House TEA LU - FHWA High Priority Project Earmarks - 2005 (109th Congress)
California Earmarks for High Priority Projects Specified in TEA LU Bill (H.R. 3), As Approved by House T&I Committee in Manager's Amendment, 3/2/2005
No.  Project Amount
1043 Widen State Route 46 between Airport Road and the Shandon Rest Stop in San Luis Obispo County 33,461,000
2051 Improve interstates and roads part of the Inland Empire Goods Movement Gateway project in and around the former Norton Air Force Base 25,000,000
1812 Upgrade and reconstruct the I-80/I-680/SR12 Interchange, Solano County 21,000,000
2296 Widen Caflfornia State Route l32 from California State Route 99 west to Dakota Avenue 18,000,000
2178 Alameda Corridor East Gateway to America Trade Corridor Project, Highway-Railgrade separation along 35 mile corridor from Alameda Corridor (Hobart Junction) to Los Angeles/San Bernardino County Line 15,500,000
733 Upgrade CA SR 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County 15,000,000
2444 Widen Highway 101 in Mann and Sonoma Counties from Hwy 37 in Novato to Old Redwood Highway in Petaluma 15,000,000
2128 Construct grade separation on State College Blvd. at the Burlington Northern Santa Fe railroad, Fullerton 14,000,000
587 Diamond Bar On-Off Ramp at Lemon Ave on SR-60 12,000,000
1367 Modify 1-880 & Stevens Creek Boulevard Interchange to ease traffic congestion in San Jose 12,000,000
1793 Reconfigure intersection at Highways 152 and 156 in Santa Clara County 10,650,000
429 Seismic retrofit of the Golden Gate Bridge 10,000,000
954 Construct a new interchange where 1-15 meets Cajalco Road in Corona, CA 10,000,000
1176 Study and construct highway alternatives between Orange and Riverside Counties, directed by RCTC, working with local transp. authorities, and guided by the current MIS 10,000,000
1988 The Foothill South Project, construct 16 miles of a six-lane limited access highway system 10,000,000
926 Construct highway connecting State Route 78/86 and State Route 111, Brawley 9,500,000
1511 Freeway 180 Improvements Fresno 9,500,000
2813 Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego 9,000,000
1957 Pine Avenue extension from Route 71 to Euclid Avenue in the City of Chino 8,500,000
359 Reconstruct 1-880 & Coleman Avenue Interchange & implement other 1-880 Corridor operational improvements in Santa Clara County 8,000,000
2158 Construct Interchange at Intersection of SR 44 and Stillwater Road 8,000,000
2433 Implement San Francisco Street Improvements Program 8,000,000
2788 Design and construct access improvements in North Central Business District, Sacramento 8,000,000
2644 Forest Highway 171 Upper Skyway Improvement 7,250,000
2631 Widen Peyton Dr.from Grand Ave. to Chino Hills Pky., construct Eucalyptus Ave. from Peyton Dr. to Galloping Hills, improve English Channel 7,036,110
420 Folsom Blvd. Transportation Enhancements, City of Rancho Cordova 7,000,000
1440 Reconfigure San Fernando Road from Fletcher Drive to I-5 Fwy, Los Angeles 7,000,000
1943 Construct Guadalupe River Trail from 1-880 to Highway 237 in Santa Clara County 7,000,000
346 Road widening, construct bike path, lighting, and safety improvements on road leading to Hansen Dam Recreation Area, Los Angeles 6,500,000
3132 Improvements/Widenening of SR 99 from Goshen to Kingsburg in Tulare County, California 6,200,000
706 Bay Road improvements between University Avenue to Fordham, and from Clarke Avenue to Cooley Landing. Northern access improvements between University and Illinois Avenues, East Palo Alto 6,000,000
1239 Complete Monterey Bay Sanctuary Scenic Trail between Monterey and Santa Cruz counties 6,000,000
2149 Replace SR22 interchanges, construct HOV lanes, and lengthen bridges in Garden Gove 6,000,000
2606 Replace South Access to the Golden Gate Bridge—Doyle Drive 6,000,000
2735 SR 52 East Improvments (San Diego) 6,000,000
3120 Completion of Interstate 5 and Interstate 8 Connectors, San Diego 6,000,000
1214 Golden Gate National Parks Conservancy—Plan andImplement Trails & Bikeways Plan for the Golden GateNational Recreation Area and Presidio 5,200,000
2577 Widen 1-5 to 10 Lanes and Improve Corridor Arterials, SR 91 to 1-710 5,200,000
278 Widening the highway and reconstructing off ramps on Hwy 101 between Steele Lane and Windsor, CA to reduce traffic and promote carpools 5,000,000
525 Construct Route 101 Auxiliary Lanes 3rd Ave in the City of San Mateo to Millbrae Ave in Millbrae 5,000,000
866 Planning, design, engineering and construction of Naval Air Station, North Island access tunnel on SR 75-282 corridor, San Diego 5,000,000
943 US 101 Operational Improvements, San Jose 5,000,000
1040 Widen State Route 98 from Route _ to State Route 7, Calexico 5,000,000
1081 Widen SR 12 to four lanes through Jamieson Canyon (between 1-80 and SR 29) for safety concerns and economic growth 5,000,000
1134 Improvements to SR-67, Mapleview to Dye Road (San Diego) 5,000,000
1237 Interstate 15-Base Line Road Interchange Project, Rancho Cucamonga, Calfornia 5,000,000
1342 Construction of freeway between 1-15 and US-395 5,000,000
1558 Install new grade separation at Ranchero Road in Hesperia 5,000,000
1653 Engineering, right of way and construction of HO V lanes on I- 580 in the Livermore Valley, Caflfornia 5,000,000
1930 Conduct study and construct CA State Route 239 from State Route 4 in Brentwood area to 1-205 in Tracy area 5,000,000
2067 Complete the engineering design and acquire the right-of-way needed for the Arch-Sperry project in San Joaquin County 5,000,000
2080 Reduce congestion and boost economies through safer access to the coast by realigning Hwy 299 between Trinity and Shasta Counties 5,000,000
2245 US 101 Corridor Improvements — Route 280 to the Capitol- Yerba Buena Interchange 5,000,000
2719 State Route 76 Road Widening, Melrose Drive to Interstate 15 5,000,000
2749 Construct bypass along Hwy 101 around Willits, CA to reduce congestion, improve air quality and enhance economic lifeline of No. Coast 5,000,000
2821 Conduct study and construct Daggett Road, Port of Stockton, CA, Access Project 5,000,000
2885 1-110/SR 47/Harbor Blvd. Interchange Improvements, San Pedro 5,000,000
3092 Develop bicycle paths and public park space adjacent to the New River, Calexico 5,000,000
3099 Modify and reconfigure Kanan Road interchange along US101 in Agoura Hills 5,000,000
3244 Implement SFgo Van Ness Corridor Improvements 5,000,000
2640 Reconstruct and deep-lift asphalt on various roads throughout the district in Ventura County 4,856,000
2639 Port of Hueneme Intermodal Access Improvement Project, including grade separation at Rice Avenue and State Route 34; widen Hueneme Road 4,700,000
15 Reconstruct and deep-lift asphalt on various roads thorughout the district in Santa Barbara County. 4,644,000
143 State Route 86S and Ave 66 highway safety grade separation 4,500,000
2515 Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the City of Los Angeles 4,250,000
511 Mission Boulevard / State Route 71 Interchange—Corridor Improvements 4,200,000
46 Douglas St. Improvements, El Segundo 4,000,000
216 Construction of Cross Valley Connector between 1-5 and SR 14 4,000,000
702 San Diego, CA Construction of the 1-5 and SR-56 Connectors 4,000,000
1051 Widen State Route 262, replace two railroad overpass structures, and rebuild on and off ramps between SR 262 and Kato Rd. in Fremont 4,000,000
1321 Compton Arterial Reconstruction and Improvement Program, Compton 4,000,000
1700 Rehabilitation of Tulare County Farm to Market road system 4,000,000
1775 Construct Full access Interchange at SR 120, McKinley Avenue, aith auxiliary lanes, Manteca 4,000,000
1990 State Route 99 improvements at Sheldon Road 4,000,000
2172 Oregon-Page Mill expressway Improvements between USlO] and SR 82, Palo Alto 4,000,000
2198 Avalon Boulevard/I-405 Interchange moc4flcation project, Carson 4,000,000
2655 Construct truck lane from Britannia Blvd. to the Otay Mesa Port of Entry, San Diego County 4,000,000
3206 Interstate 5 and State Route 78 Interchange Improvements 4,000,000
3139 Improve Access Road to Beale Air Force Base (Smartville Road) 3,750,000
1666 Passons Grade Separation in the City of Pico Rivera 3,700,000
719 State Route 1 improvements between Soquel and MorrisseyBlvd including merge lanes and the La Fonda overpass, Santa Cruz 3,670,000
1335 Construct new interchange and related road improvements on US101 near Airport Blvd, Salinas 3,670,000
2227 4 lane widening/safety improvements on State Route 25 from Hollister to Gilroy 3,660,000
2024 Realignment of La Brea Avenue to reduce congestion 3,640,000
2906 Improvement of intersection at Inglewood Ave and Marine Ave to reduce congestion 3,600,000
287 Rehabilitation, repair, and/or reconstruction of deficient two- lane roads that connect to Interstate 5, SR 180, SR 41 and SR 99 countywide, Fresno County 3,500,000
1297 Almaden Expressway Improvements between Branham Lane and Blossom Road, San Jose 3,500,000
1942 El Camino Real Grand Blvd Initiative in San Mateo County 3,500,000
1092 Widen Santa Maria River Bridge on US. Highway 101 between Santa Barbara County and San Luis Obispo County 3,400,000
1565 Interchange improvements at Rice Avenue and US. Highway 101 in the City of Oxnard 3,300,000
3239 Reconstruct Atlantic Ave. and improve drainage from Ardmore St. to Imperial Hwy South Gate 3,250,000
3269 Implement Northwest San Fernando Valley Road and Safety Improvements 3,056,000
51 Route 1 San Pedro Creek Bridge replacement in Pacifica 3,000,000
234 Widen SR89 at existing “mousehole” two lane RR underpass 3,000,000
340 Santa Anita Avenue Corridor Imp rovement project, Arcadia 3,000,000
427 Implement streetscape project on Central Avenue from 103rd Street to Watts/103rd Street Station, Watts 3,000,000
526 Solano County Cordellia Hill/ Sky Valley, transportation enhancement project, including upgrade of pedestrian and bicycle corridors 3,000,000
592 Reconstruct interchange for south-bound traffic entering 1-80 from Central Avenue, City of Richmond 3,000,000
688 Widen Wilmington Ave from 223rd street including ramp modfications, Carson 3,000,000
1039 Widen State Route 98, including storm drain developments, from Kloke Road to State Route ill, Calexico 3,000,000
1085 Widen South Main St.-Soda Bay Rd. between CR 400A (mile marker 0. 0-miler marker and 0.7) and CR 502 (mile marker 0.0 and 0.9) 3,000,000
1142 Implement intelligent management & logistics measures to improve freight movement, Gateway Cities. 3,000,000
1257 Central Galt & State Route 99 Interchange and Access Improvements 3,000,000
1401 Reconstruct Long Beach Bl. with medians and improve drainage from Palm Av. to Tweedy BI. in Lynwood 3,000,000
1408 Construction of an interchange located at the intersection of .iture State Route 65 and Ferrari Ranch Road- Westwood in Placer County 3,000,000
1421 Development and construction of improvements to State Route 79 in the San Jacinto Valley 3,000,000
1639 Resurface and construct truck lane at CA Hwy 94 and Interstate 8 interchange, Boulevard 3,000,000
1680 Implement Grove Avenue Corridor Interstate 10 interchange improvements in Ontario 3,000,000
1920 Reconstruct and widen Del Amo Blvd to four lanes between Normandie Ave and New Hampshire Ave, Los Angeles County 3,000,000
2116 Route 198 Expansion, from SR 99 to SR43 3,000,000
2193 710 Freeway Study to Evaluate Technical Feasibility and Impacts of a Tunnel Alternative to Close 710 Freeway Gap 3,000,000
2194 Greenleaf Right of Way Community Enhancement Project-design and construct bikeways, pedestrian walkways and upgrade signalization Compton 3,000,000
2246 Rancho Vista Blvd Widening Project 3,000,000
2333 Construct and repair lining in/our tunnels on Kanan, Kanan Dume, and Malibu Canyon Roads between US1 and US1O1 3,000,000
2758 Hazel Avenue Improvements, US. Highway 50 to Madison Avenue 3,000,000
2819 Rosecrans Avenue and Bridge Arterial Reconstruction Project, Compton 3,000,000
2861 Construct off ramp at Interstate 8/Imperial Avenue Interchange, El Centro 3,000,000
2882 Construct Bristol Street multi-modal corridor in Santa Ana 3,000,000
3085 Widen and reconstruct Washington Blvd from westerly city boundary at Vernon to I-5 at Telegraph Rd in Commerce 3,000,000
3098 Construct Cypress Avenue over-pass to separate Interstate 10 and Union Pacific Railroad tracks in Fontana 3,000,000
3203 Widen and realign Cherry Avenue from 19th Street to one block south of Pacific Coast Highway, Signal Hill 3,000,000
3280 Construct Western Placerville Interchanges on State Route 50 3,000,000
391 I-1O and Indian Ave Interchange, Palm Springs 2,750,000
1369 Palm Drive & Interstate 10 interchange project 2,750,000
3069 Widen and reconfigure Sepulveda & Culver Boulevards, Culver City 2,740,000
124 Landscaping Enhancements Along Ronald Reagan Freeway Route 118 for aesthetic purposes 2,500,000
184 Reconstruct segments ofHollister Avenue between San Antonio Road and State Route 154 in Santa Barbara County 2,500,000
191 Construct a 2.8 mile bikeway along Lambert Roadfrom Mills Ave. to Valley Home Ave. in the City of Whittier 2,500,000
450 Conduct project design and environmental analysis of Heritage Bridge on Heritage Road linking Chula Vista to Otay Mesa 2,500,000
498 Mariposa County, CA Improve 16 roads, bridge and one bike path 2,500,000
518 Construct pedestrian enhancements on Broadway in Los Angeles 2,500,000
58 Tuolumne, Stanislaus and Merced Counties Upgrade existing county highway, J59 2,500,000
1218 Upgrade and reconstruct 1-580/ Vasco Road Interchange, City of Livermore 2,500,000
1355 Coyote Creek Trail Project — Story Road to Montague Expressway 2,500,000
1481 Construct truck lane on Keystone Roadfrom State Route 111 to Austin Road, Imperial County 2,500,000
1904 Reconstruct Azusa Ave and San Gabriel Ave for two-way traffic in Azusa 2,500,000
2017 Construct the Silicon Valley Transportation Incident Management Center in San Jose 2,500,000
2131 Construct operational and safety improvements to 1-880 N at 29th Ave in Oakland 2,500,000
4 Build a pedestrian bridge from Hiller Street to the Bay Trail, Belmont 2,450,000
284 Implement Southwest San Fernando Valley Road and Safety Improvements 2,300,000
961 Construction of CA 101 Auxiliaiy Lanes, Marsh Rd. to Santa Clara County Line 2,250,000
950 Widen Interstate 8 overpass at Dogwood Road, Imperial 2,122,500
35 Replace structurally unsafe Winters Bridge for vehicles, bicycles and pedestrians between Yolo and Solano Counties. 2,000,000
254 Construct Coyote Creek Trail Project from Story Road to Montague Expressway in San Jose 2,000,000
260 Escondido Construction of Bear Valley Pkwy, East Valley Pkwy 2,000,000
297 Study of Thomas Bridge to meet future cargo and passenger traffic needs of the ports ofLong Beach and Los Angeles 2,000,000
300 Mount Vernon Avenue grade separation and bridge expansion in Colton 2,000,000
479 Widen Firestone Blvd between Ryerson Blvd and Stewart and Gray Road in Downey 2,000,000
485 Widen Lakewood Blvd between Telegraph Rd and Fifth St in Downey 2,000,000
517 Carlsbad, CA Construction of Poinsettia Lane 2,000,000
563 Improvement of intersection at Aviation Blvd. and Rosecrans Ave. to reduce congestion (Hawthorne) 2,000,000
574 Construct 1-605 Interchange Capacity Improvements in Irwindale 2,000,000
1230 Modesto, Riverbank & Oakdale, CA Improve SR219 to 4- lanes 2,000,000
1261 Establish new grade separation at Sunset Ave in Banning 2,000,000
1286 South Bay Cities COG Coastal Corridor Transportation Initiative, Phase 3, El Segundo 2,000,000
1296 Long Beach Intelligent Transportation System: Integrate functioning traffic management center that includes the port, transit, airport as well as the city’s police and fire departments, Long Beach 2,000,000
1316 Widen and Improve County Line Road in Calimesa 2,000,000
1387 Reconstruct interchange at I-1O and Riverside Avenue to improve traffic in Rialto 2,000,000
1402 Expand carsharing pilot program to serve low- and moderate- income neighborhoods in the City and County of San Francisco 2,000,000
1590 Interstate 15 and State Route 79 South Freeway Interchange and Ramp Improvement Project 2,000,000
1665 Conduct Study of SR 130 Realignment Project, San Joaquin County & Santa Clara County, CA 2,000,000
1696 Reconstruction of The Strand in the City of Manhattan Beach to improve beach access and accommodate increased pedestrian traffic 2,000,000
1740 Construct earthen berm along Esperanza Road from Yorba Linda Blvd. to the west city limits to mitigate noise 2,000,000
1821 Construct an Interchange on Highway 70 at Georgia Paciflc Road in Oroville 2,000,000
1830 City of Madera, CA Improve SR99-SR145 Interchange 2,000,000
1841 Ramona Avenue Grade Separation, Montclair, Calzfornia 2,000,000
2153 Design and construct new interchange at Potrero Blvd and State Route 60 in Beaumont 2,000,000
2192 Construction of traffic and pedestrian safety improvements in Yucca Valley 2,000,000
2254 Monte Vista Avenue Grade Separation, Montclair, Cahfornia 2,000,000
2279 Install Central Ave Historic Corridor comprehensive streetscape improvements thus improving traffic, ped safety, and economic development, Los Angeles 2,000,000
2399 Improve access to 1-80 at Eureka Road Interchange 2,000,000
2402 Interstate 15, California Oaks Road Interchange Project 2,000,000
2476 Enhance pedestrian environment and increase safety along Olympic Blvd between Vermont and Western Avenues, Los Angeles 2,000,000
2489 Upgrade essential road arterials, connectors, bridges and other road infrastructure improvements in the Town of Desert Hot Springs, CA 2,000,000
2499 Improvements to Ben Maddox Way Bridge 2,000,000
2684 Hwy 199 Narrow Enhancement to reduce active slides that cause signflcant road closures on primary connecting route from US 101 to 1-5 2,000,000
2826 Construct grade separation on State Street and Cajon Boulevard along BNSF tracks in San Bernardino 2,000,000
2856 Realign SR 4 within the City of Oakley 2,000,000
3018 Valley Boulevard Capacity Improvement between 710 Freeway and Marguerita Avenue, Alhambra 2,000,000
3074 Olsen Road widening and roadway improvements in Simi Valley, CA 2,000,000
3086 San Diego, CA Interstate 5, Sorrento Valley Road and Genesee Avenue Interchange Project 2,000,000
3140 Interstate 215, Los Alamos Road Interchange Project 2,000,000
3220 Upgrade Japson Parkway at North and South Gates of Travis Air Force Base and widen Vanden Road segment, Solano County 2,000,000
219 Soundwall construction on the 210 Freeway, Pasadena 1,800,000
337 Construct interchange on US 50 at Empire Ranch Road in Folsom 1,800,000
430 Upgrade and extend Commerce Avenue, City of Concord 1,750,000
2484 Reconstruct Interstate 880-Route 92 interchange in Hayward 1,750,000
1610 Reconstruct Whittier Blvd. and improve parkway drainage from Philadelphia Av. to Five Points in Whittier 1,700,000
1915 Construct and improve medians and drainage on Imperial Highway from west border to east border of city in La Mirada 1,700,000
1564 Add turn lane and adaptive traffic control system at intersection of San Tomas Expressway and Hamilton Avenue in Campbell 1,600,000
3000 Diamond Bar, CA Grand Avenue Rehabilitation 1,600,000
2 Develop and implement ITS master plan in Anaheim 1,500,000
465 I-S Santa Clarita-Los Angeles Gateway Improvement Project 1,500,000
509 Scenic preservation and run-off mitigation in the SantaMonica Mountains National Recreation Area near PCH and US 101 1,500,000
823 Construct Inland Empire Transportation Management Center in Fontana to better regulate traffic and dispatch personnel to incidents 1,500,000
917 Widening Avenue 416 in Dinuba California 1,500,000
1177 Fresno County, CA Widen Friant Road to four lanes with class II bicycle lanes 1,500,000
1744 Construct 1-80 Gilman Street interchange improvements in Berkeley 1,500,000
2340 Construct truck ramp linking Interstate 5 to the National City Marine Cargo Terminal, National City 1,500,000
2805 Establish 1-15 Interchange at Nisqualli and Mojave River crossing in San Bernardino County 1,500,000
2934 Construction of Lenwood Road Grade Separation in Barstow, 1,500,000
319 Improve traffic safety, including streetlights, from Queen to Barclay to Los Angeles River to Riverside in Elysian Valley, Los Angeles 1,400,000
2176 Construct road surface improvements, and improve road safety from Brawley Water plant to HWY 86 to 9th Street to 18th Street, Brawley 1,400,000
2713 Conduct necessary planning and engineering and implement comprehensive Corridor Management Plan for Arroyo Seco Historic Parkway, Los Angeles 1,400,000
2288 Reconstruct Paramount Bl. with medians and improve drainage from north border to south border of city in Lakewood 1,350,000
884 Design Traffic Flow Improvements Azusa and Amar, City of West Covina 1,250,000
971 Realign First St between Mission Rd and Clarence St in Los Angeles 1,250,000
317 Construct one additional all purpose lane in each direction on 1405 and provide additional capital improvements from SR73 through the LA County line 1,210,000
180 Implement streetscape improvements on segments of Laurel Canyon Blvd. and Victory Blvd. in North Hollywood 1,200,000
1371 Construct 1-580 Interchange Improvements in Castro Valley 1,200,000
1601 Transportation enhancements to Children Museum of Los Angeles 1,200,000
1903 Randolph St improvements between Wilmington Ave and Fishburn Ave in Huntington Park 1,200,000
1093 Widen San Fernando Road North, including streetscape projects, Sylmar 1,060,000
246 Operations and management improvements, including ITS technologies, on US. Highway 101 in Santa Barbara County 1,000,000
253 Quincy-Oroville Highway Rehabilitation in Plumas County 1,000,000
266 Reconstruct 1-710 southern terminus off ramps, Long Beach 1,000,000
572 Shoal Creek Pedestrian Bridge (San Diego) 1,000,000
618 Grade Separation at 32nd Street between 1-15 and Harbor Drive, San Diego 1,000,000
624 Begin construction of road from US-395 west towards SR-14 1,000,000
701 Develop and implement traffic calming measures for traffic exiting the I-710 into Long Beach 1,000,000
726 Grade Separation at Vanowen and Cliveborne, Burbank 1,000,000
740 Design and environmental analysis for State Route 11 connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego. 1,000,000
867 Construct road from Mace Blvd in Yolo County to federally supported Pacflc Flyway wild4fe area 1,000,000
882 Reconstruct Eastern Ave from Muller St to Watcher St in Bell Gardens 1,000,000
896 Colima Road at Fullerton Road Intersection Improvements 1,000,000
951 Improve bridge 58-7 on SR 115 that crosses the Alamo River in Holtville and also project design and environmental ananlysis of a new bridge over the same river 1,000,000
1256 San Diego, CA Interstate 15 Managed Lanes 1,000,000
1509 Construction of new roadway lighting on major transportation corridors in the Southwest San Fernando Valley 1,000,000
1557 Improve 1-8 off ramp at Ocotillo to the Imperial Valley College Desert Museum/Regional Traveler Visitor Center, Imperial County 1,000,000
1662 City ofRedondo Beach Esplanade Improvement Project 1,000,000
1759 Highways 152 -156 Intersection improvements, CA 1,000,000
1778 Conduct Study and Construct 1205 Chrisman Road Interchange Project, Tracy, CA - 1,000,000
2018 Design and Construction Camino Tassajara Crown Canyon to East Town Project, Danville, CA 1,000,000
2055 Construction of an interchange at Lammers Road and 1-205, Tracy, CA 1,000,000
2084 Construct Alviso Bay Trail from Gold Street in historic Alviso to San Tomas Aquino Creek in San Jose 1,000,000
2089 Vasco Road Safety Improvements, Contra Costa Transportation Authority and the County of Alameda Public Works, Calfornia 1,000,000
2147 Construction of new roadway lighting on major transportation corridors in the Northwest San Fernando Valley 1,000,000
2174 Park Boulevard-Harbor Drive Rail Grade Separation, San Diego 1,000,000
2209 Construct 1-80 HOV lanes and interchange in Vallejo 1,000,000
2233 Interstate 15 and Winchester Road Interchange Project 1,000,000
2278 Construct safe routes to school in Chertyland and Ashland 1,000,000
2293 Widen and make ITS improvements on Paramount Blvd between Telegraph Rd and Gardendale St in Downey 1,000,000
2352 Improve 1-8 off ramp to the Desert Farming Institute, Imperial County 1,000,000
2369 Construct fourth bore of Caldecott Tunnel on SR 24, California 1,000,000
2448 Widen 1-238 between 1-580 & 1-880 in Alameda County 1,000,000
2479 Construct landscape medians along Skyline Drive from Sears Avenue to 58th Street, San Diego 1,000,000
2514 Widen Atlantic Bl bridge over the Los Angeles River in Vernon 1,000,000
2543 State Route 86S and Ave 50 highway safety grade separation 1,000,000
2663 Purchase of Rosemead Blvd ROW, Temple City 1,000,000
2701 Construct Route 101 bicycle/pedestrian overpass at Millbrae Ave for the San Francisco Bay Trail 1,000,000
2843 Crenshaw Blvd. Rehabilitation, Maricopa St. to Sepulveda Blvd., City of Torrance 1,000,000
2849 Improve pedestrian and biking trails within East Bay Regional Park District, Contra Costa County 1,000,000
2932 Construct 213th Street pedestrian bridge to provide safe passage for pedestrians and wheelchairs, Carson 1,000,000
3133 Design and implement Harbor Boulevard ITS in Garden Grove 1,000,000
3184 Construct parking facility and improve museum pedestrian access from trolley station, San Diego 1,000,000
3209 Highway 74 and Interstate 215 Interchange Project 1,000,000
3229 Construction and enhancements of trails in the Santa Monica Mountains National Recreation Area 1,000,000
3285 Improve access from 1-8 and construct parking lot for the Imperial Sand Dunes Recreation Area Visitor’s Center, Imperial Valley 1,000,000
3313 San Diego, CA Construction of North Coast Interstate 5 1,000,000
480 Construct Air Cargo Access Road to Oakland International Airport. 900,000
3022 Valley View/Stage Grade Separation Project, La Mirada and Santa Fe Springs, California 900,000
1307 Construct sound barriers at the I-805/S.R. 54 Interchange, National City 850,000
2626 Construct Cabot-Camino Capistrano Bridge Project and related roadway improvements in Cities of Mission Viejo and Laguna Niguel, California 838,690
43 Roadway surface improvements, street lighting, and storm drain improvements to South Center Street from Baughman Road to State Route 78/86, Westmorland 800,000
595 Street Closure at Chevy Chase Drive, Glendale 800,000
2157 Crenshaw Blvd. Rehabilitation, 182nd St. -190th St., and Crenshaw Blvd. at 182nd St. Fvy on-off Ramp Capacity Enhancement, City of Torrance 800,000
308 Streetscape improvements at East 14th St-Mission Blvd in Alameda County 750,000
709 Construct bicycle and pedestrian bridge between Oyster Bay Regional Park in San Leandro and Metropolitan Golf Course in Oakland 750,000
806 Replace 1-880 overpass at Davis St in San Leandro 750,000
984 Construct oveFpass on Central Ave at the railroad crossing in Newark 750,000
1138 Construct Valley Boulevard Drainage Improvements, El Monte 750,000
1407 Construct Traffic flow improvements Vincent and Lakes Drive, West Covina 750,000
357 Construct new left turn lane at State Route 19 and Teistar in El Monte 700,000
1414 Rio Vista Bridge Realignment Study & Street Sign Safety Program 700,000
881 North Atlantic Pedestrian Bridge, Monterey Park 600,000
1390 Reconstruct Paramount Blvd. with medians and improve drainage from Artesia Bi. to Candlewood St. in Long Beach 600,000
2699 Construct the Los Angeles River bicycle and pedestrian path in the San Fernando Valley 575,000
2162 Construct truck lane on Baughman Roadfrom State Route 78/86 to Forrester Road, Westmorland 550,000
1 Construct safe access to streets for bicyclists and pedestrians including crosswalks, sidewalks and traffic calming measures, Covina 500,000
28 Huntington Beach, Remove off-ramp on 1-405 at Beach Blvd. Construct fourth lane on 1-405 North, at the Beach Blvd. interchange 500,000
90 San Diego River Multiuse Bicycle and Pedestrian Path 500,000
134 Improvement of intersection at Balboa Blvd. and San Fernando Rd 500,000
570 1-5 HOV improvements from Route 134 to Route 170 500,000
716 Conduct a Project Study Report for new Highway 99 interchange between SR 165 and Bradbury Road, serving Turlock/Hilmar region 500,000
855 Implement Riverside Avenue Railroad Bridge improvements, south of Interstate 10 in Rialto 500,000
1023 Implement Van Nuys Road and Safety Improvements 500,000
1148 Los Angeles Regional Diesel Emissions Reduction Program For Engine Retrofit, Gateway Cities 500,000
1285 Rehabilitate pavement on Azusa Avenue and San Gabriel Avenue in Azusa 500,000
1608 Project design, environmental assessment, and roadway construction of Lonestar Road from Alta Road to Enrico Fermi Drive San Diego County 500,000
1633 Conduct project report study on Old River School Rd — Firestone Blvd intersection reconfiguration 500,000
1697 Construction of new roadway lighting on major transportation corridors in the Northeast San Fernando Valley 500,000
1722 State Route 88 - Pine Grove Corridor Improvement Project 500,000
1767 Construct Hwy 101 bicycle-pedestrian project in Marin and Sonoma Counties from north ofAthenton Ave to south of Petaluma River bridge 500,000
1776 Install Emergency Vehicle PreemptionEQ along major arterials in the I 880 Corridor, A,ameda County 500,000
1780 Construction of Campus Parkway from State Route 99 to Yosemite Ave., Merced County 500,000
2378 Make traffic and safety improvements to Atlantic Blvd in Maywood 500,000
2427 US-395 Realignment and Widening Project 500,000
2542 Replace twin 2 lane bridge with single 4 lane bridge on SR 138 overBig Rock Wash 500,000
2618 Grade Separation at Cesar Chavez Parkway and Harbor Drive, San Diego 500,000
2762 Conduct traffic study ofproposed realignment of Nutwood Ave in Fullerton 500,000
2835 Provide landscape enhancement of an existing open culvert on Atherton Street, Long Beach 500,000
2883 Construct pedestrian sidewalk enhancements in Beliflower 500,000
3145 Citywide traffic signal upgrades requireing the installation of hardware and software at 9 major intersection, Palo Alto 500,000
3167 Construct grade separations at Washington Ave & UPRR crossing east and Washington Ave & La Cadena Drive in Colton 500,000
326 Construct a raised landscaped median on Alondra Blvd between Clark Ave and WoodruffAve in Beliflower 400,000
379 Construct Class I bike and pedestrian path from San Luis Obispo to Avila Beach 400,000
732 Riverside Drive Improvements, Los Angeles 400,000
1388 Reconstruct BloomfieldAv. with medians from Carson St. to north city limits in Hawaiian Gardens 400,000
1609 Project Study Reports for 1-105 and 1-405 Interchanges at Los Angeles International Airport 400,000
1770 Extension of a regional Class I bikeway from the West City limits to the East City limits along leased railroad right-of- away 400,000
1816 Improvement of intersection at Burbank Blvd. and Hayvenhurst Ave 400,000
1933 Construct two right hand turn for Byzantine Latino Quarter transit plazas at Normandie and Pico, and Hoover and Pico, Los Angeles 400,000
1955 Improvements to US-101 ramps between Winnetka Ave. and Van Nuys Blvd 400,000
2651 Construct crosswalk bump-outs and related streetscape improvements on Temple St between Hoover St and Glendale Blvd. Los Angeles 400,000
3126 Reconstruct Rosecrans Av. And construct bus pads from Garfield to Century Bl. In Paramount 400,000
84 Adams Street Rehabilitation Project, Glendale 388,000
3066 Construct parking facility and improve access to Imperial Vally Expo 377,500
2517 Widen Maine Avenue in Baldwin Park 375,000
1274 Upgrade Bellflower intersections at Alondra Blvd and at Rosecrans Ave in Bellflower 350,000
1883 Planning for Orange Line Mag Lev from downtown Los Angeles to central Orange County 350,000
122 Willow and Herndon Traffic Flow Improvements, City of Clovis 300,000
167 Construct pedestrian, bicycle and ADA accessible boardwalks at the Pismo Beach Promenade in San Luis Obispo County 300,000
471 San Gabriel Blvd Rehabilitation Project — Mission Rd to Broadway, San Gabriel 300,000
489 Pasadena Ave/Monterey Rd Partial Grade Separation- Prelim Engineering-- Feasibility, So. Pasadena 300,000
938 Repair and realignment of Brahma Dr. and Winnetka Ave 300,000
1436 Alameda Corridor-East Construction Authority, San Gabriel Valley 300,000
2965 ModfIes 9 traffic signals between Willow Road and Middlefield Road and Hamilton Avenue, Menlo Park 300,000
3067 Develop bicycle paths and pedestrian access to Third Avenue Chula Vista 300,000
594 Reduce Orange County Congestion Program 250,000
1655 Landscape south side of the 91 fwy at Bellflower Blvd in Bellflower 250,000
2405 Acquire lands adjacent to US 101 as part of Southern Santa Clara County Wildlife Corridor Protection and Scenic Enhancement Project 250,000
3308 Walnut Grove at Broadway Intersection Capacity Enhancements, San Gabriel 250,000
2978 Develop conceptual master plan to improve the efficiency of transportation facilities, Covina 215,000
1579 San Gabriel Blvd Intersection Improvements at Broadway and at Las Tunas, San Gabriel 200,000
1703 Implement Northeast San Fernando Valley Road and Safety Improvements 200,000
2299 Widen Haskell Avenue between Chase St. and Roscoe Blvd 200,000
2538 Construct traffic intersection island improvements on North side of Olympic Blvd where Irolo St. and Normandie Ave. split in Koreatown, Los Angeles 200,000
2690 San Gabriel Blvd and Mission Road Intersection Improvements, San Gabriel 200,000
2811 San Gabriel Blvd Rehabilitation Project — Broadway to Las Tunas, San Gabriel 200,000
3284 Improve West Adams Blvd Streetscape in West Adams Historic District, Los Angeles 200,000
1181 Improvement of intersection at Burbank Blvd. and Woodley Ave 160,000
2389 Las Tunas Drive Pedestrian Enhancement, San Gabriel 150,000
2750 Engineering support to I-S Joint Powers Authority to widen 1- 5 freeway and improve corridor arterials from 1-710 to Orange County line 150,000
2812 Signal upgrades on Avenida de las Flores, Melinda Road, Avenida de las Banderas, and Alma Aldea, Rancho Santa Margarita, Cahfornia 125,200
388 Construction of a traffic signal at the intersection of Independence Avenue and Sherman Way 125,000
2634 Construction of a traffic signal at the intersection of Hamlin St. and Corbin Ave 125,000
3201 Construction of a traffic signal at the intersection of Oso Ave. and Vancowen St 125,000
937 Rehabilitate street surfaces in Sherman Oaks 124,000
2591 Install traffic signal on Balboa Blvd. at Knollwood Shopping Center 120,000
891 Rosemead Boulevard/Highway 19 Renovation Project, Pico Rivera 100,000
2045 Project to evaluate air quality and congestion mitigation benefits of a Hybrid Utility Vehicle in Santa Barbara County 100,000
2617 Gale Avenue widening between Fullerton Road and Nogales Street, and Nogales Street widening at Gale Avenue 100,000
2828 Implement streetscape improvements along Wilbur Avenue to enhance traffic and pedestrian safety 100,000
1228 Improve the Rosecrans Ave and Alondra Blvd bridges over the San Gabriel River in Bellflower 50,000
1531 Construction of a smart crosswalk system at the intersection of Arminta St. and Mason Ave 50,000
1867 Construction of a smart crosswalk system at the intersection of Topanga Canyon Blvd. and Gault St 50,000
3062 Conduct environmental review of proposed improvements related to the connection of Dumbarton Bridge to Highway 101 50,000
3157 Rehabilitate street surface of Addison St. between Kester Ave. and Lemona Ave. 47,000
550 Rehabilitate street surface of Cedros Avenue between Burbank Blvd. and Magnolia Blvd 43,000
2345 Upgrade first responders signal pre-emption hardware, Culver City 32,000
3175 SR 91 I 605 Needs Assesment Study, Whittier, CA 16,000
 Total California Projects: 980,837,000
Source:  Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org