial County. |
|||||||||||||
| 1,000,000 | Atlantic Boulevard Bridge widening, Vernon | |||||||||||||
| 1,000,000 | Conduct Study and Construct Vasco Road Safety Improvements Project, Contra Costa County, CA. |
|||||||||||||
| 1,000,000 | Interchange expansion at Interstate 10 and Indian Canyon Drive, City of Palm Springs. |
|||||||||||||
| 1,000,000 | Construct 4-lane connector between I-40 and Arizona Route 95 in Needles. | |||||||||||||
| 1,000,000 | Construction of HOV lanes on I-5 from Vandegrift Blvd to
La Jolla Village Drive. |
|||||||||||||
| 1,000,000 | San Gabriel Boulevard Highway widening and intersection improvement project, the City of San Gabriel. |
|||||||||||||
| 1,000,000 | Design and environmental analysis for State Route 11 connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego. |
|||||||||||||
| 1,000,000 | Colima Road/Fullerton Road intersection improvements in the city of Rowland Heights. |
|||||||||||||
| 1,000,000 | Reconstruct I-710 southern terminus off ramps, Long Beach | |||||||||||||
| 1,000,000 | Improve Central Avenue Historic Corridor Streetscape, Los
Angeles. |
|||||||||||||
| 1,000,000 | Improve access from I-8 and construct parking lot for the
Imperial Sand Dunes Recreation Area Visitors Center, Imperial Valley. |
|||||||||||||
| 1,000,000 | Land acquisition to
mitigate impacts to natural habitats and wetlands caused by highway projects on US 1 and US 101 in areas around Solstice Canyon in the Santa Monica National Mountains Recreation Area. |
|||||||||||||
| 1,000,000 | Construct overpass at Central Avenue Overpass in the Union Pacific Railroad Crossing, Newark. | |||||||||||||
| 1,000,000 | Land acquisition in
Sargent Hills to mitigate for road runoff into water sources and to protect a wildlife corridor connecting Santa Cruz Mountains to Mt. Hamilton Range, Santa Clara County. |
|||||||||||||
| 1,000,000 | Construct fourth bore of Caldecott Tunnel on Route 24. | |||||||||||||
| 1,000,000 | Construct road from Mace Blvd in Yolo County to federally
supported Pacific Flyway wildlife area. |
|||||||||||||
| 1,000,000 | Conduct study and Construct Lammers Rd/ I-205 Widening and Interchange Project, Tracy, CA. | |||||||||||||
| 1,000,000 | Construction of interchange at State Hwy 86 and Ave 50
in Coachella, CA. |
|||||||||||||
| 1,000,000 | Quincy-Oroville Highway
Rehabilitation - Provides for 9.5 miles of pavement rehabilitaiton, culvert replacements, guardrail installation, signing and stripping in Plumas Co. |
|||||||||||||
| 1,000,000 | The Esplanade improvements to reduce pedestrian/bicycle/ automobile traffic congestion and improve oceanfront access Redondo Beach. |
|||||||||||||
| 1,000,000 | Feasibility study, design, engineering, grade separation,
pedestrian improvements, and traffic calming project, the City of South Pasadena. |
|||||||||||||
| 1,000,000 | Acquire approximately 4,000 acres of land at the Desert Cahullia Prehistoric Site, Imperial County. |
|||||||||||||
| 1,000,000 | Implement Congestion Mitigation and Air Quality Improve- ment Project, Orange County. |
|||||||||||||
| 1,000,000 | Danville, Camino Tassajara-Crown Canyon to East Town Project. | |||||||||||||
| 1,000,000 | Contra Costa County, Fernandez Ranch Trans Enhancements | |||||||||||||
| 1,000,000 | Millbrae, SF Bay Trail 101 bike/ped overpass | |||||||||||||
| 1,000,000 | Contra Costa Co. Improve ped and bike trails in East Bay Reg. Park District | |||||||||||||
| 838,690 | Cabot-Camino Capistrano Bridge. Construction of a bridge that will connect highways Camino Capistrano and Cabot Road. |
|||||||||||||
| 800,000 | Implement Manor Drive overpass improvement, Pacifica. | |||||||||||||
| 800,000 | Roadway surface improvments, street lighting, and storm drain improvments to South Center Street from Baughman Road to State Route 78/86, Westmoreland. |
|||||||||||||
| 800,000 | Construct Alviso Bay Trail Project, a 1.3 mile trail from
from Gold Street to San Tomas Aquino Creek, Santa Clara County. |
|||||||||||||
| 784,000 | Reconstruction
and repair of pedestrian walkways in and around the campus of California State University Northridge to improve traffic and safety. |
|||||||||||||
| 750,000 | Construct San Leandro-Oakland biking and hiking path. | |||||||||||||
| 750,000 | Improvements (inclusing arterial street rehabilitation) to
enhance traffic and pedestrian safety in the Van Nuys community, Los Angeles. |
|||||||||||||
| 700,000 | Construct 4,700 ft. of medians to improve
safety/congestion on Imperial Highway from Valley View to Telegraph Road, La Mirada. |
|||||||||||||
| 700,000 | Construct Dry Creek and Enterprise canal trails in Clovis. | |||||||||||||
| 600,000 | Provide landscape enhancement of an existing open culvert on Atherton Street, Long Beach. | |||||||||||||
| 600,000 | Repair and realignment of Brahma Drive and Winettka Avenue, which serves the students of Los Angeles Pierce College. |
|||||||||||||
| 600,000 | San Gabriel City, Ped Calming Measures on Las Tunas Blvd. | |||||||||||||
| 575,000 | LA River bikeway, Sherman Oaks | |||||||||||||
| 550,000 | Construct truck lane on Baughman Road from State Route 78/86 to Forrester Road, Westmoreland. |
|||||||||||||
| 510,000 | Pedestrian Bridge Over Atlantic Boulevard, the City of Monterey Park. |
|||||||||||||
| 500,000 | Implement and maintain an incident management system for I-880 and I-80, Alameda and Contra Costa Counties. |
|||||||||||||
| 500,000 | Project design, environmental assessment, and roadway construction of Lonestar Road from Alta Road to Enrico Fermi Drive, San Diego County. |
|||||||||||||
| 500,000 | Construct exit from SR 78 to SDSU Brawley Campus | |||||||||||||
| 500,000 | Citywide traffic signal upgrades requiring the installation
of hardware and software at 9 major intersections, Palo Alto. |
|||||||||||||
| 500,000 | Construct Marin-Sonoma Narrows bicycle and pedestrian walkway. |
|||||||||||||
| 500,000 | Conduct a project study to examine an interchange at State Route 165 and Bradbury Road, Merced County. | |||||||||||||
| 500,000 | Study to evaluate traffic implications resulting from the
proposed re-alignment of Nutwood Avenue, Fullerton. |
|||||||||||||
| 500,000 | Construct safe access to streets for bicyclists and pedestrians including crosswalks, sidewaks, and traffic calming measures, Covina. |
|||||||||||||
| 500,000 | Long Beach, Paramount Blvd. Reconstruction | |||||||||||||
| 480,000 | ATIS added to the Magnolia corridor connecting
Riverside, Corona, Moreno Valley, and portions of Riverside County. |
|||||||||||||
| 450,000 | Rehabilitate the pavement of Vinvcent Avenue between Interstate I-10 and the north city limit, West Covina. |
|||||||||||||
| 400,000 | Costruct A 2.8 mile bikeway, working in conjuction with
the city of Whittier, that will connect four other regional trails and bikeways. |
|||||||||||||
| 400,000 | Reconstruct Carson w/ on/off ramp I 605 Hawaiian Gardens | |||||||||||||
| 350,000 | Traffic signal upgrades on Bellflower Blvd at Alondra Blvd and Rosecrans Ave, Bellflower. | |||||||||||||
| 300,000 | Construct pedestrian bicycle and ADA accessible boardwalks at the Pismo Beach Promenade, San Luis Obispo County. |
|||||||||||||
| 300,000 | Modifies 9 traffic signals between Willow Road and Middlefield Road and Hamilton Avenue, Menlo Park. |
|||||||||||||
| 300,000 | Preliminary engineering and EIS/EIR process for 33-mile long Orange Line mag-lev connecting Los Angeles with Orange County. |
|||||||||||||
| 300,000 | Phase II of the Alameda Corridor East Project, constructing
grade separation projects from E. Los Angeles to Pomona. |
|||||||||||||
| 300,000 | Develop bicycle paths and pedestrian access to Third Avenue, Chula Vista. |
|||||||||||||
| 215,000 | Develop conceptual master plan including economic analysis and environmental study to improve the efficiency of transportation facilities, Covina. |
|||||||||||||
| 214,000 | Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in the Sherman Oaks community, Los Angeles. |
|||||||||||||
| 150,000 | Construct sound barriers at the I-5/S.R. 54 Interchange, National City. |
|||||||||||||
| 125,200 | Antonio Parkway Improve Signal System | |||||||||||||
| 108,000 | Install signal pre-emption hardware at 53 traffic signals
throughout Culver City to improve bus and first responder travel times. |
|||||||||||||
| 100,000 | Renovation and repair of Rosemead Blvd-Hwy 19 such as new sidewalks, traffic loops, pavement, street lights. |
|||||||||||||
| 100,000 | Study economic, environmental and congestion mitigation benefits of a Hybrid Utility Vehicle, Santa Barbara County. |
|||||||||||||
| 85,000 | Install traffic signal and ramps at Interstate-10 and
Walnut Grove Avenue to reduce congestion, Rosemead. |
|||||||||||||
| 75,000 | Transportation enhancements, Bellflower. | |||||||||||||
| 50,000 | Repair Rosecrans Ave and Alondra Blvd bridges, Bellflower. | |||||||||||||
| 938,897,000 | Total California High Projects | |||||||||||||
| Source: Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org | ||||||||||||||