| CA |
1 |
California |
Construct
safe access to streets for bicyclists and pedestrians including crosswalks,
sidewalks and traffic calming measures, Covina |
500,000 |
| CA |
2 |
California |
Develop
and implement ITS master plan in Anaheim |
1,500,000 |
| TN |
3 |
Tennessee |
Improve
circuitly on vehicle prOtection device installed at highway-RR crossing in
Athens, TN |
59,000 |
| CA |
4 |
California |
Build
a pedestrian bridge from Hiller Street to the Bay Trail, Belmont |
2,450,000 |
| OH |
5 |
Ohio |
Renovate
and expand National Packard Museum and . adjacent historic Packard facilities
|
3,000,000 |
| IL |
6 |
Illinois |
Land
acquisition for the widening of Rt. 47 in Yorlcille, IL |
1,000,000 |
| NE |
7 |
Nebraska |
Interstate
80 Interchange at Pflug Road, Sarpy County, Nebraska |
1,400,000 |
| TX |
8 |
Texas |
Construction
of Segment #1 of Morrison Road for the City of Brownsville |
2,000,000 |
| MI |
9 |
Michigan |
1-96 at
Latson Road Interchange Improvements |
6,000,000 |
| IL |
10 |
Illinois |
Preconstruction
and Construction of ZL 83 at ZL 132 |
1,000,000 |
| TN |
11 |
Tennessee |
Add
third lane on US-27 (State Route 29) for truck-climbing lane and realignment
of roadway at Wolf Creek Road to Old US-27 north
of Robbins |
6,000,000 |
| MI |
12 |
Michigan |
Reconfiguration
of US-3JfrOm the Manistee Basquel Bridge to Lincoln Street in the city
ofManistee |
750,000 |
| AR |
13 |
Arkansas |
Bentonville,
Arkansas - widen and improve 1-540 and SH-102 Interchange |
1,420,000 |
| WA |
14 |
Washington |
41st
St. Interstate 5 Interchange Projec’ in Everett |
2,600,000 |
| CA |
15 |
California |
Reconstruct and deep-lift asphalt on various roads thorughout
the district in Santa Barbara County. |
4,644,000 |
| OK |
16 |
Oklahoma |
Improving
the 1-35 Interchange at Milepost I Near Thackerville |
2,000,000 |
| NJ |
17 |
New Jersey |
Laurel
Avenue Bridge replacement in Holmdel Township |
1,000,000 |
| OH |
18 |
Ohio |
Construct
overpass over CSXRailroad on Columbia Road (State Route 252), Olrnsted Falls |
460,000 |
| TN |
19 |
Tennessee |
Reconstruct
and widen US-72 from south of State Roiae 175 to State Route 57, Shelby
County |
1,000,000 |
| NY |
20 |
New York |
Construct
roundabout at Oregon Road- Westbrook Dr-Red Mill Road in Town of Cortlandt |
475,000 |
| IL |
21 |
Illinois |
Construct
Bike, Pedestrian Paths, Orland Hills |
400,000 |
| PA |
22 |
Pennsylvania |
Construct
I-79/Rte 3025 missing ramps at Jackson Township, PA |
1,150,000 |
| PR |
23 |
Puerto Rico |
Construction
of PR 833 to PR 831. PR 831 to PR 5. Bridge #667 PR 830, KM 2.40 PR 5
connectorfrom PR 167 to intersation with PR 5 and
Las Cumbres Ave |
6,000,000 |
| TX |
24 |
Texas |
Extension
of SH349 to US 87 Relief Route in Dawson County |
2,500,000 |
| IL |
25 |
Illinois |
Paricing facility in
Peoria, IL |
1,000,000 |
| IL |
26 |
Illinois |
Construct
Interchange on Interstate 255 at Dupo/Columbia |
19,000,000 |
| MN |
27 |
Minnesota |
Construction
and right-of-way acquisition for interchange at TH65 and TH242 in Blame, MN |
4,000,000 |
| CA |
28 |
California |
Huntington
Beach, Remove off-ramp on 1-405 at Beach Blvd. Construct fourth lane on 1-405
North, at the Beach Blvd. interchange |
500,000 |
| TN |
29 |
Tennessee |
Addition
of an interchange on 1-40 in Roane County at ButtermilkRoad and 1-40 |
3,000,000 |
| NY |
30 |
New York |
Purchase
Three Ferries and Establish System for Feriy Service from Rockawav Peninsula
to Manhattan |
15,000,000 |
| IL |
31 |
Illinois |
Reconstruction
of Moclcingbird Lane and Stratford St, Granite City |
1,500,000 |
| FL |
32 |
Florida |
Construction
a new multi-lane tunnel below the channel to link the Port of Miami on Dodge
Island with 1-395 on Watson Island and 1-95 in
Downtown Miami |
500,000 |
| MD |
33 |
Maryland |
Rehabilitation
of West Baltimore Trail and Implementation of Pedestrian Improvements Along
Associated Roadways |
900,000 |
| TN |
34 |
Tennessee |
Removal
and Reconfiguration of Interstate Ramps —1-240, Memphis |
3,000,000 |
| CA |
35 |
California |
Replace
structurally unsafe Winters Bridge for vehicles, bicycles and pedestrians
between Yolo and Solano Counties. |
2,000,000 |
| IL |
36 |
Illinois |
City
of Havana. Illinois Upgrades to Broadway Street |
952,572 |
| MN |
37 |
Minnesota |
Construction of Gitchi-Gami State Trailfrom Cascade River to
Grand Marias |
900,000 |
| LA |
38 |
Louisiana |
Develop
master transportation plan for the New Orleans Regional Medical Center |
500,000 |
| VA |
39 |
Virginia |
Final
Design and Construction for improvements at 1-64 and City Line Road, Virginia
Beach and Chesapeake |
1,000,000 |
| MA |
40 |
Massachusetts |
Replacement
of Cross Street Bridge spanning flood prone Aberjona River, Winchester |
1,000,000 |
| NC |
41 |
North Carolina |
Construction
of and improvement to 1-73, 1-74, US 220 in Montgomeiy and Randolph Counties,
NC |
11,000,000 |
| IA |
42 |
Iowa |
Access
and enhancements to access Lake Belva Deer, Sigourney |
1,000,000 |
| CA |
43 |
California |
Roadway
surface improvements, street lighting, and storm drain improvements to South
Center Street from Baughman Road to State Route
78/86, Westmorland |
800,000 |
| TX |
44 |
Texas |
Construct
two connectors between SH288 and Beltway 8 |
5,000,000 |
| NY |
45 |
New York |
Implement
Central NY highway grade crossing and grade separation project |
2,000,000 |
| CA |
46 |
California |
Douglas St.
Improvements, El Segundo |
4,000,000 |
| MA |
47 |
Massachusetts |
Reconstruction
of Massachusetts Avenue including safety improvements and related pedestrian,
bike way in Arlington |
2,000,000 |
| NY |
48 |
New York |
Reconstruction
of Rt 5,8,12 (North South Arterial) Burrstone Rd. to Oriskany Circle, City of
Utica |
1,000,000 |
| OK |
49 |
Oklahoma |
Construction
of Norman highway-rail Grade Separation |
1,000,000 |
| PA |
50 |
Pennsylvania |
Construction
of the Montour Trail, Great Allegheny Passage |
1,000,000 |
| CA |
51 |
California |
Route 1 San Pedro Creek Bridge replacement in Pacifica |
3,000,000 |
| MI |
52 |
Michigan |
South
Lyon, 2nd St. between Warren and Haggadorn |
125,000 |
| PA |
53 |
Pennsylvania |
Street
improvements, Abington Township |
2,000,000 |
| IA |
54 |
Iowa |
Study of a
direct link to 180, Pella |
500,000 |
| TN |
55 |
Tennessee |
Sweetwater
IN Improving Vehicle Efficiencies at At-Grade highway-railroad Crossings |
96,000 |
| OR |
56 |
Oregon |
Construct
bike/pedestrian path, Powers |
440,000 |
| IL |
57 |
Illinois |
IL
6 to 1-180 - Phase 2 study and land acquisition |
2,000,000 |
| FL |
58 |
Florida |
Construct
a new bridge at Indian Street, Martin County |
1,000,000 |
| GA |
59 |
Georgia |
Improve
sidewalks, upgrade lighting, and add landscaping in downtown Glennville |
500,000 |
| LA |
60 |
Louisiana |
Continue planning and construction of the New OrleansRegional
Planning Commission Mississippi River trail in St.John |
1,900,000 |
| MO |
61 |
Missouri |
ROAD
WIDENING AND CURB AND GLITTER IMPROVEMENTS ON HWY 33 INKEARVEY |
3,000,000 |
| TX |
62 |
Texas |
The
SH146, Port Rd direct connectors allows traffic bypass several rail lines
& traffic signals at, near intersection of SH146 and Port Rd |
13,200,000 |
| UT |
63 |
Utah |
Reconstruct
South Moore Cut-off Road in Emery County |
4,500,000 |
| PA |
64 |
Pennsylvania |
Improvements
to exits along Interstate 81 in Franklin County, PA -- Antrim Road |
8,200,000 |
| OH |
65 |
Ohio |
Plan
and construct the Southeast Arterial Connector highway at Delaware, Ohio |
5,000,000 |
| TN |
66 |
Tennessee |
To
construct transportation enhancements on a multi-faceted greenway in downtown
Columbia on the Duck River |
8,000,000 |
| RI |
67 |
Rhode Island |
New
Interchange constructed from 1-195 to Taunton and Warren Avenue in East
Providence |
5,800,000 |
| NY |
68 |
New York |
Town
of Chester reconstruction of Walton Lake Estates subdivision and related
roads |
80,000 |
| NC |
69 |
North Carolina |
Extend ML.
King Jr. Boulevard in Monroe |
2,000,000 |
| NY |
70 |
New York |
Town
of Fishkill Old Glenham Road (aka Washington Aye) reconstruction |
325,500 |
| PA |
71 |
Pennsylvania |
US.
Route 13 Corridor Reconstruction, Redevelopment and Beautification, Bucks
County |
2,000,000 |
| NY |
72 |
New York |
Rochester
& Southern Highway-Rail Grade Crossing Bypass, Silver Springs, New York |
1,500,000 |
| IL |
73 |
Illinois |
Upgrade
streets in the City of Rushville, IL |
1,000,000 |
| MO |
74 |
Missouri |
CONSTRUCT2
LANES ON CHOUTEAU TRAFFIC WAY FROMMO 210 TO 1-35 |
2,000,000 |
| AZ |
75 |
Arizona |
US 60 to Gonzalez Pass |
2,000,000 |
| LA |
76 |
Louisiana |
Interstate
lighting .cystem (110 and LA 93) |
300,000 |
| GU |
77 |
Guam |
Reconstruct
Hagtña River Bridges, Municipality of Hagtfla |
6,600,000 |
| WA |
78 |
Washington |
SR
704 Cross-Base Highway, Spanaway Loop Road to SR 7 |
1,500,000 |
| NY |
79 |
New York |
Village
of Brewster Main Street and Route 6 related construction and improvements |
975,000 |
| PA |
80 |
Pennsylvania |
Design
and construct relocation of US]] between Ridge Hill and Hempt Roads |
5,680,000 |
| VA |
81 |
Virginia |
Improve
Route 42 (Main Street) in Bridgewater, Virginia |
500,000 |
| NY |
82 |
New York |
Construction
of Route 59 Palisades Interstate Parkway to Route 303 |
1,000,000 |
| IL |
83 |
Illinois |
Improve University
Drive, Macomb |
500,000 |
| CA |
84 |
California |
Adams
Street Rehabilitation Project, Glendale |
388,000 |
| NY |
85 |
New York |
Construct
grade separation-interchange between Taconic Parkway and Pudding Street |
1,450,000 |
| IA |
86 |
Iowa |
Construction
of] 00th St interchange on 135-80, Urbandale |
1,000,000 |
| MO |
87 |
Missouri |
Lewis and Clark Expressway
|
2,000,000 |
| PA |
88 |
Pennsylvania |
Mercer
County, PA 1-79 and PA 208 Interchange Improvement Project |
2,000,000 |
| WA |
89 |
Washington |
Plan to
relieve traffic until North-South freeway -HJVY 2 |
550,000 |
| CA |
90 |
California |
San
Diego River Multiuse Bicycle and Pedestrian Path |
500,000 |
| PA |
91 |
Pennsylvania |
Construction
of the Lafayette Street extension project in Montgomery County, PA |
10,400,000 |
| NJ |
92 |
New Jersey |
Construct
new ramps between 1-295 and Route 42 |
5,000,000 |
| PA |
93 |
Pennsylvania |
Construct
S.R. 29 Wal-mart to River Betterment,Eaton Tunkhannock, Wyoming County |
1,700,000 |
| WV |
94 |
West Virginia |
Construct Shawnee Parkway |
1,100,000 |
| FL |
95 |
Florida |
Improve
pedestrian and bicycle sidewalks, lighting, and ADA ramps---Main Street,
Canal Street, Miramar |
600,000 |
| MN |
96 |
Minnesota |
Reconstruct
CSAH 19 from CSAH 36 to CSAH 2, Morrison County |
200,000 |
| TN |
97 |
Tennessee |
Develop
trails, bike paths and recreational facilities on Bird Mountain, Morgan
County for Cumberland Trail State Park |
250,000 |
| MN |
98 |
Minnesota |
Lyndale Avenue
Bridge, Richfield |
13,000,000 |
| MI |
99 |
Michigan |
Provide
a bypass around the Village ofAlmont during M-53 reconstruction which is
contiguous with Macomb County |
100,000 |
| NY |
100 |
New York |
Town of
Wailkill new construction road-tunnel under Rt. 17 |
1,000,000 |
| NY |
101 |
New York |
Village
of Cold Spring Main Street and ancillary road and sidewalk improvements |
820,000 |
| IL |
102 |
Illinois |
West Ridge Nature
Preserve, Chicago |
3,000,000 |
| TN |
103 |
Tennessee |
widen
Campbell Station Road in Knoxville, TAT |
1,800,000 |
| AL |
104 |
Alabama |
Widen
Hiy. 84 to 4 lanes west of 1-65 from Evergreen to Monroeville and beyond to
the State of AL line |
4,000,000 |
| MS |
105 |
Mississippi |
Widen
State Highway 57 from 1-10 through Vancleave |
5,000,000 |
| WA |
106 |
Washington |
Widening
SR527 from 2 lanes to 5 from Bothell to Mill Creek |
1,500,000 |
| OH |
107 |
Ohio |
Construct
prop osed connection SR 207, SR 104, and US 23 in Ross County |
2,000,000 |
| MI |
108 |
Michigan |
Construct
improvements to Finkbeiner Roadfrom Patterson Road to Whitneyville Road in
Barry County, and new bridge over Thornapple River
|
4,400,000 |
| PA |
109 |
Pennsylvania |
York
Road improvements from Horsham Road to Summit Avenue, Borough of Hatboro |
1,250,000 |
| OH |
110 |
Ohio |
Intersection
improvements at Highland and Bishop Roads in the City of Highland Heights, OH
|
612,000 |
| WI |
111 |
Wisconsin |
Reconstruct
Wisconsin State Highway 21 at 1-94 interchange |
3,000,000 |
| MN |
112 |
Minnesota |
Safety
improvements and intersection enhancements of TH 95 and TH 169, Princeton |
1,800,000 |
| NY |
113 |
New York |
Wading
River Bicycle and Pedestrian Project in Riverhead |
1,200,000 |
| FL |
114 |
Florida |
Widen
County Line Road (CR 578) from Suncoast Parkway to US41 to four lanes |
6,000,000 |
| IL |
115 |
Illinois |
Improve
GreatRiverRoad, Warsaw |
750,000 |
| NY |
116 |
New York |
Yonkers,
New York, Trolley Bus Acquisition |
300,000 |
| FL |
117 |
Florida |
Construct
East Central Regional Rail Trail in Volusia County, Florida |
1,000,000 |
| MO |
118 |
Missouri |
YHighway US 71
to MO 58, Cass County |
2,000,000 |
| WY |
119 |
Wyoming |
WYO 59 Reconstruction |
2,000,000 |
| LA |
120 |
Louisiana |
Plan and construct bike/pedestrian crossings of
WashingtonPalmetto Canal in the vicinity ofXavier University |
4,000,000 |
| NC |
121 |
North Carolina |
Winston-Salem
Northern Beltway, Eastern Section and Extension, NC |
5,000,000 |
| CA |
122 |
California |
Willow and Herndon Traffic Flow Improvements, City of Clovis |
300,000 |
| MO |
123 |
Missouri |
US 71 at
YHighway North and Southbound Ramps |
2,000,000 |
| CA |
124 |
California |
Landscaping Enhancements Along Ronald Reagan Freeway Route 118
for aesthetic purposes |
2,500,000 |
| NC |
125 |
North Carolina |
Widens
US 29 Business Freeway Drive from South Scales St. to NC 14 in Rockingham
County |
10,000,000 |
| PA |
126 |
Pennsylvania |
Widening,
rechannelization, signalization to 2nd ave and Bates street, replace Elisa
Furnace bridge over Bates Street |
800,000 |
| KS |
127 |
Kansas |
Resurfacing,
grading, replacing guardrails & adding shoulders to Highway 77 in Geary
Cty, to accommodate expected traffic increase |
784,000 |
| MO |
128 |
Missouri |
WIDENiNG, CURB AND GUTTER IMPROVEMENTSAS |
3,000,000 |
| IL |
129 |
Illinois |
Construct
streetscape along Morse avenue from Clark street to Sheridan road, Chicago |
2,000,000 |
| SC |
130 |
South Carolina |
Build
extension of North Rhett Boulevard from Liberty Hall Road to US 176 in SC |
7,000,000 |
| NH |
131 |
New Hampshire |
Construct
and upgrade intersection of Route 3 and Franklin Industrial Drive in Franklin
|
1,000,000 |
| GA |
132 |
Georgia |
Construct
Waycross East Bypass from US 84 in Pierce County, Georgia to US 1 in Ware
County, Georgia |
2,200,000 |
| NY |
133 |
New York |
Design
and Construction of a transportation enhancement project at the Erie Canal
Aqueduct in downtown Rochester |
1,500,000 |
| CA |
134 |
California |
Improvement
of intersection at Balboa Blvd. and San Fernando Rd |
500,000 |
| TN |
135 |
Tennessee |
Impove
Vehicle Efficiencies at highway At-Grade Railroad Crossing in Athens, TN |
99,000 |
| WI |
136 |
Wisconsin |
Develop
pedestrian and bike connections that link to Hank Aaron State Trail in
Milwaukee |
2,100,000 |
| AK |
137 |
Alaska |
Keystone Drive Road
Improvements |
1,000,000 |
| GA |
138 |
Georgia |
Pedestrian
and streetscape improvements, Ellaville |
400,000 |
| NY |
139 |
New York |
Construct
and improve pedestrian access on Main Street in Hempstead |
2,000,000 |
| IL |
140 |
Illinois |
Preconstruction
activities IL 336 from Macomb to Peoria |
2,000,000 |
| OH |
141 |
Ohio |
Purchase
of right-of-ways for construction ofpedestrian and bicycle improvements in
the City ofAurora, OH |
500,000 |
| IL |
142 |
Illinois |
Replacement
of bridge on Harlem Avenue, The Village of River Forest |
1,000,000 |
| CA |
143 |
California |
State
Route 86S and Ave 66 highway safety grade separation |
4,500,000 |
| IL |
144 |
Illinois |
Construct
Bissel Street Roadway Connector, Tn-City Regional Port District |
850,000 |
| CT |
145 |
Connecticut |
Improve
Route 1 between East Avenue and Belden Avenue, Norwalk, CT |
2,000,000 |
| IA |
146 |
Iowa |
Central
IA Trail Loop, bicycle and pedestrian, Ankeny to Woodward section |
1,000,000 |
| MI |
147 |
Michigan |
Chippewa
County, Upgrade Tilson Road between M-28 South to intersection of M-48 at
Rudyard |
1,000,000 |
| WA |
148 |
Washington |
Coal
Creek Parkway Bridge Replacement, Newcastle WA |
1,000,000 |
| PA |
149 |
Pennsylvania |
Complete
gaps in the Pittsburgh Riveifront Trail Network including the Hot Metal
Bridge |
750,000 |
| TX |
150 |
Texas |
Construct
passing lanes on Texas State Highway 16 in Atascosa County |
797,000 |
| TX |
151 |
Texas |
Construct
street and drainage improvements to road system in Encinal |
250,000 |
| MN |
152 |
Minnesota |
Environmental assessment and right of way acquisition atUS52
and CSAH24 Interchange, Cannon Falls, Goodhu |
2,000,000 |
| NY |
153 |
New York |
Construction
for Peace Bridge Redevelopment Project, Buffalo |
10,000,000 |
| MN |
154 |
Minnesota |
Construct
recreational visitor center on the Mesabi Trail, City of Virginia |
1,300,000 |
| NE |
155 |
Nebraska |
Engineering,
right-of-way and construction of the 23rd Street Viaduct in Fremont, Nebraska
|
400,000 |
| MN |
156 |
Minnesota |
Phase
III of Devil Track Road Project, Cook County |
1,200,000 |
| ME |
157 |
Maine |
Relocation
of southbound on-ramp to 1-95 at exit 184,Bangor |
1,500,000 |
| MA |
158 |
Massachusetts |
Construct
access roads to Hospital Hill project in Northampton, MA |
2,000,000 |
| IN |
159 |
Indiana |
Construct
interchange for 146th St. and 1-69, Hamilton County, Indiana |
3,000,000 |
| NY |
160 |
New York |
Design
& Construct a Bicycle and Pedestrian Walkway along the Decommissioned
Putnam Rail Line |
950,000 |
| AK |
161 |
Alaska |
False
Pass Road construction from small boat harbor dock to airport and town |
3,000,000 |
| IL |
162 |
Illinois |
Improve
North illinois St and related roads, Belleville |
6,500,000 |
| AR |
163 |
Arkansas |
Construction
of 1-49, Highway 71: Arkansas portion of Bella Vista Bypass |
9,000,000 |
| NM |
164 |
New Mexico |
Coors-I-40
Interchange Reconstruction, Albuquerque |
7,000,000 |
| GA |
165 |
Georgia |
Extend
the south Toccoa Bypass east of Toccoa to CR 311, four lanes for
approximately 5.7 miles on new location |
2,900,000 |
| TX |
166 |
Texas |
Construct
SH 183 from SH 360 to Belt Line Road in Irving, Texas |
2,000,000 |
| CA |
167 |
California |
Construct
pedestrian, bicycle and ADA accessible boardwalks at the Pismo Beach
Promenade in San Luis Obispo County |
300,000 |
| TX |
168 |
Texas |
SH 44 E of
Alice near SH 359 to US 281, Jim Wells County |
2,000,000 |
| TX |
169 |
Texas |
Corpus
Christ4 TX Corpus Regional Transit Authority for maintenance facility
improvements |
2,000,000 |
| PA |
170 |
Pennsylvania |
For
design, land & ROW acquisition, & construction of a parking facility
and associated activities in the City of WilkesBarre |
1,000,000 |
| TN |
171 |
Tennessee |
Hawkins
County, Tennessee SR-31 reconstruction |
500,000 |
| WI |
172 |
Wisconsin |
Reconstruct
US Highway 41 - STH 67 interchange (Dodge County, Wisconsin) |
650,000 |
| MA |
173 |
Massachusetts |
Reconstruct
Route 24/Route 140 Interchange, replace bridge and ramps, widen and extend
acceleration and deceleration lanes |
14,750,000 |
| OR |
174 |
Oregon |
Study
landslides on US. Hwy. 20 between Cascadia and Santiam Pass to develop
long-term repair strategy |
1,000,000 |
| MS |
175 |
Mississippi |
Upgrade
Alex Gates Road and Walnut Road in Quitman County, and roads in Falcon,
Sledge and Lambert |
1,750,000 |
| IL |
176 |
Illinois |
Upgrades
for Muller Road in the City of Washington, IL |
280,000 |
| AL |
177 |
Alabama |
Construction
of Valleydale Road Flyover, Widening and Improvements |
5,000,000 |
| MS |
178 |
Mississippi |
Upgrade roads in Beauregard (U S. Hwy 51), CrystalSprings, and
Hazelhurst |
1,000,000 |
| NY |
179 |
New York |
Westchester
County, IVYRehabilitation of June Road Town of North Salem |
650,000 |
| CA |
180 |
California |
Implement
streetscape improvements on segments of Laurel Canyon Blvd. and Victory Blvd.
in North Hollywood |
1,200,000 |
| OH |
181 |
Ohio |
Construct
loop road along US 23 in City of Fostoria, Seneca County |
7,700,000 |
| PA |
182 |
Pennsylvania |
Design,
engineering, ROWacquisition, & construction of street improvements,
parking, safety enhancements & roadway redesign
in Nanticoke |
2,000,000 |
| LA |
183 |
Louisiana |
improve
Ralph Darden Memorial Parkway Between LA182 and Martin Luther King Road, St.
Mary Parish |
350,000 |
| CA |
184 |
California |
Reconstruct
segments ofHollister Avenue between San Antonio Road and State Route 154 in
Santa Barbara County |
2,500,000 |
| NY |
185 |
New York |
Reconstruction
ofSchenckAvenuefrom Jamaica Avenue to Flatlands Avenue, Brooklyn |
5,000,000 |
| CO |
186 |
Colorado |
Construct
Wadsworth Interchange over US 36 in Broomfield |
2,000,000 |
| NY |
187 |
New York |
Enhance
Battery Park Bikeway Perimeter, New York City |
2,000,000 |
| FL |
188 |
Florida |
1-95
Interchange in the City ofBoca Raton |
14,250,000 |
| NJ |
189 |
New Jersey |
Construct Long Valley
Bypass |
1,000,000 |
| MI |
190 |
Michigan |
Alpena
County, Resurface 3.51 miles of Hamilton and Wessel Roads |
640,000 |
| CA |
191 |
California |
Construct a 2.8 mile bikeway along Lambert Roadfrom Mills Ave.
to Valley Home Ave. in the City of Whittier |
2,500,000 |
| TX |
192 |
Texas |
Hidalgo County Loop |
1,000,000 |
| ME |
193 |
Maine |
Improvements
to Route 108 to enhance access to business park, Rumford |
1,500,000 |
| NY |
194 |
New York |
Installation
of new turning lane from Mohansic Ave onto eastbound Route 202, &
addition of new striped crosswalk |
375,000 |
| NY |
195 |
New York |
Rockland
County Hudson River Greenway Trail Project construction |
2,000,000 |
| TX |
196 |
Texas |
Construct
a segment of FM 110 in San Marcos |
1,000,000 |
| TX |
197 |
Texas |
Big
Spring, TX Construction of the Big Spring Reliever Route |
2,800,000 |
| NY |
198 |
New York |
Improvements
to Intennodal Transportation Facility and Construction of Waterfront
Esplanade at Fort Totten |
2,800,000 |
| PA |
199 |
Pennsylvania |
Reconstruction
and repair of Haverford Ave. Between 68th St. and Lansdowne Ave |
300,000 |
| ND |
200 |
North Dakota |
Bismarck/Mandan
Liberty Memorial Bridge over the Missouri River |
30,000,000 |
| WI |
201 |
Wisconsin |
City of Glendale, WI Develop and rehabilitate exit ramps on
I43 |
3,000,000 |
| TX |
202 |
Texas |
Construction
of Lake Ridge and US67 Project, Cedar Hill, TX |
3,000,000 |
| NY |
203 |
New York |
Install Improvements for Pedestrian Safety in the vicinity of
PS277 |
250,000 |
| WI |
204 |
Wisconsin |
Resurface
USH 8 between CTH C and Monico |
1,100,000 |
| PA |
205 |
Pennsylvania |
South
Phila. Access Rd. Design and construction ofport access road from South Phila
Port and intermodal facilities, Philadelphia |
3,000,000 |
| NY |
206 |
New York |
Implement
ITS system and apparatus to enhance citywide truck route system on Broadway
to Irwin Ave between 232 to 231 in the
neighborhood ofKingsbridge, NY |
100,000 |
| PA |
207 |
Pennsylvania |
SR
219 Purchase of Right of Way and completion offour lane extension from the
Town of Somerset to the Maryland border |
15,000,000 |
| WI |
208 |
Wisconsin |
Expand
USH 41 between Oconto and Peshtigo, Wisconsin (Oconto and Marinette Counties,
Wisconsin) |
2,000,000 |
| IA |
209 |
Iowa |
Study for NE Beltway,
Polk Co |
500,000 |
| NY |
210 |
New York |
This
project involves afull reconstruction of all the streets in Long Island City
surrounding 11th Street |
3,400,000 |
| AZ |
211 |
Arizona |
Upgrade
and Widen SR85 to I-JO (Mileposts 120 - 141) |
1,500,000 |
| MS |
212 |
Mississippi |
Upgrade
Dog Pen Road and Galilee Road in Holmes County, and roads in Cruger, Pickens,
and Goodman |
1,000,000 |
| GA |
213 |
Georgia |
US.
19/SR92 median workfrom Ellis RD to West Taylor ST, Griffin |
1,500,000 |
| MS |
214 |
Mississippi |
Upgrade
roads at Coahoma Community College, and roads in Coahoma and Jonestown,
Coahoma County |
1,500,000 |
| IN |
215 |
Indiana |
Construction
of Dixon Roadfrom Markiand Avenue to Judson Road in Kokomo, Indiana |
500,000 |
| CA |
216 |
California |
Construction
of Cross Valley Connector between 1-5 and SR 14 |
4,000,000 |
| MA |
217 |
Massachusetts |
State
Street Corridor Redevelopment Project includes street resurfacing, pedestrian
walkway improvements and ornate lighting from Main
Street to St. Michael’s Cemetery, Springfield |
6,000,000 |
| MI |
218 |
Michigan |
Resurfacing of Stephenson Highway in Madison Heights |
350,000 |
| CA |
219 |
California |
Soundwall construction on the 210 Freeway, Pasadena |
1,800,000 |
| GA |
220 |
Georgia |
Streetscape-Ashburn |
250,000 |
| NY |
221 |
New York |
Design,
Study and Construct Ferry Terminal Facilities at Floyd Bennett Field |
1,000,000 |
| WI |
222 |
Wisconsin |
Improve
Superior Avenue: Interstate 43 to State Highway 32, Sheboygan County,
Wisconsin |
1,000,000 |
| TX |
223 |
Texas |
Design
and construction streetscape improvements to enhance pedestrian access,
pedestrian access to bus services and facilities |
1,000,000 |
| IL |
224 |
Illinois |
Upgrade roads,
The Village of Berkeley |
1,000,000 |
| GA |
225 |
Georgia |
Upgrade
sidewalks and lighting, Wrightsville |
400,000 |
| PA |
226 |
Pennsylvania |
Upgrades
to Bedford Route 220 at the entrance of the Bedford Business Park to Beldon
Ridge intersection |
2,100,000 |
| MI |
227 |
Michigan |
Widen
Baldwin Road from Morgan to Waldon in Orion Township |
4,000,000 |
| FL |
228 |
Florida |
Construct
Saxon Boulevard Extension, Volusia County, Florida |
2,100,000 |
| NY |
229 |
New York |
Construction
and rehabilitation of East and West Gates Avenues in the Village
ofLindenhurst, NY |
930,000 |
| TN |
230 |
Tennessee |
Widen
Interstate 240 from Interstate 55 to Interstate 40 West of Memphis, Shelby
County |
1,000,000 |
| NJ |
231 |
New Jersey |
Rahway
River Corridor Greenway Bicycle and Pedestrian Path, South Orange |
500,000 |
| CT |
232 |
Connecticut |
Reconstruct
Pearl Harbor Memorial Bridge, New Haven |
2,000,000 |
| PA |
233 |
Pennsylvania |
Development
of Northwest Lancaster County River Trail |
250,000 |
| CA |
234 |
California |
Widen SR89
at existing “mousehole” two lane RR underpass |
3,000,000 |
| LA |
235 |
Louisiana |
Construct
Mississippi River Trail and Bikepath, New Orleans |
500,000 |
| NY |
236 |
New York |
Utica
Marsh-Reestablish Water Street |
2,650,000 |
| AR |
237 |
Arkansas |
Widen
to 5 lanes, improvement, and other development to US. Highway 79B/Univeristy
Ave. in Pine Bluff |
3,200,000 |
| WA |
238 |
Washington |
SR
9 & 20th St. SE Intersection Reconstruction in Snohomish County |
1,000,000 |
| OH |
239 |
Ohio |
Streetscape
and related safety improvements to US 20 in Painesville Township, OH |
350,000 |
| PA |
240 |
Pennsylvania |
Design,
construct intersection and other upgrades on PA 24 and 124 in York County, PA
|
1,000,000 |
| WA |
241 |
Washington |
Issaquah
Historical Society, Issaquah Valley Trolley Project |
250,000 |
| IL |
242 |
Illinois |
Construct
new bridge on Illinois Prairie Path over East Branch River in Milton
Township, IL |
300,000 |
| TN |
243 |
Tennessee |
Plan and
construct improvements, Livingston public square |
50,000 |
| GA |
244 |
Georgia |
Construction
on US 82 from Dawson to Alabama Line |
1,000,000 |
| IA |
245 |
Iowa |
Construct 1-74
Bridge in Bettendorf IA |
1,500,000 |
| CA |
246 |
California |
Operations
and management improvements, including ITS technologies, on US. Highway 101
in Santa Barbara County |
1,000,000 |
| OH |
247 |
Ohio |
Plan
and construct new interchange on Interstate 71 at Big Walnut Road in Delaware
Countj Ohio |
5,000,000 |
| PA |
248 |
Pennsylvania |
Design
and construct access to intermodal facility in York County |
2,000,000 |
| WA |
249 |
Washington |
Complete
preliminary engineering and environmental analysis for SRJ4 through C’amas
and Washougal |
1,000,000 |
| UT |
250 |
Utah |
Construct
Bingham Junction Boulevard in Midvale City |
5,000,000 |
| MD |
251 |
Maryland |
Construct
Centreville, MD spur of Queen Annes County Cross Island Trail, Centreville to
US Route 301 |
382,000 |
| MN |
252 |
Minnesota |
Polk,
Pennington, Marshall County 10-Ton Corridor in Northwestern Minnesota |
5,600,000 |
| CA |
253 |
California |
Quincy-Oroville
Highway Rehabilitation in Plumas County |
1,000,000 |
| CA |
254 |
California |
Construct
Coyote Creek Trail Project from Story Road to Montague Expressway in San Jose
|
2,000,000 |
| TX |
255 |
Texas |
Construct
Depression of Belt Line Road at I-35E Intermodal Transportation Project in
arrollton, 7 |
6,000,000 |
| AL |
256 |
Alabama |
Construct
Anniston Eastern Bypass from Golden Springs Road to US Hwy 431 |
12,500,000 |
| NY |
257 |
New York |
Construct transportation enhancements on greenway along East
River waterfront between East River Park (ERP) and Brooklyn Bridge, and reconstruct South entrance to ERP, in Manhattan |
1,250,000 |
| NE |
258 |
Nebraska |
Construction
of 1-80-Cherry Avenue Interchange and East Bypass, Kearney, Nebraska |
8,000,000 |
| MN |
259 |
Minnesota |
Design,
engineering, ROW acquisition and construction for the French Rapids Bridge,
City ofBrainerd |
1,000,000 |
| CA |
260 |
California |
Escondido Construction of Bear Valley Pkwy, East Valley Pkwy |
2,000,000 |
| AR |
261 |
Arkansas |
Junction
Bridge — rehabilitation & conversion from rail to pedestrian use |
800,000 |
| WA |
262 |
Washington |
Port
of Tacoma Rd. — Construct a second left turn lane for traffic from westbound
Pac. Hwy E. to Port of Tacoma Rd. and I-S |
500,000 |
| NY |
263 |
New York |
Realign
Union Valley Road in Town of Carmel |
330,000 |
| MO |
264 |
Missouri |
Roadway
improvements to US. 67 in St. Francois County |
2,000,000 |
| FL |
265 |
Florida |
Homestead,
FL Widening ofSW328from SWI37Ave to 152 Ave |
7,000,000 |
| CA |
266 |
California |
Reconstruct
1-710 southern terminus off ramps, Long Beach |
1,000,000 |
| GA |
267 |
Georgia |
SR
4 widen from Milledgeville Road to Government Street, Richmond County |
4,000,000 |
| TN |
268 |
Tennessee |
Develop trails, bike paths and recreationalfacilities
onWestern Slope of Black Mountain, Cumberland County |
250,000 |
| NJ |
269 |
New Jersey |
Routes
1 & 9 Secaucus Road to Broad Avenue in Hudson and Bergen Counties |
1,000,000 |
| MA |
270 |
Massachusetts |
Massachusetts
Avenue Reconstruction, Boston |
5,000,000 |
| NY |
271 |
New York |
Improve
Ashburton Ave. from the Saw Mill River Parkway to the wateifront, Yonkers |
1,500,000 |
| MN |
272 |
Minnesota |
Trail
extensions to Mesabi Trail, City ofAurora |
294,745 |
| LA |
273 |
Louisiana |
I-JO Ryan Street exit ramp to include relocation and
realignment of Lakeshore Drive to include portions of Front |
5,000,000 |
| MI |
274 |
Michigan |
Van
Buren, Belleville Road widen to 5 lanes between Tyler and Ecorse |
1,100,000 |
| IA |
275 |
Iowa |
Widening University
Blvd, aive |
1,000,000 |
| HI |
276 |
Hawaii |
Construct Waimea Bypass |
1,000,000 |
| IL |
277 |
Illinois |
Widening
two blocks of Poplar St from Park Ave to 13th Street, Williamson County |
480,000 |
| CA |
278 |
California |
Widening
the highway and reconstructing off ramps on Hwy 101 between Steele Lane and
Windsor, CA to reduce traffic and promote carpools
|
5,000,000 |
| WA |
279 |
Washington |
Granite
Falls Alternate Freight Route in Granite Falls |
2,930,000 |
| NY |
280 |
New York |
Construction
and rehabilitation ofNorth Queens Avenue and Grand Avenue in the Village of
Lindenhurst, NY |
680,000 |
| SC |
281 |
South Carolina |
Extension
& Expansion of Lower Richland Roads Phase I |
1,000,000 |
| OR |
282 |
Oregon |
Kuebler
Boulevard improvements, Salem |
1,500,000 |
| NC |
283 |
North Carolina |
Upgrade US I in Rockingham
|
10,000,000 |
| CA |
284 |
California |
Implement
Southwest San Fernando Valley Road and Safety Improvements |
2,300,000 |
| VA |
285 |
Virginia |
Upgrade
DOT crossing #467662S to constant warning time devices |
201,800 |
| TX |
286 |
Texas |
Construct new location highway & interchanges on Inner
Loop, from Global Reach to Loop 375 including the GlobalReach, El Paso |
16,000,000 |
| CA |
287 |
California |
Rehabilitation,
repair, and/or reconstruction of deficient two- lane roads that connect to
Interstate 5, SR 180, SR 41 and SR 99 countywide,
Fresno County |
3,500,000 |
| OH |
288 |
Ohio |
Relocate
SR 149 from 26th Street to Trough Run in Bellaire |
650,000 |
| WA |
289 |
Washington |
Auburn,
Washington - lvi Street SE rehabilitation between 29th Street SE and 37th
Street SE |
500,000 |
| KY |
290 |
Kentucky |
Replace
Bridge over Stoner Creek, 2 Miles East of US 27 Junction, Bourbon County |
1,000,000 |
| NM |
291 |
New Mexico |
Development
of Paseo del Volcan corridor located in Sandoval County from Iris Road to US.
Highway 550 |
2,000,000 |
| OH |
292 |
Ohio |
Stan
Hywet Hall and Gardens to restore, expand, construct, and improve pedestrian
paths and bike trail system |
180,000 |
| MS |
293 |
Mississippi |
Construct bi cycle
path, Petal |
200,000 |
| NJ |
294 |
New Jersey |
Construction
of Route 206 Chester Township, NJ |
1,000,000 |
| IL |
295 |
Illinois |
For
IDOT to conduct Phase II engineering for reconstruction of 159th St-US 6-IL 7
in Will and Cook Counties |
1,000,000 |
| IL |
296 |
Illinois |
For Will County to begin Phase II engineering and |
2,000,000 |
| CA |
297 |
California |
Study
of Thomas Bridge to meet future cargo and passenger traffic needs of the
ports ofLong Beach and Los Angeles |
2,000,000 |
| TX |
298 |
Texas |
US377
Hood Co., IX—From BU377H east of Granbuiy to the new location of FM 4 |
1,500,000 |
| IL |
299 |
Illinois |
Construct
Citywide bicycle path network, city of Evanston |
250,000 |
| CA |
300 |
California |
Mount
Vernon Avenue grade separation and bridge expansion in Colton |
2,000,000 |
| NJ |
301 |
New Jersey |
Widening
Routes 1 and 9, Production Way to East Lincoln Avenue, Union County |
500,000 |
| PA |
302 |
Pennsylvania |
Design,
construct and upgrade interchange of US 15 and US 30 in Adams County |
4,000,000 |
| OH |
303 |
Ohio |
State
Route 8 Improvements in Northern Summit County |
3,000,000 |
| CO |
304 |
Colorado |
US 50 East, State
Line to Pueblo |
7,500,000 |
| IN |
305 |
Indiana |
Widening
road (along Gordon Road, Sixth Street, and West Shafer Drive) to 3-lane
street, with sidewalk and improvements to existing
bridge - White County/Monticello, Indiana |
10,000,000 |
| OH |
306 |
Ohio |
Widening
Pleasant Valley Bagley Road (Rte 27), Parma and Middleburg Heights |
1,000,000 |
| MA |
307 |
Massachusetts |
Rehabilitation
of 1-95 Whittier Bridge — Amesbuiy and Newbuiyport |
2,000,000 |
| CA |
308 |
California |
Streetscape
improvements at East 14th St-Mission Blvd in Alameda County |
750,000 |
| NY |
309 |
New York |
Construct
W. 79th St Rotunda, New York City |
2,000,000 |
| TX |
310 |
Texas |
Acquire
Kelly Parkway Corridor Right-of-way through San Antonio |
2,000,000 |
| NC |
311 |
North Carolina |
Construct
new route from US 17 to US 421 in Brunswick and New Hanover Counties |
1,000,000 |
| PA |
312 |
Pennsylvania |
Construct
safety and capacity improvements to Route 309 and Old Packho use Road |
250,000 |
| OR |
313 |
Oregon |
Delta Ponds
Bike/Pedestrian Path |
2,880,000 |
| FL |
314 |
Florida |
Hollywood
US Route 1 Young Circle Safety Improvement |
2,300,000 |
| MI |
315 |
Michigan |
Houghton
County, Gravel and paving of remaining 3.2 miles in 5.5 mile stretch
ofJacobsvile Rd |
430,000 |
| PA |
316 |
Pennsylvania |
Improve
access to Airport Connectorfrom PA 283 to the terminus of the Airport
Connector at State Route 230 and adjacent access
roads |
500,000 |
| CA |
317 |
California |
Construct one additional all purpose lane in each direction on
1405 and provide additional capital improvements from SR73 through the LA County line |
1,210,000 |
| IL |
318 |
Illinois |
Imp rove
Roads and Bridges, Cook County |
4,000,000 |
| CA |
319 |
California |
Improve
traffic safety, including streetlights, from Queen to Barclay to Los Angeles
River to Riverside in Elysian Valley, Los Angeles |
1,400,000 |
| MI |
320 |
Michigan |
Construction
and improvements to Western Avenue and associated streets betweeen Third
Street and Terrace Street in Muskegon |
2,300,000 |
| IL |
321 |
Illinois |
Construct
Reed Station Parkway Extension to IL Rt 3, Carbondale |
2,000,000 |
| AL |
322 |
Alabama |
Construction
of Patton Island Bridge Corridor |
10,000,000 |
| MI |
323 |
Michigan |
Highland,
Clyde Roadfrom Hickoiy Ridge to Strathcona |
125,000 |
| Ml |
324 |
Michigan |
Alger
County, Repaving a portion of H-58 between Sullivan Creek towards Little
Beaver Road |
1,600,900 |
| TX |
325 |
Texas |
Improvements
to US 183 in Gonzales County |
500,000 |
| CA |
326 |
California |
Construct
a raised landscaped median on Alondra Blvd between Clark Ave and WoodruffAve
in Beliflower |
400,000 |
| MN |
327 |
Minnesota |
Right
of way acquisition for TH23 Paynesville Bypass |
2,500,000 |
| FL |
328 |
Florida |
Construct
interchange improvements at 1-75 and University Parkway |
500,000 |
| CO |
329 |
Colorado |
For
construction and architectural improvements of Wadsworth Bypass
(SHI2J)Burlington Northern Railroad and Grandview
Grade Separation |
4,000,000 |
| KS |
330 |
Kansas |
Construction
of 4-lane improvement on K-18 in Riley County, Kansas |
2,000,000 |
| NJ |
331 |
New Jersey |
Replace
Rocka way Road Bridge, Randolph Tonwhsip, New Jersey |
1,000,000 |
| FL |
332 |
Florida |
Construction
ofpaved road over existing unpaved roadway on SE 144th Ave from SR 100 to US
301, distance of 1.2 miles |
3,000,000 |
| FL |
333 |
Florida |
Construct
1-4 Frontage Rd. Volusia County, Florida |
2,000,000 |
| MD |
334 |
Maryland |
Construction
of Fringe and Corridor Parking Facility at intersection of Clinton Street and
Keith Avenue in Baltimore |
4,000,000 |
| OH |
335 |
Ohio |
Purchase
of Right of Way for transportation enhancement activities in Bainbridge
Township, OH |
1,440,000 |
| NJ |
336 |
New Jersey |
Rowan
Boulevard Parking adjacent to Highway 322 Corridor in Glassboro Township |
1,000,556 |
| CA |
337 |
California |
Construct
interchange on US 50 at Empire Ranch Road in Folsom |
1,800,000 |
| FL |
338 |
Florida |
Bicycle
and Pedestrian Improvements in the Town of Windermere, Florida |
300,000 |
| TN |
339 |
Tennessee |
Plan and
construct a bicycle and pedestrian trail, Smyrna |
3,000,000 |
| CA |
340 |
California |
Santa Anita Avenue Corridor Imp rovement project, Arcadia |
3,000,000 |
| AS |
341 |
American Samoa |
Shoreline
protection and drainage mitigation for Nuuuli village roads |
1,000,000 |
| PA |
342 |
Pennsylvania |
Design,
engineering, ROWacquisition, & construction of a connector road between
Pennsylvania Rt. 93 & Pennsylvania Rt. 309 in
Hazie Township |
600,000 |
| GA |
343 |
Georgia |
South
Tfton Bypass from US 82/SR 520 west to US 319/SR 35 east, Tft County |
500,000 |
| NJ |
344 |
New Jersey |
Streetscape
and Traffic Improvement Project to Downtown West Orange |
1,000,000 |
| NJ |
345 |
New Jersey |
Bergen
County, NJ -On Route 17, address congestion, safety, drainage, maintenance,
signing, access, pedestrian circulation and
transit access |
4,500,000 |
| CA |
346 |
California |
Road
widening, construct bike path, lighting, and safety improvements on road
leading to Hansen Dam Recreation Area, Los Angeles
|
6,500,000 |
| TX |
347 |
Texas |
Construct
additional 2 lanes to Loop 335 in Amarillo from .3 miles West of Western
street to .5 miles West of Broadway |
2,000,000 |
| NY |
348 |
New York |
Reconstruct
a historic bridge crossing Maxwell Creek in the Town of Sodus, NY |
580,000 |
| NJ |
349 |
New Jersey |
Safety
and operation improvements on Route 73 in Berlin, Voorhees and Eves ham |
1,200,000 |
| NJ |
350 |
New Jersey |
Study
and preliminaiy engineering designs for a boulevard on State Route 440 and
US. Highway Route 1 & 9, Jersey City |
1,000,000 |
| VA |
351 |
Virginia |
Construction
of Route 17-Dominion Boulevard, Chesapeake, VA |
6,000,000 |
| LA |
352 |
Louisiana |
Installation
ofproper lighting standards to illuminate inbound and outbound ramps of 110
and portions of HWY 95 |
200,000 |
| IN |
353 |
Indiana |
Cyntheanne
Rd. Interchange and Corridor Improvements, Town of Fishers, Indiana |
500,000 |
| ME |
354 |
Maine |
Plan
and construct North-South Aroostook highways, to improve access to St. John
Valley, including Presque Isle Bypass and other
improvements |
4,000,000 |
| TN |
355 |
Tennessee |
Plan and
construct a bicycle and pedestrian trail, LaVergne |
1,500,000 |
| TX |
356 |
Texas |
Build
Arkansas Street Grade Separation in Laredo |
1,000,000 |
| CA |
357 |
California |
Construct
new left turn lane at State Route 19 and Teistar in El Monte |
700,000 |
| NY |
358 |
New York |
Meadow
Drive Extension - North Tonawanda, New York |
2,000,000 |
| CA |
359 |
California |
Reconstruct
1-880 & Coleman Avenue Interchange & implement other 1-880 Corridor
operational improvements in Santa Clara County |
8,000,000 |
| OR |
360 |
Oregon |
Improve
Millican, West Butte Road which connects US. Highway 20 with US. Highway 126 |
2,000,000 |
| VA |
361 |
Virginia |
Metropolitan
Washington, D.C. Regional Transportation Coordination Program |
2,000,000 |
| NY |
362 |
New York |
Brooks
Landing Transportation Improvements and Enhancement project, Rochester |
500,000 |
| NJ |
363 |
New Jersey |
Construct
CR 538 Colas Mill Road Bridge over Scotland Run, Gloucester County |
500,000 |
| TX |
364 |
Texas |
Convert
discontinuous two-way frontage roads to continuous one-way frontage roads on
IH 30 in Texarkana, TX |
5,000,000 |
| TX |
365 |
Texas |
Regional
.bi cycle routes on existing highways in Austin, TX |
1,000,000 |
| IN |
366 |
Indiana |
Construct
Interchange at 1-65 and 109th Avenue, Crown Point |
7,454,219 |
| GA |
367 |
Georgia |
Intersection
improvement at Harris Drive at SR 42 |
600,000 |
| IL |
368 |
Illinois |
Engineering
and construction of the East Branch DuPage River Greenway Trail in central
DuPage County, IL |
100,000 |
| NY |
369 |
New York |
Rehabilitate
a historic transporation-related warehouse on the Erie Canal in the Town of
Lyons, NY |
600,000 |
| NY |
370 |
New York |
Relocating
Miller Highway W 59th- 72 St. Manhattan under {uture expansion of Riverside
Park; demolishing existing elevated road over park
|
2,500,000 |
| MI |
371 |
Michigan |
Allen
Road under the CN.Railroad Grade Separation, Woodhaven |
4,450,000 |
| PA |
372 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking & roadway redesign in Larks yule Borough, Luzerne County |
200,000 |
| AR |
373 |
Arkansas |
Northeast
Arkansas Connector (relocation of Highway 226) |
3,000,000 |
| NJ |
374 |
New Jersey |
Reconstruct
Route 168 from Route 41 to 6th Avenue in Runnemede |
658,000 |
| NY |
375 |
New York |
Renovation
of Metropolitian Avenue center islands |
1,700,000 |
| PA |
376 |
Pennsylvania |
Rt
60 Millennium Park Interchange, construct new interchange on Rt 60 to provide
access to new Lawrence County Industrial Park |
800,000 |
| AR |
377 |
Arkansas |
Bentonville,
Arkansas - widen Arkansas Highway 102 between US. 71B and the west city
limits |
1,500,000 |
| PA |
378 |
Pennsylvania |
Purchase
of right-of-way, utilities and construction for Northern Access to Altoona
from Interstate 99, Blair County, PA |
3,000,000 |
| CA |
379 |
California |
Construct
Class I bike and pedestrian path from San Luis Obispo to Avila Beach |
400,000 |
| MN |
380 |
Minnesota |
Reconstruct
CSAH 61 from south county line to TH 73, Moose |
316,000 |
| AZ |
381 |
Arizona |
Improving
Lone Pine Dam Road in Navajo County |
1,500,000 |
| MI |
382 |
Michigan |
Construct
Road Improvements to North Henry St. from Vermont Ave. to Wilder Rd. Bay City
|
2,700,000 |
| TX |
383 |
Texas |
Reconstruct
I-35E Trinity River Bridge, Dallas |
15,000,000 |
| NY |
384 |
New York |
Town
of Greenville rehabilitation of Grahamtown Rd. & Burnt Corners Rd |
125,000 |
| NJ |
385 |
New Jersey |
Completion
of Hudson River Waterfront Walkway through Stevens Institute of Technology in
Hoboken |
1,000,000 |
| NC |
386 |
North Carolina |
Construct US 74
Bypass, Shelby, NC |
3,000,000 |
| WA |
387 |
Washington |
Tukwila
Urban Access Improvement Project — address necessary improvements to
Southcenter Parkway in Tukwila to relieve
congestion |
1,000,000 |
| CA |
388 |
California |
Construction
of a traffic signal at the intersection of Independence Avenue and Sherman
Way |
125,000 |
| NH |
389 |
New Hampshire |
Design
and construction of intersection of Rte lOlA and Rte 13 inMilford |
1,000,000 |
| NJ |
390 |
New Jersey |
Construct
Rte 30 - Pomona Road Intersection Improvements, Atlantic County |
5,000,000 |
| CA |
391 |
California |
I-1O and Indian Ave Interchange, Palm Springs |
2,750,000 |
| NY |
392 |
New York |
Reconstruction
of street, sidewalks and curbs outside of Museum of Modern Art (MOMA) |
500,000 |
| KY |
393 |
Kentucky |
Right
of way for and construction of Pennyrile Parkway Extension from 41A S. to
1-24 |
3,200,000 |
| TN |
394 |
Tennessee |
Sevier
County, Tennessee SR-66 widening |
1,750,000 |
| TN |
395 |
Tennessee |
Plan
and construct interchange improvements, 1-65 at Highland Road |
400,000 |
| IA |
396 |
Iowa |
Reconstruction
ofNWMadrid Dr, Polk Co |
500,000 |
| NH |
397 |
New Hampshire |
Relocation
and Reconstruction of intersection at Route 103 and North Street in Claremont
|
1,300,000 |
| IL |
398 |
Illinois |
To
construct a new 2-lane road extending 1650 feet north rom intersection with
University Park Drive, Edwardsville |
500,000 |
| NY |
399 |
New York |
Town of
Highlands reconstruction of bridge on School Street |
225,000 |
| AK |
400 |
Alaska |
Unalaska, AK Construction ofAMI-fWferry terminal including
approach, staging, and upland improvements |
7,500,000 |
| PA |
401 |
Pennsylvania |
Design and construct interchange and related improvements to
183 Exit 4 |
3,500,000 |
| OR |
402 |
Oregon |
U.S. 101 Improvements,
Bandon |
3,300,000 |
| MI |
403 |
Michigan |
Northwestern
Highway Extension projects in Oakland County |
5,000,000 |
| PA |
404 |
Pennsylvania |
PA
Route 61 safety improvements, Leesport Borough and Ontelaunee and Muhlenburg
Townships |
2,468,300 |
| OH |
405 |
Ohio |
Imp
rove Rt 62 (Main and Town Streets) Bridges over Scioto River, Columbus |
3,000,000 |
| AK |
406 |
Alaska |
Planning,
design, and construction of a bridge joining the Island of Gravina to the
Community of Ketchikan |
3,000,000 |
| MN |
407 |
Minnesota |
U.S. Trunk
Highway 14fl-om Waseca to Owatonna, Minnesota |
12,000,000 |
| TX |
408 |
Texas |
Construct
Mission Trails Project Packages 4 & 5 in San Antonio |
5,500,000 |
| MS |
409 |
Mississippi |
Upgrade Roads
in Carthage, Leake County |
200,000 |
| MI |
410 |
Michigan |
Construct access road at intersection of Doerr Road and |
26,000 |
| MS |
411 |
Mississippi |
Upgrade
roads in Humphreys County Districts 1 and 5 and Isola |
850,000 |
| IN |
412 |
Indiana |
126th
Street Project, Town of Fishers, Indiana |
1,250,000 |
| HI |
413 |
Hawaii |
Construct Puanaiko Street |
1,000,000 |
| AZ |
414 |
Arizona |
Burro
Creek section between Wikieup and the Santa Maria River |
1,000,000 |
| PA |
415 |
Pennsylvania |
Conduct
Environmental Impact Statement study for Parkway West corridor |
1,000,000 |
| SC |
416 |
South Carolina |
Build
Railroad Avenue Extension in Berkeley County, SC - SCDOT |
2,000,000 |
| MD |
417 |
Maryland |
Construct
a visitors center and related roads serving Ft. McHeniy |
4,700,000 |
| OH |
418 |
Ohio |
Construction
of Gracemont Street Exchange Interstate 77- Bethlehem Township and Pike
Township, Ohio |
3,000,000 |
| MI |
419 |
Michigan |
Design,
Right-of-Way and Construction of the 1-196 Chicago Drive (Baldwin Street)
Interchange ModfIcaiton, Michigan |
21,400,000 |
| CA |
420 |
California |
Folsom Blvd. Transportation Enhancements, City of Rancho
Cordova |
7,000,000 |
| TN |
421 |
Tennessee |
improve streetscape and pavement repair, Monroe County, |
300,000 |
| TX |
422 |
Texas |
IH37frontage roads in
Mathis |
2,000,000 |
| WV |
423 |
West Virginia |
Construct New River
Parkway |
4,500,000 |
| NY |
424 |
New York |
Construct
sidewalk and improvements on Broathvay in the Town of Cortlandt |
330,000 |
| PA |
425 |
Pennsylvania |
Erie,
PA Powell Avenue Bridge Replacement, Asbuiy Road Improvement Project |
3,000,000 |
| VA |
426 |
Virginia |
Liberty
Street Construction in Martinsville, Virginia |
1,000,000 |
| CA |
427 |
California |
Implement streetscape project on Central Avenue from 103rd
Street to Watts/103rd Street Station, Watts. |
3,000,000 |
| MA |
428 |
Massachusetts |
Realignments
and reconstruction of a section ofRoute 32 in Palmer to the Ware town line |
3,200,000 |
| CA |
429 |
California |
Seismic retrofit of the Golden Gate Bridge |
10,000,000 |
| CA |
430 |
California |
Upgrade
and extend Commerce Avenue, City of Concord |
1,750,000 |
| MA |
431 |
Massachusetts |
Somerville Roadway
Improvements |
2,000,000 |
| LA |
432 |
Louisiana |
Replace
Almonaster Bridge, New Orleans |
500,000 |
| IN |
433 |
Indiana |
Upgrade
Traffic Signals Phase III in the City of Muncie, Indiana |
640,000 |
| FL |
434 |
Florida |
Shapes
Ferry Bridge replacement in Marion County |
800,000 |
| IA |
435 |
Iowa |
US
34 Missouri River bridge relocation and replacement |
2,500,000 |
| NY |
436 |
New York |
Village
of Hi ghland Falls repaving and sidewalk construction of Oak Avenue |
150,000 |
| MN |
437 |
Minnesota |
Interchange
Reconstruction at CSAH4 and US] 69 |
1,000,000 |
| IL |
438 |
Illinois |
Development
and construction of an interchange at Brisbin Rd and Interstate 80 |
6,000,000 |
| NE |
439 |
Nebraska |
Design,
right-of-way and construction of rail-grade separations throughout Nebraska
as identified by Nebraska Dept. of Roads |
15,000,000 |
| MO |
440 |
Missouri |
Redesign
& Reconstruction of the 1-270 Dorsett Road Interchange Complex in the
City of Maryland Heights |
2,000,000 |
| SC |
441 |
South Carolina |
Build
Berlin Myers Extension in Summerville, SC |
8,000,000 |
| IN |
442 |
Indiana |
Improve 100 South,
Porter County |
1,000,000 |
| NY |
443 |
New York |
Improve
safety measures at the railroad grade crossings on the West Short River Line,
Rocidand County |
1,600,000 |
| NJ |
444 |
New Jersey |
Street
Improvements and Traffic Signal Replacement in Union City Central Business
District |
800,000 |
| GA |
445 |
Georgia |
Streetscape
project to replace sidewalks in downtown Forsyth |
300,000 |
| AK |
446 |
Alaska |
Westside
development Williamsport-Pile Bay Road |
5,000,000 |
| NV |
447 |
Nevada |
Construct
Interstate 15— Las Vegas Beltway Interchange |
9,000,000 |
| NY |
448 |
New York |
Palisades
Trailway Phase 2— Rockland County, New York |
200,000 |
| PA |
449 |
Pennsylvania |
Replace a Highway Rail Grade crossing in Jeanette |
500,000 |
| CA |
450 |
California |
Conduct project design and environmental analysis of Heritage
Bridge on Heritage Road linking Chula Vista to Otay Mesa |
2,500,000 |
| MA |
451 |
Massachusetts |
Assabet
River National Wildflfe Refuge, MA, Design and Construction ofparking areas |
500,000 |
| NY |
452 |
New York |
Reconstruct
Main Street in the Town of Lewisboro |
90,000 |
| MA |
453 |
Massachusetts |
Study
and analysis of Lowell Wesford St. - Wood St. Rourke Bridge Corridor, Lowell |
600,000 |
| OR |
454 |
Oregon |
Highway 20, Lincoln County
|
7,000,000 |
| MN |
455 |
Minnesota |
Construction
of 8th Street North: Stearns C.R. 120 to T.H. 15 in St. Cloud, MN |
2,000,000 |
| IL |
456 |
Illinois |
Construction
of a pedestrian sidewalk along S. Chicago Street in Geneseo, IL |
145,000 |
| OH |
457 |
Ohio |
Construct
Bike and Walking Path from West 210 St to Metroparks Fairview Park |
450,000 |
| NY |
458 |
New York |
Improve
Bronx River Greenway 180th St Park Link to Bronx Park |
800,000 |
| MN |
459 |
Minnesota |
City of East
Grand Forks Construct 13th St SE Extension |
1,200,000 |
| NY |
460 |
New York |
Improvements
to Clark P1 and Cherry Ln-Rt. 6 and 6N in Putnam County |
370,000 |
| NJ |
461 |
New Jersey |
Construct
Garden State Parkway Grade Separation, Cape May County |
40,000,000 |
| VA |
462 |
Virginia |
High
Knob Horse Trails — construction of horse riding trails and associated
facilities in High Knob area of Jefferson National
Forest |
750,000 |
| TN |
463 |
Tennessee |
Plan
and construct a bicycle and pedestrian trail, Cookeville |
2,500,000 |
| UT |
464 |
Utah |
Provo,
Utah Westside Connector from 1-15 to Provo Municipal Airport |
1,000,000 |
| CA |
465 |
California |
I-S Santa
Clarita-Los Angeles Gateway Improvement Project |
1,500,000 |
| NY |
466 |
New York |
Project
will revitalize staircases used as streets due to steep grade of terrain in
areas in which they are located, the Bronx |
1,000,000 |
| TX |
467 |
Texas |
Construct
and rehabilitate pedestrian walkways along the Main Street Corridor to
improve transit-related accessibility |
1,000,000 |
| MD |
468 |
Maryland |
Reconstruct
East North Avenue (US Route 1) in Baltimore |
3,200,000 |
| CT |
469 |
Connecticut |
Reconstructoin
of Lakeville Center to improve pedestrian and vehicle safety at the
intersection of Routes 41 and 44 |
895,000 |
| NY |
470 |
New York |
Rehabilition
of Bay Ridge 86th Street Subway Station, Brooklyn, NY |
2,000,000 |
| CA |
471 |
California |
San
Gabriel Blvd Rehabilitation Project — Mission Rd to Broadway, San Gabriel |
300,000 |
| NC |
472 |
North Carolina |
To
plan, design, and construct the 10th Street Connector Project in Greenville,
NC |
8,000,000 |
| OH |
473 |
Ohio |
To
widen Western Reserve Roadfrom SR 7 to Hitchcock Road, Mahoning Co |
2,500,000 |
| NY |
474 |
New York |
Binghamton, Improve
Front Street |
5,000,000 |
| FL |
475 |
Florida |
US. Highway 19 Bayside
Segment |
2,000,000 |
| MI |
476 |
Michigan |
Arenac
County, Upgrade Maple Ridge Road from Briggs Road east to M-65 |
1,646,000 |
| NY |
477 |
New York |
Village
of Highland Falls repaving and sidewalk construction of Mearns Ave |
225,000 |
| NY |
478 |
New York |
Village
of Nelsonville improvements, paving & sidewalk installation to North
Pearl St, Crown St, Pine St. & Wood Ave |
250,000 |
| CA |
479 |
California |
Widen
Firestone Blvd between Ryerson Blvd and Stewart and Gray Road in Downey |
2,000,000 |
| CA |
480 |
California |
Construct
Air Cargo Access Road to Oakland International Airport. |
900,000 |
| MD |
481 |
Maryland |
Peer
review study of conflicts between road system and light rail operations in
Linthicum, MD |
100,000 |
| GA |
482 |
Georgia |
Resuiface
and widen Jac-.4rt Road as part of the Bleckley County Development Authority
project |
200,000 |
| VA |
483 |
Virginia |
Construction of Virginia Blue Ridge Trail in Amherst County, |
300,000 |
| FL |
484 |
Florida |
Implement
NE 6th Street/Sistrunk Boulevard Streetscape and Enhancement Project, City of
Ft. Lauderdale |
1,000,000 |
| CA |
485 |
California |
Widen
Lakewood Blvd between Telegraph Rd and Fifth St in Downey |
2,000,000 |
| TX |
486 |
Texas |
Widen
Motor Street thoroughfare in Dallas to improve accessibility to Southwestern
Medical District |
2,500,000 |
| MN |
487 |
Minnesota |
Construction
of Gitchi-Gami State Trail, Lutsen Phase, CR 34 to Loclcport store |
500,000 |
| PA |
488 |
Pennsylvania |
Widen
of SR 309 through the Borough of Coopersburg to create left-turn lanes and
complete the Rt. 309 Corridor Improvement Project |
3,000,000 |
| CA |
489 |
California |
Pasadena Ave/Monterey Rd Partial Grade Separation- Prelim
Engineering-- Feasibility, So. Pasadena |
300,000 |
| OH |
490 |
Ohio |
Intermodal Bikeway,
Independence |
500,000 |
| MO |
491 |
Missouri |
W[DENSHOULDER AND RESURFACE US 136AND |
2,000,000 |
| FL |
492 |
Florida |
S.R.43
(U.S.301) Improvement Project - Ellentown to Parrish, Florida |
3,000,000 |
| GA |
493 |
Georgia |
Bike
and pedestrian paths and other transportation enhancements at Georgia
Veterans Memorial Park |
800,000 |
| AK |
494 |
Alaska |
Citywide
pavement rehabilitation in City of North Pole |
1,000,000 |
| GA |
495 |
Georgia |
Replace and
upgrade sidewalks, Glenwood |
50,000 |
| NY |
496 |
New York |
Bruckner
blvd along Bronx River Aye, Story Ave to Soundview Park Greenway |
1,600,000 |
| GA |
497 |
Georgia |
Widen
SR 133 from Spence Field to SR 35 in Colquitt County, Georgia |
2,000,000 |
| CA |
498 |
California |
Mariposa
County, CA Improve 16 roads, bridge and one bike path |
2,500,000 |
| LA |
499 |
Louisiana |
Upgrade
highway-rail crossings at Madison Street, City of Gretna |
200,000 |
| PA |
500 |
Pennsylvania |
Two-lane
Extension of Bristol Road, Bucks County |
1,000,000 |
| TN |
501 |
Tennessee |
Widen
SR3O From Athens to Etowah, Tennessee |
5,758,000 |
| MI |
502 |
Michigan |
losco
County, Reconstruct Bissonette Road from Lorenz Road to Chambers Road |
322,500 |
| TX |
503 |
Texas |
Development
of one-story 300-vehicle parldng facility |
1,200,000 |
| WA |
504 |
Washington |
Design
and construct improved 1-182 interchange ramps at Broadmoor Blvd. in Pasco,
WA |
2,000,000 |
| NY |
505 |
New York |
Erie
Canalway National Heritage Corridor in Lockport, NY- Transportation
Enhancements |
3,250,000 |
| MI |
506 |
Michigan |
M-6
Paul Henry Freeway trail design and construction |
2,780,000 |
| CT |
507 |
Connecticut |
Reconstruction
and conversion of Union Station in North Canaan to establish a transportation
museum |
1,705,000 |
| OR |
508 |
Oregon |
Construct
passing lanes on US. 199, Josephine County |
1,107,000 |
| CA |
509 |
California |
Scenic preservation and run-off mitigation in the SantaMonica
Mountains National Recreation Area near PCH and US 101 |
1,500,000 |
| IL |
510 |
Illinois |
South Shore
Drive and 67th Underpass |
1,300,000 |
| CA |
511 |
California |
Mission
Boulevard / State Route 71 Interchange—Corridor Improvements |
4,200,000 |
| OR |
512 |
Oregon |
For
purchase of right of way, planning, design and construction of a highway,
Newberg |
11,000,000 |
| VA |
513 |
Virginia |
Smith
River Trail — construction of trail along Smith River in Henry County |
500,000 |
| IL |
514 |
Illinois |
Resuiface
Cflflon Park Ave. and S. Louis Ave., Village of Evergreen |
400,000 |
| NJ |
515 |
New Jersey |
University
Heights Connector for improvements to First Street in Newark from Sussex
Street to West Market Street |
637,000 |
| GA |
516 |
Georgia |
Broad Avenue Bridge:
Albany |
500,000 |
| CA |
517 |
California |
Carlsbad,
CA Construction of Poinsettia Lane |
2,000,000 |
| CA |
518 |
California |
Construct
pedestrian enhancements on Broadway in Los Angeles |
2,500,000 |
| NJ |
519 |
New Jersey |
Construct
Rt 56 Maurice River Bridge Replacement, Salem & Cumberland Counties |
2,000,000 |
| WA |
520 |
Washington |
Conduct
route analysis for community pathway through Chehalis |
50,000 |
| WA |
521 |
Washington |
Construct
a multi-jurisdictional non-motorized transportation ‘project parallel to SR99
called the Interurban Trail |
2,000,000 |
| FL |
522 |
Florida |
Construct
Downtown Bypass Roadway Connector, Lake Mary, Florida |
500,000 |
| NY |
523 |
New York |
To
study, design and construct transportation enhancements on the Brooklyn
Waterfront Greenway in Red Hook, Greenpoint, and
the Navy Yard in Brooklyn |
5,800,000 |
| NY |
524 |
New York |
Update
all county and town traffic signage in Wayne County, |
75,000 |
| CA |
525 |
California |
Construct
Route 101 Auxiliary Lanes 3rd Ave in the City of San Mateo to Millbrae Ave in
Millbrae |
5,000,000 |
| CA |
526 |
California |
Solano County Cordellia Hill/ Sky Valley, transportation
enhancement project, including upgrade of pedestrian and bicycle corridors |
3,000,000 |
| MS |
527 |
Mississippi |
Construct
1-20 Interchange at Hawkins Crossing, Lauderdale County |
2,000,000 |
| TN |
528 |
Tennessee |
Sevier, Jefferson, Cocke Counties, Tennessee SR-35&US4JJ |
1,750,000 |
| GA |
529 |
Georgia |
Upgrade
Safety of Bicycle and Pedestrian Access to Public Schools, Dekalb County |
3,000,000 |
| OH |
530 |
Ohio |
Construction
of Safety and related improvements on Rutlege Transfer Road in Vernon
Township, OH |
120,000 |
| WI |
531 |
Wisconsin |
Reconstruct USH 45 in
Antigo |
2,020,000 |
| WA |
532 |
Washington |
SR
2/Main Street/Old Owen Road Intersection in Monroe |
480,000 |
| GA |
533 |
Georgia |
Install
landscaping and upgrade lighting on Fall Line Freeway, Reynolds |
350,000 |
| WA |
534 |
Washington |
Congestion
relief on 1-405 with added lanes from SR520- SR522 including 2 lanes each way
from NE 85th-NE 124th |
1,000,000 |
| NY |
535 |
New York |
Conduct NYS 5
construction study |
80,000 |
| PA |
536 |
Pennsylvania |
Widen
lanes, add left turn lanes and update & install traffic signals at SR309,
SR 4010 interchange in North Whitehall Township |
1,500,000 |
| KY |
537 |
Kentucky |
Reconstruct 1-64-KY 180 Interchange, Boyd County, Kentucky |
2,000,000 |
| TX |
538 |
Texas |
Widen
US 27lfrom a 2-lane facility to a 4-lane divided facility fi-om Paris, TX to
Pattonville, TX |
1,500,000 |
| TN |
539 |
Tennessee |
Carter
County, Tennessee SR-362 reconstruction |
500,000 |
| OH |
540 |
Ohio |
Construct
Ohio River Trail, Anderson Township |
150,000 |
| MI |
541 |
Michigan |
Delta
County, CR 515 from US 2 and US 41 in Rapid River to County Road 446 at Days
River Road-Bituminous overlay and joint repair |
320,000 |
| FL |
542 |
Florida |
Fund
design phase for widening US 41 north of Dunnellon to four lanes |
1,000,000 |
| TN |
543 |
Tennessee |
Construction
ofElizabethton Connector in Carter County, Tennessee |
500,000 |
| NJ |
544 |
New Jersey |
Newark
Waterfront Pedestrian and Bicycle Access project |
1,500,000 |
| ME |
545 |
Maine |
Plan
and construct Lewiston/Auburn Downtown Connector |
5,800,000 |
| OH |
546 |
Ohio |
Conduct
Miami St along SR Route 53 safety enhancement ‘roject to improve access to
railroad crossing |
1,000,000 |
| AK |
547 |
Alaska |
Planning,
design, and construction of Juneau access roads in Juneau, Alaska |
15,000,000 |
| TN |
548 |
Tennessee |
Construction
of an intersection/interchange in the City of Cleveland along 1-75 |
2,400,000 |
| FL |
549 |
Florida |
Construct
Flagler Avenue Improvements, City of Key West, Florida |
1,000,000 |
| CA |
550 |
California |
Rehabilitate
street surface of Cedros Avenue between Burbank Blvd. and Magnolia Blvd |
43,000 |
| VA |
551 |
Virginia |
Engineering
and Right of Way to widen Route 221 in Forest, Virginia |
1,000,000 |
| NY |
552 |
New York |
Install Inzpro vements for Pedestrian Safety in the vicinity
of PS200 |
250,000 |
| TX |
553 |
Texas |
SH146 grade
separation over Red Bluff Rd |
17,000,000 |
| TN |
554 |
Tennessee |
construction
ofpark access road and adjacent trails at the Athens Regional Park in Athens,
TN |
300,000 |
| IL |
555 |
Illinois |
State
Street Road Improvements from 43rd Street to IL Rt 157, East St. Louis |
2,945,000 |
| GA |
556 |
Georgia |
Streetscape-Dawson |
200,000 |
| SC |
557 |
South Carolina |
Build
Carolina Bays Parkway Segment from SC544 to US] 7 in Myrtle Beach, SC |
3,000,000 |
| GA |
558 |
Georgia |
US
341 US 41 SR 7 from Barnesville to SR 3, Georgia |
4,000,000 |
| OH |
559 |
Ohio |
Reconstruct
and widen State Route 82 in North Ryalton |
1,000,000 |
| FL |
560 |
Florida |
Acquisition,
engineering, and construction of West Avenue Connector Bridge, City of Miami
Beach, FL |
1,500,000 |
| ME |
561 |
Maine |
Safety
Enhancements on Routes 11, 6, and 1 6for Piscataquis County Industrial
Development |
400,000 |
| IL |
562 |
Illinois |
Study,
design, and construction of a designated truck route through the City of
Monticello |
1,132,000 |
| CA |
563 |
California |
Improvement of intersection at Aviation Blvd. and Rosecrans
Ave. to reduce congestion (Hawthorne) |
2,000,000 |
| WI |
564 |
Wisconsin |
Preliminary
engineering for upgrading 194 between Illinois State Line and Mitchell
Interchange in SE Wisconsin |
9,000,000 |
| MI |
565 |
Michigan |
Cogs
hail Road Crossing Improvement and Life Safety Access Project in Holly, MI |
1,200,000 |
| MI |
566 |
Michigan |
Ontonagon
County, Improve Fed Forest Hvy 16 from M-38 to Houghton County Line |
500,000 |
| UT |
567 |
Utah |
Forest
Street Improvements, Brigham City, UT |
2,000,000 |
| NC |
568 |
North Carolina |
140
Union Cross Road Interchange in Forsyth County, NC |
1,000,000 |
| NJ |
569 |
New Jersey |
Construct
Sea Isle Boulevard Reconstruction from Garden State Parkway to Ludlams
Thoroughfare, Cape May County |
2,000,000 |
| CA |
570 |
California |
1-5
HOV improvements from Route 134 to Route 170 |
500,000 |
| NY |
571 |
New York |
Reconfiguration
of intersection and redesign of traffic signal timing at Mohegan Ave and
Lakeland St |
475,000 |
| CA |
572 |
California |
Shoal Creek
Pedestrian Bridge (San Diego) |
1,000,000 |
| GA |
573 |
Georgia |
Streetscape-Cordele |
250,000 |
| CA |
574 |
California |
Construct
1-605 Interchange Capacity Improvements in Irwindale |
2,000,000 |
| SC |
575 |
South Carolina |
Construction
of interchange at 1-385 and SC 14, Exit 19, in Laurens County, South Carolina
|
2,200,000 |
| NE |
576 |
Nebraska |
Design,
right-of-way and construction of Nebraska Highway 35 between Norfolk and
South Sioux City |
4,000,000 |
| MO |
577 |
Missouri |
COMPLETE
IMPACT STUDY FOR NORTH OAK HIGHWAY CORRIDOR REDEVELOPMENT |
500,000 |
| MA |
578 |
Massachusetts |
Design
and construct the 1.5 mile East Longmeadow Redstone rail Trail bike path |
1,500,000 |
| NY |
579 |
New York |
Improve
bicycle and pedestrian safety on Main Street, Holbrook |
100,000 |
| CA |
58 |
California |
Tuolumne,
Stanislaus and Merced Counties Upgrade existing county highway, J59 |
2,500,000 |
| FL |
581 |
Florida |
US.
19 Continuous right turn lanes in Pasco County |
7,000,000 |
| NJ |
582 |
New Jersey |
Union
Boulevard Revitalization and Streetscape Enhancements, Totowa |
500,000 |
| IL |
583 |
Illinois |
Improve
roads, The Village of Westchester |
1,000,000 |
| IN |
584 |
Indiana |
Reconstruct
45th Avenue from Colfax Street to Grant Street, Lake County |
2,700,000 |
| IN |
585 |
Indiana |
Construct
Grade Separation Underpass on Main Street in Mishawaka, Indiana |
1,000,000 |
| UT |
586 |
Utah |
Construct two-lane divided highway from the
AtkinvilleInterchange to the new replacement ailport access road in St.George |
4,000,000 |
| CA |
587 |
California |
Diamond
Bar On-Off Ramp at Lemon Ave on SR-60 |
12,000,000 |
| NY |
588 |
New York |
Harlem Hospital
Parking Garage |
10,000,000 |
| MA |
589 |
Massachusetts |
Downtown
revitalization for Pleasant Street, Maiden |
1,900,000 |
| NY |
590 |
New York |
Install
Impro vements for Pedestrian Safety in the vicinity of Prospect Park Yeshiva |
250,000 |
| NY |
591 |
New York |
Emergency vehicle preemption system at traffic signals,
Smithtown |
500,000 |
| CA |
592 |
California |
Reconstruct
interchange for south-bound traffic entering 1-80 from Central Avenue, City
of Richmond |
3,000,000 |
| KY |
593 |
Kentucky |
Reconstruct
KY 393, Oldham County, Kentucky |
2,000,000 |
| CA |
594 |
California |
Reduce Orange
County Congestion Program |
250,000 |
| CA |
595 |
California |
Street
Closure at Chevy Chase Drive, Glendale |
800,000 |
| PA |
596 |
Pennsylvania |
Allegheny
City Urban Runoff Mitigation-eliminate urban highway runoff and the discharge
of culverted streams into municipal combined
sewers |
1,000,000 |
| SC |
597 |
South Carolina |
Construct
Briggs-Pearson-DeLaine Connector |
25,000,000 |
| NM |
598 |
New Mexico |
Construct
an interchange on 1-25 to provide access to Mesa del So! in Albuquerque |
4,000,000 |
| OR |
599 |
Oregon |
Short
Haul Intermodal Pilot Project, Eugene |
2,500,000 |
| VA |
600 |
Virginia |
Rivermont
Ave. (Lynchburg) Bridge improvements |
1,700,000 |
| MA |
601 |
Massachusetts |
Construct
new interchange on 1-95 between existing Route JAramp to the north and Route
123 ramp to the south, Attleboro |
500,000 |
| OH |
602 |
Ohio |
Construct
Waverly, Ohio South Connector from US 23 to SR 104 to SR 220 |
3,200,000 |
| VA |
603 |
Virginia |
Craig
County Trail — improvements to frail in Craig County |
150,000 |
| CO |
604 |
Colorado |
US
160, State Highway 3 to East 0/the Florida River |
6,000,000 |
| AS |
605 |
American Samoa |
Village road improvements for Ta ‘u, Ofu, and
Olosega-Silicounties in Manu ‘a district |
1,400,000 |
| PR |
606 |
Puerto Rico |
Construction
of 4 lane connector serving PR 9922, PR 9939 and PR 183 |
1,950,000 |
| PA |
607 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking, garage & roadway redesign in Duryea Borough, Luzerne County |
200,000 |
| OK |
608 |
Oklahoma |
SH-33,
Widen SH-33 from the Cimarron River East to US-i 77 Payne County, OK |
8,000,000 |
| TX |
609 |
Texas |
Washington
Boulevard Improvements in Beaumont, Texas |
2,600,000 |
| FL |
610 |
Florida |
Widen
Midway Roadfrom South 25th Street to US. 1 in St. Lucie County |
2,000,000 |
| NY |
611 |
New York |
Enhance
road and transportation facilities in the vicinity of W. 65th St and
Broadway, New York City |
5,000,000 |
| LA |
612 |
Louisiana |
Construct
Kansas-Garrett Connector and 1-20 Interchange Improvements |
5,000,000 |
| PA |
613 |
Pennsylvania |
Construct the SR 1058 Connector between PA 309 and
thePennsylvania Turnpike Northeast Extension in Montgomery County |
1,600,000 |
| OK |
614 |
Oklahoma |
Reconstruct
the Interstate 44 193rd street interchange |
3,000,000 |
| NY |
615 |
New York |
Roadway
improvements to Woodbury Rd at intersection with Syosset- Woodbury Rd |
2,000,000 |
| RI |
616 |
Rhode Island |
Construct
a handicapped accessible frail and platform at Kettle Pond Visitor Center
Administrative Facility |
200,000 |
| NJ |
617 |
New Jersey |
Construct
Great Swamp National Wildlife Refuge Road |
250,000 |
| CA |
618 |
California |
Grade
Separation at 32nd Street between 1-15 and Harbor Drive, San Diego |
1,000,000 |
| IN |
619 |
Indiana |
Widen
Old Meridian Street from 2 to 4 lanes, City ofCannel, Indiana |
1,000,000 |
| WI |
620 |
Wisconsin |
Construct
a bicycle/pedestrian path, City of Portage |
2,200,000 |
| VA |
621 |
Virginia |
Widen Route 17 in Stafford
|
4,000,000 |
| VA |
622 |
Virginia |
Widen Route 820
in Bergton, Virginia |
1,200,000 |
| IL |
623 |
Illinois |
Construction
of 2 North/South Blvds. and 2 East/West Blvds. in the vicinity of Northern
Illinois University |
7,500,000 |
| CA |
624 |
California |
Begin
construction of road from US-395 west towards SR-14 |
1,000,000 |
| PA |
625 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking & roadway redesign in Old Forge Borough, Lackawanna County |
200,000 |
| PA |
626 |
Pennsylvania |
Improvements
to Amtrak Keystone Corridor grade crossings at Irishtown Rd., New Comer Rd.,
and a new bridge at Ebychiques Rd |
500,000 |
| TN |
627 |
Tennessee |
Acquire
and construct trail and bikeway along S. Chickamauga Creek in Chattanooga, TN
|
1,600,000 |
| TX |
628 |
Texas |
Interchange
improvements IH-30 Arlington at FM 157 (Collins Street) and Center Street |
2,000,000 |
| MO |
629 |
Missouri |
Highway
350 Access Management Study from 1435 to 1470 |
1,000,000 |
| TX |
630 |
Texas |
Mile 6
Wfrom US83 to SH 107, Hidalgo County |
1,000,000 |
| NJ |
631 |
New Jersey |
Pedestrian facilities and street lighting on Haddon Avenue |
433,000 |
| NY |
632 |
New York |
Rehabilitate
highway bridges--Ithaca secondary line |
2,500,000 |
| WA |
633 |
Washington |
Buckley,
WA; New Road alignments on 112th Street Corridor |
2,000,000 |
| ID |
634 |
Idaho |
Construct
Washington Street North from Addison Avenue to Pole Line Road |
4,500,000 |
| SC |
635 |
South Carolina |
Construction
of the US-i 5/SC-341 connector parallel to 1-20, Lee County |
4,500,000 |
| PA |
636 |
Pennsylvania |
Construct
Recreational Trail from Oil City to Rynd Farm (Venango County) |
1,000,000 |
| TX |
637 |
Texas |
FM 163 7 from
FM 3051 to FM 185, Waco |
2,000,000 |
| VA |
638 |
Virginia |
Green
Cove Station — improvements to existing Forest Service acility located at
trailhead of Virginia Creeper Trail |
100,000 |
| NJ |
639 |
New Jersey |
South
Essex Street Bridge Pedestrian Access Improvements, Orange |
578,000 |
| TX |
640 |
Texas |
FM 3391
(East Renfro St.) from 1-35W to CR 602, Burl eson |
1,500,000 |
| WI |
641 |
Wisconsin |
Replace
Wisconsin Street Bridge (STH 44) in Oshkosh, Wisconsin |
10,000,000 |
| CT |
642 |
Connecticut |
Construct
Route 11 Extension and Greenway from Salem to Waterford |
16,000,000 |
| TX |
643 |
Texas |
Drainage
Study and Engineering for US 83 in Starr County |
1,000,000 |
| TN |
644 |
Tennessee |
widen SR-62 in Knox
County, TN |
6,500,000 |
| GA |
645 |
Georgia |
Widen
US 17 SR 25 from Yacht Drive to Harry Driggers Boulevard, Glynn County,
Georgia |
2,000,000 |
| KY |
646 |
Kentucky |
Widen US 25
from US 421 North to KY 876, Madison County |
1,000,000 |
| GA |
647 |
Georgia |
Widen
US 280/SR 30 from east of Flint River to SR 300 Connector west of Cordele |
1,000,000 |
| MS |
648 |
Mississippi |
Upgrade
roads in Gunnison, Mound Bayou, Beulah, Benoit, and Shaw, Bolivar County |
2,000,000 |
| NY |
649 |
New York |
Construct
and enhance Fillmore Avenue and traffic down- grade and infrastructure
improvements to Humboldt Parkway, Buffalo |
1,500,000 |
| NJ |
650 |
New Jersey |
Construct
Route 46 & Main Street intel-section in Lodi |
2,000,000 |
| MN |
651 |
Minnesota |
Phase III
construction of Trunk Highway 610-10 Minnesota |
5,000,000 |
| NM |
652 |
New Mexico |
NlvI 128
JCTNM 31 East to Texas State Line |
3,000,000 |
| NJ |
653 |
New Jersey |
Replacement
of Prospect Avenue Culvert, City of Summit, County of Union |
400,000 |
| FL |
654 |
Florida |
US
441 Traffic Improvements —Road sutface, road access, curb, gutter, and right
of way, Miami Gardens |
900,000 |
| MN |
655 |
Minnesota |
Environmental
studies and right of way acuisition for Trunk Highway 55 Corridor Protection
Project |
5,000,000 |
| NY |
656 |
New York |
Roadway
improvements on Woodbine Avenue between 5th Avenue and Beach Avenue |
800,000 |
| NY |
657 |
New York |
Saugerties,
Improve downtown streets |
1,200,000 |
| IN |
658 |
Indiana |
Widen US 31
Hamilton County, Indiana |
1,000,000 |
| GA |
659 |
Georgia |
Build a
bridge across Big Indian Creek, Perry |
1,500,000 |
| MI |
660 |
Michigan |
Caipenter
Road Reconstruction — 700 feet South of Textile Road to 1-94, Washtenaw
County |
2,000,000 |
| IN |
661 |
Indiana |
Resuiface
and widen Shelby County Indiana 400 North Phases IVand V |
500,000 |
| SC |
662 |
South Carolina |
Widen
West Georgia Road from Neely Ferry Road to Fork Shoals Road |
2,000,000 |
| TX |
663 |
Texas |
Construct
Phase II of City of Killeen SH-201 |
4,000,000 |
| MN |
664 |
Minnesota |
Interchange
improvements at 1-94 and CSAH 19 and at CSAH 37 in the city ofAlberrville, MN
|
1,000,000 |
| KY |
665 |
Kentucky |
Construction
of bypass between KY 55 and US 68 at Lebanon in Marion County |
1,000,000 |
| NY |
666 |
New York |
Peruville
Road. Creating overpass to address intersection safety issue |
2,000,000 |
| OR |
667 |
Oregon |
Add
a southbound lane to section of 1-5 through Portland, OR between Delta Park
and Lombard |
5,000,000 |
| MN |
668 |
Minnesota |
10th
Street Bridge Expansion in St. Cloud, MN |
1,000,000 |
| NJ |
669 |
New Jersey |
Intermodal
Access Improvements to the Peninsula at Bayonne Harbor |
2,000,000 |
| TX |
670 |
Texas |
Nolana
Loop from FM 1426 to FM 88, Hidalgo County |
2,000,000 |
| OH |
671 |
Ohio |
Perry
Park Road Improvements and Pedestrian Trail Expansion at Call Road in the
Village of Perry, OH |
67,000 |
| NV |
672 |
Nevada |
Implement
Regional Transportation of Southern Nevada FAST system |
3,000,000 |
| NY |
673 |
New York |
Bronx
River Greenway 233rd Street Connection |
1,000,000 |
| PA |
674 |
Pennsylvania |
Construction
of turn lanes, increase curve radius at the intersection of SR 3041 and
Industrial Park Road, Somerset, Pa |
435,000 |
| FL |
675 |
Florida |
Planning
and design for development offuture highway connections to the Southwest
Florida International Airport |
500,000 |
| WI |
676 |
Wisconsin |
Reconstruct and rebuild St. Croix River Crossing,
connectingWisconsin State Highway 64 in Houlton, Wisconsin toMinnesota State Highway 36 in Stiliwater Minnesota |
7,000,000 |
| TN |
677 |
Tennessee |
Conduct
study for SR4S to SR386 Connector |
500,000 |
| IN |
678 |
Indiana |
Reconstruct
and widen Shelby County Indiana 500 East from I200Nto USS2 |
1,000,000 |
| MO |
679 |
Missouri |
Removal
and Replacement of the Grand Avenue Bridge in the City of St. Louis |
3,500,000 |
| TX |
680 |
Texas |
Conduct reconstruction and managed lanes project on Airport
Freeway (SH 183-SH 121) from IH 820 to the Dallas Countyline |
5,000,000 |
| FL |
681 |
Florida |
Reconstruction
of Hanford Boulevard, North Miami Beach |
2,750,000 |
| MA |
682 |
Massachusetts |
Commonwealth
Ave/Kenmore Sq. Roadway & Pedestrian Improvements |
5,000,000 |
| NY |
683 |
New York |
Pedestrian
walkway and bikeway improvements along the NYC Greenway System in Coney
Isjand |
3,200,000 |
| PA |
684 |
Pennsylvania |
Restore
Route 222 in Maxatawny and Richmond Townships, Berks County, PA |
2,500,000 |
| OH |
685 |
Ohio |
Study
and design of modfications to 1-75 interchanges at ML. King-Hopple, 1-74, and
Mitchell in Cincinnati |
1,500,000 |
| VA |
686 |
Virginia |
Widen
Route 10 to six lanes from Route 1 to Meadowville Road, Chesterfield |
1,000,000 |
| GA |
687 |
Georgia |
Rebuild
sidewalks, install sidewalks, and add speed monitoring system, Alamo |
250,000 |
| CA |
688 |
California |
Widen
Wilmington Ave from 223rd street including ramp modfications, Carson |
3,000,000 |
| WI |
689 |
Wisconsin |
Construct
STH 32 (Claude Allouez) bridge in DePere, Wisconsin (Brown County, Wisconsin)
|
500,000 |
| NY |
690 |
New York |
Construction
of drainage improvements and aethetic enhancements to Oak Beach Road in the
Town of Babylon, NY |
430,000 |
| WI |
691 |
Wisconsin |
Construct
an alternative connection to divert local traffic roml-9Q, a major highway,
and allow movement through the Gateway commercial
development project |
4,000,000 |
| WA |
692 |
Washington |
East
Marine View Drive Widening in Everett |
3,500,000 |
| OH |
693 |
Ohio |
Construction
of safety improvements at intersection of US 422 and SR 700 in Geauga County,
OH |
300,000 |
| WV |
694 |
West Virginia |
Upgrade Route JO, Logan Co
|
5,000,000 |
| TX |
695 |
Texas |
Conduct Preliminaiy Engineering for Funnel Project on SH114
from BS 114L to Dallas County Line and on SH l2l from SH 360 to Dallas Co |
4,000,000 |
| NC |
696 |
North Carolina |
Install ITS on
US7O Clayton Bypass |
1,000,000 |
| PA |
697 |
Pennsylvania |
Brighton
Road Extension-add new street to N Shore roadway network to facilitate access
to amphitheater |
1,000,000 |
| NJ |
698 |
New Jersey |
Broad
Street Streetscape Project in Elizabeth to provide hysical improvements and
to enhance transport ation flow and efficiency |
700,000 |
| FL |
699 |
Florida |
Construction
of 4 lane highway around Jacksonville connecting US] to Route 9A |
3,000,000 |
| WA |
700 |
Washington |
510-507
Loop — Conduct engineering, design, and ROW acquisition for alternative route
to two existing highways that bisect Yelm, WA |
2,500,000 |
| CA |
701 |
California |
Develop
and implement traffic calming measures for traffic exiting the I-710 into
Long Beach |
1,000,000 |
| CA |
702 |
California |
San
Diego, CA Construction of the 1-5 and SR-56 Connectors |
4,000,000 |
| IL |
703 |
Illinois |
Upgrade Ridge Avenue, Evanston |
3,000,000 |
| SC |
704 |
South Carolina |
Widening
and Improvements for Highway 901, York County |
2,000,000 |
| IA |
705 |
Iowa |
Widening
and Reconstruction, 1235, Des Moines |
6,500,000 |
| CA |
706 |
California |
Bay Road improvements between University Avenue toFordham, and
from Clarke Avenue to Cooley Landing. Northern access
improvements between University and Illinois Avenues, East Palo Alto |
6,000,000 |
| NC |
707 |
North Carolina |
Project
to widen US 501 from NC 49 in Roxboro to the VA state line with part on new
location |
4,000,000 |
| NY |
708 |
New York |
Congestion
reduction, traffic flow improvement and intermodal transfer study at
Roosevelt Avenue/74th Street in Queens |
640,000 |
| CA |
709 |
California |
Construct
bicycle and pedestrian bridge between Oyster Bay Regional Park in San Leandro
and Metropolitan Golf Course in Oakland |
750,000 |
| TX |
710 |
Texas |
For
construction of Seg 5 and 6 of SH 130 from 183 to Seguin, TX |
5,000,000 |
| NJ |
711 |
New Jersey |
Construct
the Airport Circle Elimination at Tilton and Delilah Roads, Atlantic County |
1,000,000 |
| KY |
712 |
Kentucky |
Construct
North Somerset Bypass in Pulaski County from Nunn Parirway to KY8O |
7,000,000 |
| NV |
713 |
Nevada |
Construct
US Highway 95— Las Vegas Beltway Interchange |
8,000,000 |
| NY |
714 |
New York |
Repair
and repave the north side of the Mineola train station |
150,000 |
| IL |
715 |
Illinois |
Repair
of CH29 and reconstruction of CH 8 at interchanges with Interstate 55 at
Towanda and Lexington illinois |
1,000,000 |
| CA |
716 |
California |
Conduct
a Project Study Report for new Highway 99 interchange between SR 165 and
Bradbury Road, serving Turlock/Hilmar region |
500,000 |
| PA |
717 |
Pennsylvania |
Construction
of US-22 to 1-79 Section of Southern Beltway, Pittsburgh, Pennsylvania |
1,000,000 |
| MN |
718 |
Minnesota |
Construction
of new highway between the bridge over Partridge River on CR 565 in Hoyt
Lakes to the intersection ofCSAH2I and 70, Babbitt
|
3,000,000 |
| CA |
719 |
California |
State Route 1 improvements between Soquel and MorrisseyBlvd
including merge lanes and the La Fonda overpass, Santa Cruz |
3,670,000 |
| WA |
720 |
Washington |
The
West Corridor Coalition in Washington state |
500,000 |
| WA |
721 |
Washington |
North
Sound Connecting Communities Transportation Project Planning |
1,000,000 |
| FL |
722 |
Florida |
West
Relief Bridge Rehabilitation, Bay Harbor Islands |
1,500,000 |
| NE |
723 |
Nebraska |
Western
Douglas County Trails Project, Nebraska |
5,500,000 |
| TN |
724 |
Tennessee |
Bristol,
Tennessee highway—R.R grade Crossing improvement - Hazeiwood Street |
100,000 |
| GA |
725 |
Georgia |
Extend
East Greene Street, install streetlights, utilities, and landscaping,
Milledgeville |
400,000 |
| CA |
726 |
California |
Grade
Separation at Vanowen and Cliveborne, Burbank |
1,000,000 |
| MA |
727 |
Massachusetts |
Imp
rove traffic signal operations, pavement markings & regulatoiy signage,
Milton-Boston City Line |
1,500,000 |
| NY |
728 |
New York |
Port
Jervis, NY downtown pedestrian mall and promenade |
650,000 |
| MN |
729 |
Minnesota |
Construct
Soo Line Trailfrom no,-th of Bowlus to the east side of Mississippi River |
495,000 |
| WI |
730 |
Wisconsin |
Construct
traffic mitigation signals, signs, and other upgrades or Howard Aye, St.
Francis |
400,000 |
| NH |
731 |
New Hampshire |
Reconstruction
of NH]] and NH 28 Intersection in Alton |
700,000 |
| CA |
732 |
California |
Riverside
Drive Improvements, Los Angeles |
400,000 |
| CA |
733 |
California |
Upgrade
CA SR 4 East from the vicinity of Loveridge Road to G Street, Contra Costa
County |
15,000,000 |
| TX |
734 |
Texas |
Widen
SH 24 from a 2-lane facility to 4-lane divided facility from SH]9to Cooper,
TX |
1,500,000 |
| PA |
735 |
Pennsylvania |
Rail
crossing signalization upgrade, Willow Street, Fleetwood, Berks |
325,400 |
| IL |
736 |
Illinois |
25th
Avenue Grade Separation, Meirose Park |
500,000 |
| SC |
737 |
South Carolina |
Construct
Hub City Connector Passage 02.5 miles of bicycle- ,edestrian improvements,
176-SC 56), part of state-wide Palmetto Trail
Project |
1,000,000 |
| FL |
738 |
Florida |
Construct
US 1/SR 100 Connector, Bunnell, Florida |
2,500,000 |
| MN |
739 |
Minnesota |
Construction
of Gitchi-Gami State Trail from Gooseberiy Falls State Park Trail Head
parking lot to 2.3 miles east |
700,000 |
| CA |
740 |
California |
Design and environmental analysis for State Route 11
connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego. |
1,000,000 |
| NY |
741 |
New York |
Improve North Fork
Trail, Southold |
200,000 |
| HI |
742 |
Hawaii |
Interstate
Route Hi Deck Repair, Airport Viaduct |
4,770,000 |
| OH |
743 |
Ohio |
Replace
Grade Separation at Eastland and Sheldon Road, Berea |
750,000 |
| WA |
744 |
Washington |
Widen I-S through
Lewis County |
3,500,000 |
| SC |
745 |
South Carolina |
Engineering
design and construction of 1-73 from the North Carolina State Line to 1-95 |
10,000,000 |
| OH |
746 |
Ohio |
Planning
and construction of a bicycle trail adjacent to the I- 90 and SR 615
Interchange in Lake County, OH |
2,500,000 |
| SC |
747 |
South Carolina |
Widening
ofBoiling Springs 9from Rainbow Lake Rd. to SC 292 |
5,000,000 |
| IL |
748 |
Illinois |
Construct
Streetscape Project, Orland Hills |
400,000 |
| IL |
749 |
Illinois |
Widening
of Lake Cook Road ITS in Deerfield, IL |
500,000 |
| OR |
750 |
Oregon |
Widening
of Oregon Hwy 21.7 between Tualatin Valley Hwy and the US 26 interchange,
Beaverton - |
10,000,000 |
| PR |
751 |
Puerto Rico |
Widening of PR lii at the intersections of PR-444 and PR 423 |
6,000,000 |
| MI |
752 |
Michigan |
Widen
M-72 from US-31 easterly 7.2 miles to Old M-72 |
2,500,000 |
| PA |
753 |
Pennsylvania |
Widening
ofRt.22 and SR.26 in Huntingdon. Upgrades to the interchange at USRT22 and
SR26 |
3,375,000 |
| MN |
754 |
Minnesota |
Widening
of US Highway 61 at Frontenac Station, MN |
800,000 |
| KS |
755 |
Kansas |
Construction
and reconstruction offour interchanges on I- 435, 1-35 and US-69 in Johnson
Co |
4,000,000 |
| MA |
756 |
Massachusetts |
Melnea Cass Blvd
Reconstruction |
2,000,000 |
| NH |
757 |
New Hampshire |
Improve
Meredith Village Traffic Rotaiy |
1,000,000 |
| FL |
758 |
Florida |
Implement
Blue Heron Boulevard Streetscape Improvements, City of Riviera Beach |
2,500,000 |
| NY |
759 |
New York |
Install Improvements for Pedestrian Safety in the vicinity of
PS114 |
250,000 |
| WI |
760 |
Wisconsin |
Reconstruct
STH 181 between Florist Ave and North Milwaukee County Line |
4,500,000 |
| LA |
761 |
Louisiana |
Replace
the Prospect Street Bridge (LA 3087), Houma |
3,000,000 |
| GA |
762 |
Georgia |
Streetscape
improvements along La Vista Road in the Northialce business district of
DeKalb County, Georgia |
200,000 |
| MD |
763 |
Maryland |
Study
Greater Towson Area traffic flow and future needs |
200,000 |
| FL |
764 |
Florida |
Construct
US 1 Improvements, Cities of Holly Hill and Ormond Beach, Florida |
400,000 |
| OH |
765 |
Ohio |
Transportation
Enhancements to the downtown area of the Village of Chagrin Falls, OH |
700,000 |
| MA |
766 |
Massachusetts |
Pedestrian
Walkway for the Town of Norwood |
780,000 |
| NJ |
767 |
New Jersey |
Restoration
ofRoute 35 in Ocean County, New Jersey |
1,500,000 |
| PA |
768 |
Pennsylvania |
Extension
of Third Street from Interstate 83 to Chestnut Street, Harrisburg |
4,800,000 |
| TX |
769 |
Texas |
Canton road
grade separation, Laredo, TX |
5,000,000 |
| OH |
770 |
Ohio |
Construct
connector roadway between SRJ3 13 and Horns Hill Road in north Newark |
250,000 |
| TN |
771 |
Tennessee |
Construct
new lighting on Veterans Memorial Bridge, Loudon County, Tennessee |
250,000 |
| NY |
772 |
New York |
Roadway improvements on CR3 between Ruland Rd and I- |
2,220,000 |
| TN |
773 |
Tennessee |
Construct
State Route 385 (North and East) around the city of Memphis |
3,150,000 |
| NY |
774 |
New York |
Waterloo, NY by-pass
project |
7,000,000 |
| IN |
775 |
Indiana |
Extend
Everbrook Drive from SR 332 to Bethel Avenue in the City of Muncie, Indiana |
640,000 |
| TN |
776 |
Tennessee |
Construct
Proposed SR397 extension from SR96 West to US 431 North to Franklin
Williamson County |
2,225,000 |
| AK |
777 |
Alaska |
Construct
linking road from airport to port in Akutan |
1,500,000 |
| PA |
778 |
Pennsylvania |
Uniontown
to Brownsville section of Pennsylvania Mon/Fayette Expressway |
5,000,000 |
| NY |
779 |
New York |
Ashburton
Avenue Reconstruction, Yonkers, New York |
1,000,000 |
| OR |
780 |
Oregon |
Highway 22, Polk County |
1,000,000 |
| FL |
781 |
Florida |
1-75
Widening and Improvements in Collier and Lee County, Florida |
45,000,000 |
| WI |
782 |
Wisconsin |
Pioneer
Road Rail Grade Separation (Fond du Lac, Wisconsin) |
4,000,000 |
| FL |
783 |
Florida |
Design
and construction of double-deck roadway system exiting FLL airport connecting
Y.S. 1 and 1-595 |
4,000,000 |
| MI |
784 |
Michigan |
Wayne,
Reconstruct one quarter of a mile stretch of Laurenwood |
125,000 |
| GA |
785 |
Georgia |
Construct
the West Cleveland Bypass from US 129SR 11 near Hope Road exteding west of
Cleveland, on new and existing locations to SR7S |
2,900,000 |
| IL |
786 |
Illinois |
Eliminate
Highway-Railway crossing over US 14 and realignment of US 14, Des Flames |
2,000,000 |
| OR |
787 |
Oregon |
Highway
22-Cascade Highway interchange improvements, Marion County |
500,000 |
| VA |
788 |
Virginia |
Widen
Route 29 between Eaton Place and Route 123 in Faiifax City, VA |
3,000,000 |
| WI |
789 |
Wisconsin |
Reroute State Hwy 11 near Burlington, WI (Kenosha County, |
2,000,000 |
| IL |
790 |
Illinois |
East
Peoria, Illinois Technology Blvd. upgrades |
1,000,000 |
| DC |
791 |
District of Columbia |
Metro Branch Trail
Construction |
2,000,000 |
| MA |
792 |
Massachusetts |
Study
and design 1-93 /Mystic Ave. Interchange at Assembly Sq |
500,000 |
| NM |
793 |
New Mexico |
Widening
of US 491 from Navajo 9 to Colorado state border |
2,000,000 |
| FL |
794 |
Florida |
Construct
access road to link Jacksonville International Airport to 1-95 |
5,000,000 |
| FL |
795 |
Florida |
Widening
of SR 60 from 66th Avenue to 1-95 in Indian River County, FL |
1,000,000 |
| GA |
796 |
Georgia |
Widening
of SR 133: Colquitt Co./Daughtery Co |
1,000,000 |
| PA |
797 |
Pennsylvania |
Rail
Bridge Removal and intersection improvements, Cameron and Paxton Streets,
Harrisburg |
1,300,000 |
| PA |
798 |
Pennsylvania |
Widening
of SR 1001 Section 601 in Clinton County |
1,000,000 |
| PA |
799 |
Pennsylvania |
Widening
of Route 40 in Wharton Township, Fayette County, Pa |
2,000,000 |
| NJ |
800 |
New Jersey |
Widening
of Route 1 and intersection improvements in South Brunswick |
1,000,000 |
| PA |
801 |
Pennsylvania |
construct
PA 706 Wyalusing Bypass Bradford County, Pennsylvania |
1,000,000 |
| IL |
802 |
Illinois |
Construct
four lane extension of IL RT29 from Rochester to Taylorville |
600,000 |
| IL |
803 |
Illinois |
Widening
of Old Madison Road, St. Clair County |
2,000,000 |
| NY |
804 |
New York |
Construction
of Bicycle Path andPedestrian Trail in City of Dunkirk |
500,000 |
| PA |
805 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking & roadway redesign in Plains Township, Luzerne County |
200,000 |
| CA |
806 |
California |
Replace
1-880 overpass at Davis St in San Leandro |
750,000 |
| PA |
807 |
Pennsylvania |
DuBois-Jefferson
County Airport Access Road Construction |
1,000,000 |
| GA |
808 |
Georgia |
St
reetscape project to improve accessibility and safety for ,edestrians, Mount
Vernon |
500,000 |
| IL |
809 |
Illinois |
Replacement
of Fullerton Avenue Bridge and Pedestrian Walkway |
4,800,000 |
| NH |
810 |
New Hampshire |
Construct
intersection at US 3 and Pembroke Hill Road in Pembroke |
700,000 |
| FL |
811 |
Florida |
A new interchange with the Pineda Causeway Extension and I- |
11,000,000 |
| CT |
812 |
Connecticut |
Make
Improvements to Groton Bicycle and Pedestrian Trails and Facilities |
380,000 |
| MN |
813 |
Minnesota |
TH36
- Stillwater Bridge; cut-and-cover approach to river crossing |
500,000 |
| NM |
814 |
New Mexico |
US 54
Reconstruction, Tularosa to Santa Rosa |
2,000,000 |
| VA |
815 |
Virginia |
Daniel
Boone Wilderness Trail Corridor — acquire site; design and construction of
interpretative center, enhancement of trail
corridor |
3,200,000 |
| MI |
816 |
Michigan |
Widening
ofM-24 from two lanes to four lanes with a boulevard from 1-69 to the county
line |
1,000,000 |
| IN |
817 |
Indiana |
Construct US231 in Spencer and Dubois Counties in Indiana |
6,000,000 |
| TN |
818 |
Tennessee |
Construct overpass at Highway 321 and Highway 11 Loudon County |
6,500,000 |
| SD |
819 |
South Dakota |
Advanced Traveler Information |
1,400,000 |
| NV |
820 |
Nevada |
Construct
1-15 Widening— US 95- I 515 Interchange to Apex Road |
6,000,000 |
| NY |
821 |
New York |
Implement
ITS system and apparatus to enhance citywide truck route system on Avenue P
between Coney Island Avenue and Ocean Avenue in
the 9th District of New York |
100,000 |
| GA |
822 |
Georgia |
Install
sidewalks, trails, lighting, and amenities in Balls Feriy Park, Wilkinson
County |
500,000 |
| CA |
823 |
California |
Construct
Inland Empire Transportation Management Center in Fontana to better regulate
traffic and dispatch personnel to incidents |
1,500,000 |
| IL |
824 |
Illinois |
Reconstruct
Milwaukee Avenue, including Six Corners |
17,000,000 |
| TX |
825 |
Texas |
Implementation
and quantification of benefits of large-scale landscaping along freeways and
interchanges in the Houston region |
18,496,000 |
| PA |
826 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of a connector road between
PA 115 & Interstate 81 in Luzerne County |
250,000 |
| AL |
827 |
Alabama |
Pedestrian
Improvements for Homewood, AL |
100,000 |
| TN |
828 |
Tennessee |
Plan and
construct a bicycle and pedestrian trail, Gallatin |
665,000 |
| MA |
829 |
Massachusetts |
Conduct
design, feasibility and environmental impact studies ofproposal to relocate
New BedfordlFairhaven bridge |
2,000,000 |
| IA |
830 |
Iowa |
Iowa
City, IA Construction of arterial extension project connecting Coralville to
west and south Iowa City |
2,500,000 |
| NJ |
831 |
New Jersey |
Rehabilitate
Route 139 in Jersey City — Portway |
2,000,000 |
| NJ |
832 |
New Jersey |
Route 605 extension to
US-206 |
1,000,000 |
| OH |
833 |
Ohio |
Widen SR 170 Calcutta |
2,500,000 |
| IA |
834 |
Iowa |
Widening of Hwy 44, Grimes
|
500,000 |
| VA |
835 |
Virginia |
Widening
of Highway 15 in Farmville, Virginia |
5,000,000 |
| MA |
836 |
Massachusetts |
Design
and construct intersection improvements at Memorial Park Hon Roosevelt Ave
from Bay St to Page Boulevard, Springfield |
1,000,000 |
| SC |
837 |
South Carolina |
Widening
of Frontage Road from US. 72 to US. 56, Laurens, SC |
2,800,000 |
| NY |
838 |
New York |
Mill
Road: NYRte 261 to North Avenue in the Town of Greece |
2,500,000 |
| NC |
839 |
North Carolina |
Widening
of Beckford Drive, City of Henderson |
960,000 |
| NY |
840 |
New York |
Realignment
of Clove Road andRt 208, access management improvements in Orange County |
1,200,000 |
| NY |
841 |
New York |
City
ofPeeskil4NY Street Resurfacing Program. Brown Street |
52,000 |
| FL |
842 |
Florida |
Fund
advanced Right-of-Way Acquisition along SR 52 in Pasco County, Florida |
3,700,000 |
| MA |
843 |
Massachusetts |
Design,
engineer, permit, and construct “Border to Boston Bikeway” rails-trails
project, from Salisbuiy to Danvers |
1,000,000 |
| FL |
844 |
Florida |
SoutelDrive
Road Enhancements, Jacksonville |
1,500,000 |
| NJ |
845 |
New Jersey |
Bicycle
facilities in West Depford Townshir, |
115,000 |
| PA |
846 |
Pennsylvania |
Create
a direct connection between State Road 29 and State Route 113 |
3,000,000 |
| MA |
847 |
Massachusetts |
Design
and construction of the north and southbound ramps on Interstate 91 at Exit
19 |
1,500,000 |
| IA |
848 |
Iowa |
NW 70th Ave
reconstruction, Johnston |
4,500,000 |
| NY |
849 |
New York |
Town of Minisink
South Plank Road |
275,000 |
| VA |
850 |
Virginia |
Town
of St. Paul— restoration of historic Hiliman House to serve as trail system
information center and construction of stations on
trails |
150,000 |
| PA |
851 |
Pennsylvania |
Conduct
environmental review and acquire right of way for preferred alternative to
improve PA 41 |
4,000,000 |
| FL |
852 |
Florida |
Acquire
Right-of- Way for Ludlam Trail, Miami, Florida |
750,000 |
| NY |
853 |
New York |
Construct
Safe Routes to Schools projects in New York City |
3,000,000 |
| CO |
854 |
Colorado |
Construction
of US 24 - Tennessee Pass, Colorado |
6,000,000 |
| CA |
855 |
California |
Implement
Riverside Avenue Railroad Bridge improvements, south of Interstate 10 in
Rialto |
500,000 |
| MA |
856 |
Massachusetts |
Longwood
Ave/Urban Ring Tunnel Study |
450,000 |
| IL |
857 |
Illinois |
Traffic Signal Coordination, at US 45 at IL 132 (Grand |
100,000 |
| IA |
858 |
Iowa |
US 63
improvement near NewHampton, Iowa |
8,700,000 |
| NY |
859 |
New York |
Village
of Unionville reconstruction of Main Street |
80,000 |
| TX |
860 |
Texas |
Wideningfrom
two lanes to four of SH36from Beliville, TX. to Sealy, TX |
7,000,000 |
| KY |
861 |
Kentucky |
Comprehensive
Traffic Study for intersection of Main Street and Berea College Campus, Berea
|
600,000 |
| TN |
862 |
Tennessee |
Improve
State Route 62 in Morgan County near US-2 7 in Wa rt burg to Petit Lane from
existing two lane highway to four lanes |
2,000,000 |
| IL |
863 |
Illinois |
Construct
West Corbin Overpass over illinois 255, Bethalto |
5,000,000 |
| OR |
864 |
Oregon |
Improvements
for intersections heavily traveled through which include Beavirton Hilisdale
Hwy Scholls Feriy and Oleson, Beaverton |
250,000 |
| FL |
865 |
Florida |
Improvements
to 1-75 in the City of Pembroke Pines, Florida |
9,750,000 |
| CA |
866 |
California |
Planning,
design, engineering and construction of Naval Air Station, North Island
access tunnel on SR 75-282 corridor, San Diego |
5,000,000 |
| CA |
867 |
California |
Construct
road from Mace Blvd in Yolo County to federally supported Pacflc Flyway
wild4fe area |
1,000,000 |
| PA |
868 |
Pennsylvania |
Construction
of ramps on 1-95 and US 322, widening of streets and intersections |
3,000,000 |
| NY |
869 |
New York |
Construct
and restore pedestrian and residential roadways in downtown business district
in Rockville Centre |
1,000,000 |
| LA |
870 |
Louisiana |
Plan,
design and construct Pointe Clair Expressway in Therville Parish |
3,000,000 |
| MA |
871 |
Massachusetts |
Construction of East Milton Parking Deck over Interstate/Rt. |
1,000,000 |
| PA |
872 |
Pennsylvania |
|
5,000,000 |
| MI |
873 |
Michigan |
|
1,160,000 |
| OH |
874 |
Ohio |
Construct
Ohio River Trailfrom Downtown Cincinnati, Ohio to Salem Road |
1,400,000 |
| PA |
875 |
Pennsylvania |
Realignment
and reconstruction of SR6O interchange with US22-30 and reconstruct adjacent
Tonidale-Bayer intersection |
1,000,000 |
| NY |
876 |
New York |
Construtction
and rehabilitation of East and West John Streets in the Village of
Lindenhurst, NY |
930,000 |
| NY |
877 |
New York |
Construct
Northern State Parkway and Long Island Expressway access at Marcus Avenue and
Lakeville Road and associated Park and Ride |
6,000,000 |
| PA |
878 |
Pennsylvania |
Deployment of an Intelligent Transportation System along I- |
2,500,000 |
| NY |
879 |
New York |
Install Improvements for Pedestrian Safety in the vicinity of |
250,000 |
| TX |
880 |
Texas |
Build 36th
Street Extension in San Antonio |
2,000,000 |
| CA |
881 |
California |
North
Atlantic Pedestrian Bridge, Monterey Park |
600,000 |
| CA |
882 |
California |
Reconstruct
Eastern Ave from Muller St to Watcher St in Bell Gardens |
1,000,000 |
| PA |
883 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking & roadway redesign in West Pittston, Luzerne County |
200,000 |
| CA |
884 |
California |
Design
Traffic Flow Improvements Azusa and Amar, City of West Covina |
1,250,000 |
| MI |
885 |
Michigan |
Reconstruction
of Nine Mile Road in Eastpointe |
1,120,000 |
| WA |
886 |
Washington |
Redmond, WA City-wide ITS |
1,000,000 |
| IL |
887 |
Illinois |
Reconstruction and realignment of Baseline Rd, Montgomery, |
2,080,000 |
| NY |
888 |
New York |
Transportation
Enhancements to support Development of Erie Canal in Niagra and Orleans
Counties |
750,000 |
| CO |
889 |
Colorado |
US 160, East of Wolf
Creek Pass |
7,500,000 |
| MA |
890 |
Massachusetts |
Design,
engineering and construction at 1-93 The Junction Interchange, Andover,
Tewksbury and Wilmington |
2,500,000 |
| CA |
891 |
California |
Rosemead
Boulevard/Highway 19 Renovation Project, Pico Rivera |
100,000 |
| PA |
892 |
Pennsylvania |
Intersection improvements at PA Route 209 and Water |
500,000 |
| TX |
893 |
Texas |
Improvements
to FM 1979 in Caldwell County |
300,000 |
| HI |
894 |
Hawaii |
Interstate
Route Hi guard rail and shoulder improvements, Waikele Bridge to Airport
Interchange, Honolulu |
3,800,000 |
| Ml |
895 |
Michigan |
M-168
Reconstruction in the village of Elberta |
2,200,000 |
| CA |
896 |
California |
Colima Road
at Fullerton Road Intersection Improvements |
1,000,000 |
| OH |
897 |
Ohio |
Design
and construct Youngstown State University Roadway and Pedestrian Safety
Improvements, Youngstown |
2,500,000 |
| MO |
898 |
Missouri |
Reconstruct
Interstate 44 and Highway 39 Interchange |
5,000,000 |
| WA |
899 |
Washington |
Complete
final Columbia River crossing Environmental Impact Statement for SR35 in
Klickitat County |
800,000 |
| KY |
900 |
Kentucky |
Reconstruct
US 127 at Bellows Road, Mercer County |
600,000 |
| NY |
901 |
New York |
Roadway
and Pedestrian Impro vements for Times and Duffj’ Squares in New York City |
2,000,000 |
| FL |
902 |
Florida |
Six
lane expansion of State Road 200 (AlA) from Interstate 95 east to Amelia
Island |
4,000,000 |
| MI |
903 |
Michigan |
Widen
and reconstruct Tienken Road in Rochester HilLs from Livernois to Sheldon |
4,000,000 |
| NV |
904 |
Nevada |
Design
and Construct 1-580 Meadowood Complex Improvements, Washoe County |
2,000,000 |
| NY |
905 |
New York |
Town of
Chester reconstruction of 13 independent town roads |
200,000 |
| NY |
906 |
New York |
Implement
ITS system and apparatus to enhance citywide truck route system at 9th Street
and 3rd Avenue intersection in Kings County |
100,000 |
| TX |
907 |
Texas |
Construction
of highway infrastructure to provide flood protection for Nueces County |
1,000,000 |
| FL |
908 |
Florida |
Widen State Road
80, Hendiy County |
3,500,000 |
| NE |
909 |
Nebraska |
Construction
of the Columbus, Nebraska North Arterial Road |
4,500,000 |
| KY |
910 |
Kentucky |
Extension
of Newtown Pike from West Main Street to South Limestone Street, Lexington |
16,500,000 |
| OH |
911 |
Ohio |
Road
construction and related improvements in the Village of Gates Mills, OH |
500,000 |
| IL |
912 |
Illinois |
Widening
and Reconstruction of 55th Street from Holmes Avenue to Williams Street in
Westmont and Clarendon Hills |
1,000,000 |
| IL |
913 |
Illinois |
Road
upgrades for the Village of Oreana, IL |
884,000 |
| ID |
914 |
Idaho |
Widen
Amity Roadfrom Chestnut Street to Robinson Road in Nampa, Idaho |
2,000,000 |
| TX |
915 |
Texas |
Widening
FM 60 (University Drive) from SH6 to FM 158, College Station |
3,000,000 |
| GA |
916 |
Georgia |
Widening
Cedarcrest Road from Paulding County line to Governors Towne |
3,150,000 |
| CA |
917 |
California |
Widening
Avenue 416 in Dinuba California |
1,500,000 |
| MA |
918 |
Massachusetts |
Design
and construction of streetscape improvements on Main and Maywood Streets,
Worcester |
600,000 |
| TX |
919 |
Texas |
Extend
Munn Street from Demaree Ln to Gellhorn Drive |
1,000,000 |
| MN |
920 |
Minnesota |
City
of Moorhead SE Main GSI, 34th St. and 194 Interchange and Moorhead
Comprehensive Rail Safety Program |
3,000,000 |
| AL |
921 |
Alabama |
Widening
and safety improvements to SR-21 6 between SR -215 and 1-59, 1-20 |
3,000,000 |
| WA |
922 |
Washington |
Improve
135 mile section of Klicldtat bicycle and pedestrian trail between Lyle and
Klickitat |
250,000 |
| IL |
923 |
Illinois |
Improve safety of culvert replacement on 250th Rd between |
320,000 |
| NY |
924 |
New York |
Kingston, Improve
uptown streets |
1,000,000 |
| PA |
925 |
Pennsylvania |
Replace
Blair Creek Bridg over the Little Lehigh creek, just west of the Maple Grove
Bridge, in Longswamp Township, Berks County |
1,600,000 |
| CA |
926 |
California |
Construct
highway connecting State Route 78/86 and State Route 111, Brawley |
9,500,000 |
| GA |
927 |
Georgia |
Widening
and improvements on Colerain Road in St. Maiys, Georgia |
1,000,000 |
| MD |
928 |
Maryland |
Implement
Pedestrian and Roadway Improvements Contained in the Druid Hill Park
Neighborhood Access Program in Baltimore |
2,000,000 |
| AZ |
929 |
Arizona |
Kabba
Wash project between 1-40 and Wikieup |
2,000,000 |
| ME |
930 |
Maine |
Route 2
Improvements from Bethel to Gilead |
500,000 |
| FL |
931 |
Florida |
Widening
and Improvements for 1-75 in Collier and Lee County |
27,000,000 |
| TX |
932 |
Texas |
Widening 349
Dawson and Martin County |
2,000,000 |
| WI |
933 |
Wisconsin |
Widen
Wisconsin State Highway 64 between Houlton and New Richmond |
4,000,000 |
| IN |
934 |
Indiana |
Widen
Wheeling Avenue from Centennial to McGalliard Road in the City of Muncie,
Indiana |
960,000 |
| MN |
935 |
Minnesota |
Construct a bike trail along the north side of TH 11 to the |
540,000 |
| FL |
936 |
Florida |
Construct
pedestrian underpass and safety improvements at SR AlA and Castillo Drive,
City of St. Augustine |
1,600,000 |
| CA |
937 |
California |
Rehabilitate
street surfaces in Sherman Oaks |
124,000 |
| CA |
938 |
California |
Repair
and realignment of Brahma Dr. and Winnetka Ave |
300,000 |
| NJ |
939 |
New Jersey |
Riverwalk
in Millburn along the West Branch of the Rahway River |
750,000 |
| AL |
940 |
Alabama |
1-20
widening and safety improvements in St. Clair County |
4,000,000 |
| TN |
941 |
Tennessee |
Plan
and construct Rutherford County visitor’s center! transportation information
hub |
500,000 |
| UT |
942 |
Utah |
Streetscape
a two-lane road and add turning lanes at key intersections on Santa Clara
Drive in Santa Clara |
500,000 |
| CA |
943 |
California |
US 101
Operational Improvements, San Jose |
5,000,000 |
| IL |
944 |
Illinois |
Upgrade
traffic signal system on 87th Street, Chicago |
500,000 |
| LA |
945 |
Louisiana |
Water
Well Road Gateway Cooridor (LA 478) - Design, Right of Way, and Construction
of 3.6 miles from 1-49 to LA 1 |
5,650,000 |
| CO |
946 |
Colorado |
East
104th and US85 Intersection: Study, design and construction of needed
improvements to intersection |
1,000,000 |
| FL |
947 |
Florida |
Widen
West Virginia Drive from Floresta Drive to US] in St. Lucie |
3,000,000 |
| ID |
948 |
Idaho |
Widen
US-95 in Idaho from Jct. SH-1 to Canadian Border |
3,000,000 |
| IL |
949 |
Illinois |
Engineering
of the Willow Creek Trail Extension from Rock Cut State Park to the Long
Prairie Trail |
200,000 |
| CA |
950 |
California |
Widen Interstate 8 overpass at Dogwood Road, Imperial |
2,122,500 |
| CA |
951 |
California |
Improve
bridge 58-7 on SR 115 that crosses the Alamo River in Holtville and also
project design and environmental ananlysis of a
new bridge over the same river |
1,000,000 |
| ID |
952 |
Idaho |
analysis of a new bridge over the same river |
3,000,000 |
| MI |
953 |
Michigan |
Complete
the 2 segments of US-127 from Ithaca to St. Johns to a limited access freeway
|
5,000,000 |
| CA |
954 |
California |
Construct
a new interchange where 1-15 meets Cajalco Road in Corona, CA |
10,000,000 |
| OH |
955 |
Ohio |
Construct
interchange at CR 80 on JR 77 near Dover |
5,000,000 |
| TX |
956 |
Texas |
US
67, widening from Nolan River to West Buffalo Creek, Cleburne |
3,000,000 |
| NC |
957 |
North Carolina |
Widen
and improve 185 through Cabarrus County from US 29 49 to 29 601 |
8,000,000 |
| NC |
958 |
North Carolina |
US4OJ from Raleigh
to Fayetteville |
4,000,000 |
| GA |
959 |
Georgia |
Construct
and Improve Westside Parkway, Northern Section, in Fulton County |
4,000,000 |
| NY |
960 |
New York |
City
of Peeskill,NY Street Resurfacing Program. Hudson Avenue |
130,000 |
| CA |
961 |
California |
Construction
of CA 101 Auxiliaiy Lanes, Marsh Rd. to Santa Clara County Line |
2,250,000 |
| NY |
962 |
New York |
For
the acquisition offeriy boats and ferry terminal facilities and operation
offeriy seri’ice from Rockland County-Yonkers- Manhattan
|
1,500,000 |
| IL |
963 |
Illinois |
For engineering, right-of-way acquisition and reconstruction
of two existing lanes on Arsenal Road from Baseline Rd to Rt |
1,750,000 |
| PA |
964 |
Pennsylvania |
For
the Scranton City Redevelopment Authority to design, engineer, acquire ROW
& construct streetscapping enhancements,
paving, lighting & safety improvements, parking & roadway redesign |
2,500,000 |
| FL |
965 |
Florida |
Construct
landscaped sidewalks, bus lanes, pedestrian/bicycle ,aths, vehicular lanes,
City of Plantation |
1,536,041 |
| NY |
966 |
New York |
Improve
Route 17 - Access Control, Elmira to Chemung |
2,500,000 |
| PA |
967 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking & roadway redesign in Plymouth Borough, Luzerne County |
200,000 |
| ID |
968 |
Idaho |
Improve SH-75
from Timmerman to Ketchum |
5,000,000 |
| OR |
969 |
Oregon |
Improve US.
97 from Modoc Point to Algoma |
2,000,000 |
| SD |
970 |
South Dakota |
Construct
an interchange on 1-90 at Marion Road west of Sioux Falls |
1,400,000 |
| CA |
971 |
California |
Realign
First St between Mission Rd and Clarence St in Los Angeles |
1,250,000 |
| MO |
972 |
Missouri |
Relocation
of Route 13 Branson West Bypass |
5,200,000 |
| IL |
973 |
Illinois |
Resuifacing
Congress Parkway, The Illinois Department of Transportation |
500,000 |
| RI |
974 |
Rhode Island |
Establish
interchange between Route 4 and Interstate 95 |
6,000,000 |
| TX |
975 |
Texas |
Improvements to FM
676 in Alton |
500,000 |
| MA |
976 |
Massachusetts |
Reconstruction
of Goddard Memorial Drive from State Route 9 to Aiiport Drive, Worcester |
2,000,000 |
| FL |
977 |
Florida |
Homestead,
FL Widening of SW 320 Street (Mowry Drive) from FlaglerAvenue to SWl87Avenue |
2,500,000 |
| CT |
978 |
Connecticut |
Broad Street Reconstruction Project in New Britain |
1,800,000 |
| PA |
979 |
Pennsylvania |
Construct Johnsonburg Bypass |
4,400,000 |
| CT |
980 |
Connecticut |
Construct
Valley Service Road Extension, North Haven |
2,000,000 |
| VA |
981 |
Virginia |
Construction
of transportation related enhancements and infrastructure of the VMFA project
|
1,000,000 |
| MI |
982 |
Michigan |
Reconstruct
and Widen 1-94 in Kalamazoo, MI |
14,000,000 |
| MD |
983 |
Maryland |
Land
Acquistion for Highway Mitigation in Cecil and Worcester Conties, MD |
19,500,000 |
| CA |
984 |
California |
Construct
oveFpass on Central Ave at the railroad crossing in Newark |
750,000 |
| IL |
985 |
Illinois |
City
of Bartonville, Street widening and improvements and sidewalk improvements |
952,572 |
| OH |
986 |
Ohio |
Construct
Williamsburg, Ohio to Batavia, Ohio Hike & Bike Trail |
250,000 |
| IL |
987 |
Illinois |
The
continuation of US Route 12 from the Wisconsin state line to the intersection
of Tryon Grove Road, Route 12 and Illinois State
Route 31 |
3,000,000 |
| FL |
988 |
Florida |
Us] 7-92
and French Ave. Roundabout, Sanford |
500,000 |
| PA |
989 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking & roadway redesign in Hanover Township, Luzerne County |
200,000 |
| MI |
990 |
Michigan |
Reduction
from 3.5 miles of travel to 1.0 miles of travel crossing over the
Tittabawassee River on Meridian Road |
3,000,000 |
| ID |
991 |
Idaho |
Widen
US-95 from Top of Lewiston Hill to Moscow, Idaho |
2,000,000 |
| TX |
992 |
Texas |
Construct
a pedestrian/bicycle trail in the Sunnyside area of Houston |
750,000 |
| TX |
993 |
Texas |
Construct remaining 800-foot 4-lane divided thoroughfare for |
1,160,000 |
| AS |
994 |
American Samoa |
Shoreline
protection and drainage mitigation for Aua village roads |
1,000,000 |
| SC |
995 |
South Carolina |
Medical
University of South Carolina Roadway Enhancement |
4,000,000 |
| PR |
996 |
Puerto Rico |
Replacement
ferries on Culebra and Vieques routes |
2,000,000 |
| MI |
997 |
Michigan |
Livonia,
reconstruct Stark Rd. between Plymouth Rd. and 1-96 |
1,000,000 |
| PA |
998 |
Pennsylvania |
PA
Rou,te 309 roadway construction and signalization improvements in Tama qua
Borough |
2,000,000 |
| MA |
999 |
Massachusetts |
Union
Square Roadway & Streetscape Improvements |
500,000 |
| TX |
1000 |
Texas |
Improvements
to South McColl Road in Hidalgo County |
2,400,000 |
| MS |
1001 |
Mississippi |
Widen US
Hwy 61 and improve major intersections, Natchez |
2,000,000 |
| TX |
1002 |
Texas |
Widen
US 82 from 2-lane facility to 4-lanefacilityfrom FM 1417 in Sherman, TXto US
69 in Bells, TX |
4,000,000 |
| TX |
1003 |
Texas |
Widen
US 79, from FM 1512 near Jewett to IH-45 to a four- lane divided highway |
2,000,000 |
| TN |
1004 |
Tennessee |
Construct
shoulder and turn lane on SR 35 in Seymour, Tennessee |
1,500,000 |
| NE |
1005 |
Nebraska |
Construction
of Heartland Expressway between Alliance and Minatare, NE |
7,500,000 |
| WA |
1006 |
Washington |
Pedestrian
Sidewalk Construction in Snohomish |
175,000 |
| TN |
1007 |
Tennessee |
North
Second Street Corridor Upgrade, Memphis |
2,000,000 |
| OH |
1008 |
Ohio |
Purchase
High Speed Ferries for Black River Excursion Boat Service, Lorain |
750,000 |
| MD |
1009 |
Maryland |
MD4 at Suitland Parkway |
4,000,000 |
| OK |
1010 |
Oklahoma |
Widen
US 60 from approximately 2 miles east of the US 60- US 75 interchange east
approximately 5.5 miles |
1,000,000 |
| NC |
1011 |
North Carolina |
Widen US
401 from Wake County to Louisburg |
3,000,000 |
| PA |
1012 |
Pennsylvania |
CUPSS,
Pennsylvania, Urban Maglev Demonstration Test Project |
5,000,000 |
| TX |
1013 |
Texas |
Widen
US 287 Bypass at Ennis from two to four lanes |
7,000,000 |
| KY |
1014 |
Kentucky |
Widen
US27from KY34 to US 150 Bypass, Garrard County and Lincoln County |
2,000,000 |
| MN |
1015 |
Minnesota |
Right
of way acquisition for Mississippi River Bridge connecting 194 and USJO
between US] 69 and THJO1 |
1,000,000 |
| WI |
1016 |
Wisconsin |
Rehabilitate
Highway 53 between Chippewa Falls and New Auburn |
4,000,000 |
| IL |
1017 |
Illinois |
Widen
US. Route 67from Macomb to illinois 101 |
2,000,000 |
| IL |
1018 |
Illinois |
Widen US.
Route 51 from Pana to Vandalia |
3,000,000 |
| IL |
1019 |
Illinois |
Widen
US. Route 34 from US. 67 to Carmen Road |
4,000,000 |
| WA |
1020 |
Washington |
Alaskan Way Viaduct
and Seawall |
14,000,000 |
| NJ |
1021 |
New Jersey |
East
Coast Greenway bicycle and pedestrian path from New Brunswick to Hudson River
|
1,000,000 |
| FL |
1022 |
Florida |
Construct
bicycle and pedestrian undperpass and park under 1-95, Miami |
1,500,000 |
| CA |
1023 |
California |
Implement
Van Nuys Road and Safety Improvements |
500,000 |
| FL |
1024 |
Florida |
New
systems interchange ramps at SR 417 and Boggy Creek Road in Orange County, FL
|
6,000,000 |
| NY |
1025 |
New York |
Reconstruction
of Tappan Street Bridge in Town of Newark Valley |
1,000,000 |
| IL |
1026 |
Illinois |
Widen
Rakow Roadfrom Ackman Road to IL Rt 31 in McHenty County, Illinois |
6,400,000 |
| IL |
1027 |
Illinois |
Widen
US. Route 30 from Rock Falls to Round Grove, Whiteside County |
500,000 |
| TN |
1028 |
Tennessee |
Bristol,
Tennessee highway-RR grade crossing improvement - Cedar Street |
50,000 |
| IL |
1029 |
Illinois |
Perform
Broadway and Sheridan Road signal interconnect project, Chicago |
1,500,000 |
| IL |
1030 |
Illinois |
Widen
US. Highway 30 in Whiteside County, illinois |
1,000,000 |
| WI |
1031 |
Wisconsin |
Rehabilitate
existing bridge and construct new bridge on Michigan Street in Sturgeon Bay,
Wisconsin |
5,000,000 |
| ME |
1032 |
Maine |
Replacement
of the Route 201-A “covered” bridge, Norridgewock |
1,000,000 |
| AR |
1033 |
Arkansas |
Widen
to four lanes, improvement, and other development to US. Highway 167 from L4
state line north to 1-530 |
5,000,000 |
| PA |
1034 |
Pennsylvania |
Widen
the Route 412 corridor from 1-76 into the City of Bethlehem |
10,000,000 |
| HI |
1035 |
Hawaii |
Construct
access road for Kahului Aiiyort |
1,000,000 |
| IL |
1036 |
Illinois |
Improve
Highway-Railroad Crossings, Galesburg |
750,000 |
| MN |
1037 |
Minnesota |
Sauk
Rapids Bridge and Roadway Replacement in Sauk Rapids, MN |
6,000,000 |
| TN |
1038 |
Tennessee |
Construct
Transportation and Heritage Museum in Townsend, Tennessee |
1,000,000 |
| CA |
1039 |
California |
Widen
State Route 98, including storm drain developments, from Kloke Road to State
Route ill, Calexico |
3,000,000 |
| CA |
1040 |
California |
Widen
State Route 98from Route]!] to State Route 7, Calexico |
5,000,000 |
| GA |
1041 |
Georgia |
Construction
of bypass around town of Hiram, from SR 92 to US 278, Paulding County,
Georgia |
2,500,000 |
| TX |
1042 |
Texas |
Construction
of the interchanges at B120 and 1H20 for JBS Parkway |
2,500,000 |
| CA |
1043 |
California |
Widen
State Route 46 between Airport Road and the Shandon Rest Stop in San Luis
Obispo County |
33,461,000 |
| TN |
1044 |
Tennessee |
Widen
State Route 4 (US- 78) from Mississippi State Line to Getwell Road (SR-i 76)
in Memphis, Shelby County |
1,000,000 |
| MI |
1045 |
Michigan |
Baraga County, Reconstruction of county primary road on |
750,000 |
| NY |
1046 |
New York |
Town of
Warwick, NY walking and biking trail |
500,000 |
| AK |
1047 |
Alaska |
Bridge
over Fish Creek in Matanuska-Susitna Borough |
1,000,000 |
| GA |
1048 |
Georgia |
GA
400 and McGinnis Ferry Road Interchange, Forsyth County, GA |
3,900,000 |
| NY |
1049 |
New York |
Implement
Improvements for Pedestrian Safety in Kings County |
1,000,000 |
| NY |
1050 |
New York |
Reconfigure
road through FDR VA Hospital to provide access to Battery Place in Town of
Cortlandt |
395,000 |
| CA |
1051 |
California |
Widen
State Route 262, replace two railroad overpass structures, and rebuild on and
off ramps between SR 262 and Kato Rd. in Fremont |
4,000,000 |
| TN |
1052 |
Tennessee |
Widen
State Route 101 in Cumberland County from two lane highway to five lanes
between State Routes 282 (Dunbar Road) and 392 in
Crossville |
8,000,000 |
| FL |
1053 |
Florida |
Widen
State Road 50 in Lake County, Florida |
7,000,000 |
| AZ |
1054 |
Arizona |
Widen SR 95
through Lake Havasu City |
2,000,000 |
| GA |
1055 |
Georgia |
Widen
SR 85 from SR 74 to County Route 126 Bernhard Road, Fayette County, Georgia |
3,000,000 |
| CT |
1056 |
Connecticut |
Construct
New arterial roadway from Boston Avenue north to roposed Lake Success
Business Park in Bridgeport, CT |
10,000,000 |
| MI |
1057 |
Michigan |
M-13
Washington Avenue Streetscape Project. Phase II of High Priority Project 192
in.PL 105-550. City of Saginaw |
1,500,000 |
| TX |
1058 |
Texas |
Improvements
to FM 716 in Duval County |
1,000,000 |
| NY |
1059 |
New York |
Town of
Chester Surrey Meadow subdivision road improvements |
300,000 |
| PA |
1060 |
Pennsylvania |
Cresheim
Valley Drive Revitalization project involving scenic enhancements &
pedestrian safety improvements from Lincoln Drive
to Navajo Street |
1,100,000 |
| NC |
1061 |
North Carolina |
Transportation
Improvements at Piedmont Triad Research Park, Winston-Salem, NC |
2,000,000 |
| MO |
1062 |
Missouri |
Upgrade
and partially relocate MO Rt 141 from 1-64 to Rt 340 |
2,600,000 |
| NY |
1063 |
New York |
Construct
Millennium Parkway in the Towns of Dunkirk and Sheridan |
10,500,000 |
| AZ |
1064 |
Arizona |
Construct
the Rio Salado Parkway to connect I-JO and Loop 2 02 freeways to 7th Street
in downtown Phoenix |
8,000,000 |
| TN |
1065 |
Tennessee |
Improving
Vehicle Efficiencies at At-Grade highway-Railroad Crossing in Lenoir City,
TI’! |
104,000 |
| NJ |
1066 |
New Jersey |
Replacement
of Monmouth County bridges W- 7, W-8, and W- 9 |
2,000,000 |
| OK |
1067 |
Oklahoma |
US-54,
Widen US-54 from North of Optima Northeast to Kansas State Line, Texas
County, OK |
1,000,000 |
| FL |
1068 |
Florida |
Widen
Palm Coast Parkway and 1-95 interchange and overpass, Flagler County, Florida
|
2,900,000 |
| FL |
1069 |
Florida |
Deiray
Beach Federal Highway pedestrian improvements SE 4th Street to NE 4th Street |
2,000,000 |
| WI |
1070 |
Wisconsin |
Expand
Highway 10 between Marshfield and Stevens Point |
20,000,000 |
| NY |
1071 |
New York |
Install Impro vements for Pedestrian Safety in the vicinity of
IS |
250,000 |
| TN |
1072 |
Tennessee |
Upgrade
roads for Slack Water Port facility and industrial park Lake County |
1,875,000 |
| AK |
1073 |
Alaska |
Emergency
evacuation road at Point Hope in North Slope Borough |
3,000,000 |
| Ml |
1074 |
Michigan |
Construct
railroad grade separation on M-85 (Fort Street) North of Van Horn Road,
Trenton |
2,000,000 |
| IL |
1075 |
Illinois |
Land
acquisition, engineering, and construction for the initial 2-lane segments of
the Corridor between 1L31 to 1L25 and other
segments of the Corridor as appropriate |
1,000,000 |
| PA |
1076 |
Pennsylvania |
Modernize
traffic signals, complete minor roadway realignment, and improve
channelization at US322 and PAlO intersection |
480,000 |
| KS |
1077 |
Kansas |
Construction
of a four-lane access controlled improvement for 4 miles on US-54/400 in
Pratt County |
10,686,000 |
| IN |
1078 |
Indiana |
Upgrade
rail crossing at 93rd Avenue, St. John |
200,000 |
| FL |
1079 |
Florida |
Widen
SR 710 by 2 lanes from Congress Avenue to US-i |
3,000,000 |
| GA |
1080 |
Georgia |
Widen
SR 234/Gillionville Road from Eight Mile Road to Lockett Station, Dougherty
County |
1,000,000 |
| CA |
1081 |
California |
Widen
SR 12 to four lanes through Jamieson Canyon (between 1-80 and SR 29) for
safety concerns and economic growth |
5,000,000 |
| GA |
1082 |
Georgia |
Widen SR 104 from SR 383/Belaire Road to CR |
4,000,000 |
| iN |
1083 |
Indiana |
Study Traffic on Muncie By-Pass from Centennial Avenue to |
120,000 |
| FL |
1084 |
Florida |
Construct
US 17-92 improvements, Maitland, Florida |
1,500,000 |
| CA |
1085 |
California |
Widen
South Main St.-Soda Bay Rd. between CR 400A (mile marker 0. 0-miler marker
and 0.7) and CR 502 (mile marker 0.0 and 0.9) |
3,000,000 |
| VA |
1086 |
Virginia |
Replacement
of the 635 Bridge in Orange County, VA |
500,000 |
| TX |
1087 |
Texas |
construct Loop 20 in
Laredo |
16,000,000 |
| IA |
1088 |
Iowa |
Construct
SE Connector/MLK Pkwy, Des Moines |
7,500,000 |
| FL |
1089 |
Florida |
Construction
and Design of Miami River Greenway Road Improvements and 5th Street
Improvements |
2,000,000 |
| TX |
1090 |
Texas |
Widen SH
317 from two lanes to four lane divided facility |
2,000,000 |
| TX |
1091 |
Texas |
Widen
SH 205 from two lanes to a six lane urban divided highway from North of SH 66
to proposed SH 276 |
1,000,000 |
| CA |
1092 |
California |
Widen
Santa Maria River Bridge on US. Highway 101 between Santa Barbara County and
San Luis Obispo County |
3,400,000 |
| CA |
1093 |
California |
Widen
San Fernando Road North, including streetscape projects, Sylmar |
1,060,000 |
| PA |
1094 |
Pennsylvania |
Central Susquehanna Valley Transportation Project US 15: |
4,100,000 |
| NJ |
1095 |
New Jersey |
Construct
Rt 49 Cohansey River Bridge Replacement, Cumberland County |
3,000,000 |
| ME |
1096 |
Maine |
Construction
and snowmobile safety accommodations for Route 116 Bridge, Medway |
4,000,000 |
| MI |
1097 |
Michigan |
Construct
pedestrian trail and bridge in Kearsley Park in Flint |
100,000 |
| IA |
1098 |
Iowa |
Coralville,
IA Implementation offinal phase of Safety Improvements Project from 12th Ave
to 22nd Ave |
900,000 |
| IL |
1099 |
Illinois |
Expand
and improve illinois Route 47 Roadway from Reed Road to Kreutzer Road in
Huntley, Illinois |
6,400,000 |
| NY |
1100 |
New York |
Build Route
15, Pennsylvania to Presho |
10,000,000 |
| GA |
1101 |
Georgia |
1-285
Riverside interchange reconstruction, Fulton County, Georgia |
1,500,000 |
| MN |
1102 |
Minnesota |
Construct
3 segments of Cuyuna Lakes Trails, Crow Wing County |
1,200,000 |
| WA |
1103 |
Washington |
Improve I-S
interchange at 134th Street in Clark County |
11,350,000 |
| GA |
1104 |
Georgia |
Construct
Pedestrian Safety Improvements on Buford Hwy (SR-13), Dekaib County |
3,000,000 |
| DC |
1105 |
District of Columbia |
11th
St. Bridges, Rehabilitation of structures as well as new ramps to provide for
traffic at Naiy Yard, Southeast Federal Ctr., and
Gateway Government Ctr |
32,000,000 |
| MO |
1106 |
Missouri |
Improve
US. 36 to divided four lane express way from Macon to Route 24 |
8,000,000 |
| VA |
1107 |
Virginia |
Mill Road Slip Ramp |
500,000 |
| NY |
1108 |
New York |
Construct
sidewalks and curbing on Tate Avenue in Village of Buchanan |
375,000 |
| MI |
1109 |
Michigan |
Delta
County, Widen, pulverize, improve drainage at County Rd 497 from US 2 at
Nahma Junction southerly 4.75 miles to the village
of Nahma |
575,000 |
| UT |
1110 |
Utah |
Construction
of200 North Street highway-rail graded crossing separation, Kaysville, Utah |
4,000,000 |
| FL |
1111 |
Florida |
Kennedy
Blvd. Reconstruction, Eatonville |
2,000,000 |
| VA |
1112 |
Virginia |
Improvements
to public roadways within the campus boundaries of the Virginia Biotechnology
Park, Richmond, VA |
2,000,000 |
| VA |
1113 |
Virginia |
Install
Transporation Critical Incident Mobile Data Collection Device in
Charlottesville |
400,000 |
| NY |
1114 |
New York |
Ithaca,
Design and construct pedestrian and bicycle path |
544,000 |
| AZ |
1115 |
Arizona |
Navajo
Mountain Road on the Navajo Nation |
1,000,000 |
| PA |
1116 |
Pennsylvania |
Expansion
of existing PA Turnpike ITS System |
4,100,000 |
| TX |
1117 |
Texas |
Construction
offerryboat for City of Port Aransas |
400,000 |
| NY |
1118 |
New York |
Project
will rehabilitate and reopen historic High Bridge, which crosses the Harlem
River between Manhattan and the Bronx |
5,000,000 |
| NJ |
1119 |
New Jersey |
Route 17 Congestion Improvements and Widening, from |
12,000,000 |
| IN |
1120 |
Indiana |
Design
and construct Tanner Creek Bridge on US5O, Dearborn County Indiana |
1,240,000 |
| NC |
1121 |
North Carolina |
Environmental
studies and construction of US 74 Monroe Bypass Extension |
5,000,000 |
| OH |
1122 |
Ohio |
Construct
Pedestrian Bridge from east of Dock 32 to Voinovich Park southwest corner,
Cleveland |
2,140,000 |
| GA |
1123 |
Georgia |
Extension
of Sugarloaf Parkway, Gwinnett County |
1,000,000 |
| ME |
1124 |
Maine |
Construct
bicycle and pedestrian bridge over Stillwater River, Orono |
1,000,000 |
| IL |
1125 |
Illinois |
For
widening from two to four lanes, the Brookmont Boulevard Viaduct in Kankakee,
IL and adjusting approach grades |
750,000 |
| GA |
1126 |
Georgia |
1-285
SR 400 interchange reconstruction and HO V interchange, Fulton County,
Georgia |
1,000,000 |
| MN |
1127 |
Minnesota |
Construct
a road between Highway 332 and TH 11 including a signalized rail road
crossing, Koochiching County |
300,000 |
| MO |
1128 |
Missouri |
Hanley
Roadfrom 1-64 to south of State Route 100, St. Louis County |
4,000,000 |
| AL |
1129 |
Alabama |
Expand
SR-167 from Troy, AL to Enterprise, AL |
3,000,000 |
| MN |
1130 |
Minnesota |
Construction
ofprimary and secondary access roadways to the Duluth Air National Guard
Base, City of Duluth |
4,250,000 |
| CT |
1131 |
Connecticut |
Construct
high-speed rail crossing to bike and pedestrian trails -Enfield, CT |
2,300,000 |
| TX |
1132 |
Texas |
Expansion
of Port Rd at Northbound Frontage Rd of SH146 east to intersection with
Cruise Terminal Rd to 6-lane section with raised
median |
7,340,000 |
| TN |
1133 |
Tennessee |
Constuct
Western Biass from Zinc Plant Road to Dotsonville Road, Montgomery County |
3,400,000 |
| CA |
1134 |
California |
Improvements
to SR-67, Mapleview to Dye Road (San Diego) |
5,000,000 |
| TN |
1135 |
Tennessee |
Plan
and construct a bicycle and pedestrian trail, Springfield |
250,000 |
| TX |
1136 |
Texas |
Expansion
of Daniel McCall Dr., LuJkin, TX |
3,220,000 |
| NY |
1137 |
New York |
Rehabilitate
the Pines Bridge Road and Lake Avenue and Ryder Road, in Ossining, Yorkto,
and New Castle |
2,765,000 |
| CA |
1138 |
California |
Construct
Valley Boulevard Drainage Improvements, El Monte |
750,000 |
| NJ |
1139 |
New Jersey |
Route
82 Union County Streetscape and Intersection Improvements |
1,000,000 |
| NY |
1140 |
New York |
Short
Clove Road Rail Oveipass, Haverstraw |
1,000,000 |
| FL |
1141 |
Florida |
Construct
Atlantic Boulevard Improvements, Key West, Florida |
1,000,000 |
| CA |
1142 |
California |
Implement
intelligent management & logistics measures to improve freight movement,
Gateway Cities. |
3,000,000 |
| WI |
1143 |
Wisconsin |
Expand
USH 45 between CTH 0 and Winchester, Winnebago County, WI |
5,000,000 |
| NY |
1144 |
New York |
Implement ITS system and apparatus to enhance citywide |
100,000 |
| IA |
1145 |
Iowa |
Construct
IA-32 Arterialfrom US 20 in Dubuque Co, IA to US 61 and US 151 |
19,000,000 |
| HI |
1146 |
Hawaii |
Kapolei
Transportation Improvements, Island of Oahu |
1,000,000 |
| MA |
1147 |
Massachusetts |
Quincy Avenue Bridge
Replacement |
900,000 |
| CA |
1148 |
California |
Los
Angeles Regional Diesel Emissions Reduction Program For Engine Retrofit,
Gateway Cities |
500,000 |
| IL |
1149 |
Illinois |
Reconstruct
intersection of Wood Dale and Irving Park roads in DuPage County, IL |
12,300,000 |
| GA |
1150 |
Georgia |
Social
Circle bjpass completion, from Stanford Road to SR 11, Social Circle |
3,000,000 |
| GA |
1151 |
Georgia |
Streetscape
Project to install sidewalks and bicycle trails, Gray |
500,000 |
| MO |
1152 |
Missouri |
Reconstruction
of the Tucker Street Bridge in the City of St. Louis |
7,000,000 |
| PA |
1153 |
Pennsylvania |
Bethlehem
Pike improvements from Valley Green Road to South of Gordon Lane, Springfield
Township |
1,000,000 |
| GA |
1154 |
Georgia |
Construct
1-751-575 HOV interchange, Cobb County, Georgia |
600,000 |
| IL |
1155 |
Illinois |
Construct
multi-use pedestrian path between Oakton St. and Dempster St., Skokie |
250,000 |
| AZ |
1156 |
Arizona |
Construct link from Twin Peaks Road to 1-10 and Linda Vista |
5,000,000 |
| PA |
1157 |
Pennsylvania |
Design,
engineering, ROW acquisition & construction of streetscapping
enhancements, paving, lighting, safety improvements,
parking & roadway redesign in Nevqort Township, Luzerne County |
200,000 |
| VA |
1158 |
Virginia |
Fries
Train Station and Trail— restoration offormer train station for use as
visitors center and construction of trail along New
River |
1,000,000 |
| PA |
1159 |
Pennsylvania |
Construction
SR 3024,Middle Creek Bridge IL South Canaan, Wayne County |
700,000 |
| WI |
1160 |
Wisconsin |
Expand
USH 141 between STH22 and STH 64 (Oconto and Marinette Counties, Wisconsin) |
2,000,000 |
| IL |
1161 |
Illinois |
Development
of a coordinated trail system, parking and trial systems in Dixon, IL |
3,200,000 |
| PA |
1162 |
Pennsylvania |
Installation
of comprehensive signage system across 1700 acres of urban parks in
Pittsburgh |
900,000 |
| GA |
1163 |
Georgia |
Interstate
75/ Windy Hill Road Interchange |
2,000,000 |
| NJ |
1164 |
New Jersey |
Bridge
replacement and SR3J widening over the Raritan Valley Line in Glen Garnder,
Hampton, Hunterdon County |
1,000,000 |
| VA |
1165 |
Virginia |
Bristol
Train Station — historic preservation and rehabilitation offormer Bristol, VA
train station |
500,000 |
| CO |
1166 |
Colorado |
1-25
Improvements - Douglas - Arapahoe County Line to El Paso County Line |
4,000,000 |
| TN |
1167 |
Tennessee |
Reconstruct
connection with Hermitage Avenue to Cumberland River Bluff in Nashville |
500,000 |
| IL |
1168 |
Illinois |
For Village of Lemont to construct a bridge over Chicago |
100,000 |
| OH |
1169 |
Ohio |
Construct
roadway improvement along State Route 62 in Berlin |
100,000 |
| NY |
1170 |
New York |
Reconstruction
and improvements of University Avenue and the extension of the ARTWa1k
project, Rochester |
2,000,000 |
| NH |
1171 |
New Hampshire |
Reconstruction
and Improvements to NH Route 110 in Berlin |
2,000,000 |
| PA |
1172 |
Pennsylvania |
Route
6 Resurfacingfrom Mansfield Borough in Richmond Township to the Village of
Mainesburg in Sullivan Township |
1,000,000 |
| WA |
1173 |
Washington |
SR
167—Right of way acquisition for a new freeway connecting SR 509 to SR 161 |
2,500,000 |
| MD |
1174 |
Maryland |
1-70: Frederick |
3,000,000 |
| NY |
1175 |
New York |
Planning
and Construction of Fort Drum Connector Rd |
6,000,000 |
| CA |
1176 |
California |
Study
and construct highway alternatives between Orange and Riverside Counties,
directed by RCTC, working with local transp.
authorities, and guided by the current MIS |
10,000,000 |
| CA |
1177 |
California |
Fresno
County, CA Widen Friant Road to four lanes with class II bicycle lanes |
1,500,000 |
| MO |
1178 |
Missouri |
Study
for Highway 160 & Kansas Expressway Corridor |
2,000,000 |
| FL |
1179 |
Florida |
Construct
Route 9Bfrom US] to Route 9A (1-295) to the Duval County line |
5,000,000 |
| PA |
1180 |
Pennsylvania |
Design,
const. widening of PA 94 from York-Adams County line to Elm Street in
Hanover, PA |
3,000,000 |
| CA |
1181 |
California |
Improvement
of intersection at Burbank Blvd. and Woodley Ave |
160,000 |
| NY |
1182 |
New York |
1-81
Corridor Improvements in Syracuse, NY |
2,000,000 |
| WA |
1183 |
Washington |
Perform
final interchange design and property acqusition at Fleshman Way where it
crosses SR 129, that enhances safety and passenger
and freight mobility and reduces congestion |
1,050,000 |
| WA |
1184 |
Washington |
Roosevelt
Extension at Urban Avenue to Cameron Way in Mount Vernon |
4,000,000 |
| NJ |
1185 |
New Jersey |
Hazel
Street reconstruction, Passaic County |
2,250,000 |
| FL |
1186 |
Florida |
Improvements
to Eller Drive including right-of-way acquisition and construction of return
loop connector |
1,000,000 |
| MO |
1187 |
Missouri |
Study Highway 3
7-60 Entire Corridor |
2,500,000 |
| TX |
1188 |
Texas |
The
District-Tyler Outer Loop 49 Construction |
5,880,000 |
| PA |
1189 |
Pennsylvania |
Tidal
Schuylkill Riveifront project consists of an eight mile bike and pedestrian
recreation trailfrom Locust Street to Historic
Bartram ‘s Gardens |
1,680,000 |
| NY |
1190 |
New York |
Town of
Fishkill reconstruct Maple Ave |
24,500 |
| IL |
1191 |
Illinois |
For
IDOT to expedite pre-construction and construction to widen 1-55 from
Naperville Road south to 1-80 |
3,500,000 |
| UT |
1192 |
Utah |
200 East
Minor Arterial, Logan City, Utah |
900,000 |
| NJ |
1193 |
New Jersey |
Construct
1-287, 1-80, Route 202 Interchange |
1,000,000 |
| NY |
1194 |
New York |
Design
and construction of Fulton Street from Clinton Avenue to Bedford Avenue in
Brooklyn, New York |
5,600,000 |
| TX |
1195 |
Texas |
Port
of Corpus Christi Joe Fulton International Trade Corridor for congestion and
safety enhancements |
500,000 |
| MO |
1196 |
Missouri |
Renovations and Enhancements on the Bicycle Pedestrian |
800,000 |
| CT |
1197 |
Connecticut |
Construct
Shoreline Transportation Enhancement Projects, Guilford, Branford, East Haven
|
2,000,000 |
| NJ |
1198 |
New Jersey |
Highway
Improvements in Liberty Corridor |
5,000,000 |
| OH |
1199 |
Ohio |
Construct
SR 104 into a 4 lane facility with a turning lane in Ross County |
6,000,000 |
| MO |
1200 |
Missouri |
CONSTRUCT2
LANES ONHWY 45 FROMHWY9 TO GRADENROAD INPLAJ7’E COUI’IlT |
3,000,000 |
| MS |
1201 |
Mississippi |
Plan
and Construct Highway 45 Bypass in Columbus |
4,000,000 |
| PA |
1202 |
Pennsylvania |
Reconstruct
hy & replace of bridge on US 422 between the Berks County Line and the
Schuylkill River in Montgomeiy and Chester
Counties |
1,500,000 |
| FL |
1203 |
Florida |
Construct
SR 20 connection to SR 100 via CR 309-C, Putnam County, Florida |
4,300,000 |
| OH |
1204 |
Ohio |
Road
and related pedestrian improvements at SR 283 in the Village of Grand River,
OH |
100,000 |
| NY |
1205 |
New York |
Road
infrastracture projects to improve commercial access in the Towns of Malta
and Stiliwater and the Village of Round Lake,
Saratoga County, New York |
8,150,000 |
| NY |
1206 |
New York |
Replace
structurally deficient bridge over the Pocantico River, the Village of
Pleasantville |
1,000,000 |
| IL |
1207 |
Illinois |
Complete
Heavy Truck Loop for DuQuoin Industrial Park |
625,000 |
| MD |
1208 |
Maryland |
Construction
and dualization of US 113 |
15,000,000 |
| GA |
1209 |
Georgia |
Streetscape-Quitman |
200,000 |
| NY |
1210 |
New York |
Town
of New Windsor Toleman & Station Roads Reconstruction and area
Improvements |
715,000 |
| IL |
|