| House TEA LU - FHWA High Priority Project Earmarks - 2005 (109th Congress) | |||||||||
| California Earmarks for High Priority Projects Specified in TEA LU Bill (H.R. 3), As Approved by House T&I Committee in Manager's Amendment, 3/2/2005 | |||||||||
| No. | Project | Amount | |||||||
| 1043 | Widen State Route 46 between Airport Road and the Shandon Rest Stop in San Luis Obispo County | 33,461,000 | |||||||
| 2051 | Improve interstates and roads part of the Inland Empire Goods Movement Gateway project in and around the former Norton Air Force Base | 25,000,000 | |||||||
| 1812 | Upgrade and reconstruct the I-80/I-680/SR12 Interchange, Solano County | 21,000,000 | |||||||
| 2296 | Widen Caflfornia State Route l32 from California State Route 99 west to Dakota Avenue | 18,000,000 | |||||||
| 2178 | Alameda Corridor East Gateway to America Trade Corridor Project, Highway-Railgrade separation along 35 mile corridor from Alameda Corridor (Hobart Junction) to Los Angeles/San Bernardino County Line | 15,500,000 | |||||||
| 733 | Upgrade CA SR 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County | 15,000,000 | |||||||
| 2444 | Widen Highway 101 in Mann and Sonoma Counties from Hwy 37 in Novato to Old Redwood Highway in Petaluma | 15,000,000 | |||||||
| 2128 | Construct grade separation on State College Blvd. at the Burlington Northern Santa Fe railroad, Fullerton | 14,000,000 | |||||||
| 587 | Diamond Bar On-Off Ramp at Lemon Ave on SR-60 | 12,000,000 | |||||||
| 1367 | Modify 1-880 & Stevens Creek Boulevard Interchange to ease traffic congestion in San Jose | 12,000,000 | |||||||
| 1793 | Reconfigure intersection at Highways 152 and 156 in Santa Clara County | 10,650,000 | |||||||
| 429 | Seismic retrofit of the Golden Gate Bridge | 10,000,000 | |||||||
| 954 | Construct a new interchange where 1-15 meets Cajalco Road in Corona, CA | 10,000,000 | |||||||
| 1176 | Study and construct highway alternatives between Orange and Riverside Counties, directed by RCTC, working with local transp. authorities, and guided by the current MIS | 10,000,000 | |||||||
| 1988 | The Foothill South Project, construct 16 miles of a six-lane limited access highway system | 10,000,000 | |||||||
| 926 | Construct highway connecting State Route 78/86 and State Route 111, Brawley | 9,500,000 | |||||||
| 1511 | Freeway 180 Improvements Fresno | 9,500,000 | |||||||
| 2813 | Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego | 9,000,000 | |||||||
| 1957 | Pine Avenue extension from Route 71 to Euclid Avenue in the City of Chino | 8,500,000 | |||||||
| 359 | Reconstruct 1-880 & Coleman Avenue Interchange & implement other 1-880 Corridor operational improvements in Santa Clara County | 8,000,000 | |||||||
| 2158 | Construct Interchange at Intersection of SR 44 and Stillwater Road | 8,000,000 | |||||||
| 2433 | Implement San Francisco Street Improvements Program | 8,000,000 | |||||||
| 2788 | Design and construct access improvements in North Central Business District, Sacramento | 8,000,000 | |||||||
| 2644 | Forest Highway 171 Upper Skyway Improvement | 7,250,000 | |||||||
| 2631 | Widen Peyton Dr.from Grand Ave. to Chino Hills Pky., construct Eucalyptus Ave. from Peyton Dr. to Galloping Hills, improve English Channel | 7,036,110 | |||||||
| 420 | Folsom Blvd. Transportation Enhancements, City of Rancho Cordova | 7,000,000 | |||||||
| 1440 | Reconfigure San Fernando Road from Fletcher Drive to I-5 Fwy, Los Angeles | 7,000,000 | |||||||
| 1943 | Construct Guadalupe River Trail from 1-880 to Highway 237 in Santa Clara County | 7,000,000 | |||||||
| 346 | Road widening, construct bike path, lighting, and safety improvements on road leading to Hansen Dam Recreation Area, Los Angeles | 6,500,000 | |||||||
| 3132 | Improvements/Widenening of SR 99 from Goshen to Kingsburg in Tulare County, California | 6,200,000 | |||||||
| 706 | Bay Road improvements between University Avenue to Fordham, and from Clarke Avenue to Cooley Landing. Northern access improvements between University and Illinois Avenues, East Palo Alto | 6,000,000 | |||||||
| 1239 | Complete Monterey Bay Sanctuary Scenic Trail between Monterey and Santa Cruz counties | 6,000,000 | |||||||
| 2149 | Replace SR22 interchanges, construct HOV lanes, and lengthen bridges in Garden Gove | 6,000,000 | |||||||
| 2606 | Replace South Access to the Golden Gate Bridge—Doyle Drive | 6,000,000 | |||||||
| 2735 | SR 52 East Improvments (San Diego) | 6,000,000 | |||||||
| 3120 | Completion of Interstate 5 and Interstate 8 Connectors, San Diego | 6,000,000 | |||||||
| 1214 | Golden Gate National Parks Conservancy—Plan andImplement Trails & Bikeways Plan for the Golden GateNational Recreation Area and Presidio | 5,200,000 | |||||||
| 2577 | Widen 1-5 to 10 Lanes and Improve Corridor Arterials, SR 91 to 1-710 | 5,200,000 | |||||||
| 278 | Widening the highway and reconstructing off ramps on Hwy 101 between Steele Lane and Windsor, CA to reduce traffic and promote carpools | 5,000,000 | |||||||
| 525 | Construct Route 101 Auxiliary Lanes 3rd Ave in the City of San Mateo to Millbrae Ave in Millbrae | 5,000,000 | |||||||
| 866 | Planning, design, engineering and construction of Naval Air Station, North Island access tunnel on SR 75-282 corridor, San Diego | 5,000,000 | |||||||
| 943 | US 101 Operational Improvements, San Jose | 5,000,000 | |||||||
| 1040 | Widen State Route 98 from Route _ to State Route 7, Calexico | 5,000,000 | |||||||
| 1081 | Widen SR 12 to four lanes through Jamieson Canyon (between 1-80 and SR 29) for safety concerns and economic growth | 5,000,000 | |||||||
| 1134 | Improvements to SR-67, Mapleview to Dye Road (San Diego) | 5,000,000 | |||||||
| 1237 | Interstate 15-Base Line Road Interchange Project, Rancho Cucamonga, Calfornia | 5,000,000 | |||||||
| 1342 | Construction of freeway between 1-15 and US-395 | 5,000,000 | |||||||
| 1558 | Install new grade separation at Ranchero Road in Hesperia | 5,000,000 | |||||||
| 1653 | Engineering, right of way and construction of HO V lanes on I- 580 in the Livermore Valley, Caflfornia | 5,000,000 | |||||||
| 1930 | Conduct study and construct CA State Route 239 from State Route 4 in Brentwood area to 1-205 in Tracy area | 5,000,000 | |||||||
| 2067 | Complete the engineering design and acquire the right-of-way needed for the Arch-Sperry project in San Joaquin County | 5,000,000 | |||||||
| 2080 | Reduce congestion and boost economies through safer access to the coast by realigning Hwy 299 between Trinity and Shasta Counties | 5,000,000 | |||||||
| 2245 | US 101 Corridor Improvements — Route 280 to the Capitol- Yerba Buena Interchange | 5,000,000 | |||||||
| 2719 | State Route 76 Road Widening, Melrose Drive to Interstate 15 | 5,000,000 | |||||||
| 2749 | Construct bypass along Hwy 101 around Willits, CA to reduce congestion, improve air quality and enhance economic lifeline of No. Coast | 5,000,000 | |||||||
| 2821 | Conduct study and construct Daggett Road, Port of Stockton, CA, Access Project | 5,000,000 | |||||||
| 2885 | 1-110/SR 47/Harbor Blvd. Interchange Improvements, San Pedro | 5,000,000 | |||||||
| 3092 | Develop bicycle paths and public park space adjacent to the New River, Calexico | 5,000,000 | |||||||
| 3099 | Modify and reconfigure Kanan Road interchange along US101 in Agoura Hills | 5,000,000 | |||||||
| 3244 | Implement SFgo Van Ness Corridor Improvements | 5,000,000 | |||||||
| 2640 | Reconstruct and deep-lift asphalt on various roads throughout the district in Ventura County | 4,856,000 | |||||||
| 2639 | Port of Hueneme Intermodal Access Improvement Project, including grade separation at Rice Avenue and State Route 34; widen Hueneme Road | 4,700,000 | |||||||
| 15 | Reconstruct and deep-lift asphalt on various roads thorughout the district in Santa Barbara County. | 4,644,000 | |||||||
| 143 | State Route 86S and Ave 66 highway safety grade separation | 4,500,000 | |||||||
| 2515 | Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the City of Los Angeles | 4,250,000 | |||||||
| 511 | Mission Boulevard / State Route 71 Interchange—Corridor Improvements | 4,200,000 | |||||||
| 46 | Douglas St. Improvements, El Segundo | 4,000,000 | |||||||
| 216 | Construction of Cross Valley Connector between 1-5 and SR 14 | 4,000,000 | |||||||
| 702 | San Diego, CA Construction of the 1-5 and SR-56 Connectors | 4,000,000 | |||||||
| 1051 | Widen State Route 262, replace two railroad overpass structures, and rebuild on and off ramps between SR 262 and Kato Rd. in Fremont | 4,000,000 | |||||||
| 1321 | Compton Arterial Reconstruction and Improvement Program, Compton | 4,000,000 | |||||||
| 1700 | Rehabilitation of Tulare County Farm to Market road system | 4,000,000 | |||||||
| 1775 | Construct Full access Interchange at SR 120, McKinley Avenue, aith auxiliary lanes, Manteca | 4,000,000 | |||||||
| 1990 | State Route 99 improvements at Sheldon Road | 4,000,000 | |||||||
| 2172 | Oregon-Page Mill expressway Improvements between USlO] and SR 82, Palo Alto | 4,000,000 | |||||||
| 2198 | Avalon Boulevard/I-405 Interchange moc4flcation project, Carson | 4,000,000 | |||||||
| 2655 | Construct truck lane from Britannia Blvd. to the Otay Mesa Port of Entry, San Diego County | 4,000,000 | |||||||
| 3206 | Interstate 5 and State Route 78 Interchange Improvements | 4,000,000 | |||||||
| 3139 | Improve Access Road to Beale Air Force Base (Smartville Road) | 3,750,000 | |||||||
| 1666 | Passons Grade Separation in the City of Pico Rivera | 3,700,000 | |||||||
| 719 | State Route 1 improvements between Soquel and MorrisseyBlvd including merge lanes and the La Fonda overpass, Santa Cruz | 3,670,000 | |||||||
| 1335 | Construct new interchange and related road improvements on US101 near Airport Blvd, Salinas | 3,670,000 | |||||||
| 2227 | 4 lane widening/safety improvements on State Route 25 from Hollister to Gilroy | 3,660,000 | |||||||
| 2024 | Realignment of La Brea Avenue to reduce congestion | 3,640,000 | |||||||
| 2906 | Improvement of intersection at Inglewood Ave and Marine Ave to reduce congestion | 3,600,000 | |||||||
| 287 | Rehabilitation, repair, and/or reconstruction of deficient two- lane roads that connect to Interstate 5, SR 180, SR 41 and SR 99 countywide, Fresno County | 3,500,000 | |||||||
| 1297 | Almaden Expressway Improvements between Branham Lane and Blossom Road, San Jose | 3,500,000 | |||||||
| 1942 | El Camino Real Grand Blvd Initiative in San Mateo County | 3,500,000 | |||||||
| 1092 | Widen Santa Maria River Bridge on US. Highway 101 between Santa Barbara County and San Luis Obispo County | 3,400,000 | |||||||
| 1565 | Interchange improvements at Rice Avenue and US. Highway 101 in the City of Oxnard | 3,300,000 | |||||||
| 3239 | Reconstruct Atlantic Ave. and improve drainage from Ardmore St. to Imperial Hwy South Gate | 3,250,000 | |||||||
| 3269 | Implement Northwest San Fernando Valley Road and Safety Improvements | 3,056,000 | |||||||
| 51 | Route 1 San Pedro Creek Bridge replacement in Pacifica | 3,000,000 | |||||||
| 234 | Widen SR89 at existing “mousehole” two lane RR underpass | 3,000,000 | |||||||
| 340 | Santa Anita Avenue Corridor Imp rovement project, Arcadia | 3,000,000 | |||||||
| 427 | Implement streetscape project on Central Avenue from 103rd Street to Watts/103rd Street Station, Watts | 3,000,000 | |||||||
| 526 | Solano County Cordellia Hill/ Sky Valley, transportation enhancement project, including upgrade of pedestrian and bicycle corridors | 3,000,000 | |||||||
| 592 | Reconstruct interchange for south-bound traffic entering 1-80 from Central Avenue, City of Richmond | 3,000,000 | |||||||
| 688 | Widen Wilmington Ave from 223rd street including ramp modfications, Carson | 3,000,000 | |||||||
| 1039 | Widen State Route 98, including storm drain developments, from Kloke Road to State Route ill, Calexico | 3,000,000 | |||||||
| 1085 | Widen South Main St.-Soda Bay Rd. between CR 400A (mile marker 0. 0-miler marker and 0.7) and CR 502 (mile marker 0.0 and 0.9) | 3,000,000 | |||||||
| 1142 | Implement intelligent management & logistics measures to improve freight movement, Gateway Cities. | 3,000,000 | |||||||
| 1257 | Central Galt & State Route 99 Interchange and Access Improvements | 3,000,000 | |||||||
| 1401 | Reconstruct Long Beach Bl. with medians and improve drainage from Palm Av. to Tweedy BI. in Lynwood | 3,000,000 | |||||||
| 1408 | Construction of an interchange located at the intersection of .iture State Route 65 and Ferrari Ranch Road- Westwood in Placer County | 3,000,000 | |||||||
| 1421 | Development and construction of improvements to State Route 79 in the San Jacinto Valley | 3,000,000 | |||||||
| 1639 | Resurface and construct truck lane at CA Hwy 94 and Interstate 8 interchange, Boulevard | 3,000,000 | |||||||
| 1680 | Implement Grove Avenue Corridor Interstate 10 interchange improvements in Ontario | 3,000,000 | |||||||
| 1920 | Reconstruct and widen Del Amo Blvd to four lanes between Normandie Ave and New Hampshire Ave, Los Angeles County | 3,000,000 | |||||||
| 2116 | Route 198 Expansion, from SR 99 to SR43 | 3,000,000 | |||||||
| 2193 | 710 Freeway Study to Evaluate Technical Feasibility and Impacts of a Tunnel Alternative to Close 710 Freeway Gap | 3,000,000 | |||||||
| 2194 | Greenleaf Right of Way Community Enhancement Project-design and construct bikeways, pedestrian walkways and upgrade signalization Compton | 3,000,000 | |||||||
| 2246 | Rancho Vista Blvd Widening Project | 3,000,000 | |||||||
| 2333 | Construct and repair lining in/our tunnels on Kanan, Kanan Dume, and Malibu Canyon Roads between US1 and US1O1 | 3,000,000 | |||||||
| 2758 | Hazel Avenue Improvements, US. Highway 50 to Madison Avenue | 3,000,000 | |||||||
| 2819 | Rosecrans Avenue and Bridge Arterial Reconstruction Project, Compton | 3,000,000 | |||||||
| 2861 | Construct off ramp at Interstate 8/Imperial Avenue Interchange, El Centro | 3,000,000 | |||||||
| 2882 | Construct Bristol Street multi-modal corridor in Santa Ana | 3,000,000 | |||||||
| 3085 | Widen and reconstruct Washington Blvd from westerly city boundary at Vernon to I-5 at Telegraph Rd in Commerce | 3,000,000 | |||||||
| 3098 | Construct Cypress Avenue over-pass to separate Interstate 10 and Union Pacific Railroad tracks in Fontana | 3,000,000 | |||||||
| 3203 | Widen and realign Cherry Avenue from 19th Street to one block south of Pacific Coast Highway, Signal Hill | 3,000,000 | |||||||
| 3280 | Construct Western Placerville Interchanges on State Route 50 | 3,000,000 | |||||||
| 391 | I-1O and Indian Ave Interchange, Palm Springs | 2,750,000 | |||||||
| 1369 | Palm Drive & Interstate 10 interchange project | 2,750,000 | |||||||
| 3069 | Widen and reconfigure Sepulveda & Culver Boulevards, Culver City | 2,740,000 | |||||||
| 124 | Landscaping Enhancements Along Ronald Reagan Freeway Route 118 for aesthetic purposes | 2,500,000 | |||||||
| 184 | Reconstruct segments ofHollister Avenue between San Antonio Road and State Route 154 in Santa Barbara County | 2,500,000 | |||||||
| 191 | Construct a 2.8 mile bikeway along Lambert Roadfrom Mills Ave. to Valley Home Ave. in the City of Whittier | 2,500,000 | |||||||
| 450 | Conduct project design and environmental analysis of Heritage Bridge on Heritage Road linking Chula Vista to Otay Mesa | 2,500,000 | |||||||
| 498 | Mariposa County, CA Improve 16 roads, bridge and one bike path | 2,500,000 | |||||||
| 518 | Construct pedestrian enhancements on Broadway in Los Angeles | 2,500,000 | |||||||
| 58 | Tuolumne, Stanislaus and Merced Counties Upgrade existing county highway, J59 | 2,500,000 | |||||||
| 1218 | Upgrade and reconstruct 1-580/ Vasco Road Interchange, City of Livermore | 2,500,000 | |||||||
| 1355 | Coyote Creek Trail Project — Story Road to Montague Expressway | 2,500,000 | |||||||
| 1481 | Construct truck lane on Keystone Roadfrom State Route 111 to Austin Road, Imperial County | 2,500,000 | |||||||
| 1904 | Reconstruct Azusa Ave and San Gabriel Ave for two-way traffic in Azusa | 2,500,000 | |||||||
| 2017 | Construct the Silicon Valley Transportation Incident Management Center in San Jose | 2,500,000 | |||||||
| 2131 | Construct operational and safety improvements to 1-880 N at 29th Ave in Oakland | 2,500,000 | |||||||
| 4 | Build a pedestrian bridge from Hiller Street to the Bay Trail, Belmont | 2,450,000 | |||||||
| 284 | Implement Southwest San Fernando Valley Road and Safety Improvements | 2,300,000 | |||||||
| 961 | Construction of CA 101 Auxiliaiy Lanes, Marsh Rd. to Santa Clara County Line | 2,250,000 | |||||||
| 950 | Widen Interstate 8 overpass at Dogwood Road, Imperial | 2,122,500 | |||||||
| 35 | Replace structurally unsafe Winters Bridge for vehicles, bicycles and pedestrians between Yolo and Solano Counties. | 2,000,000 | |||||||
| 254 | Construct Coyote Creek Trail Project from Story Road to Montague Expressway in San Jose | 2,000,000 | |||||||
| 260 | Escondido Construction of Bear Valley Pkwy, East Valley Pkwy | 2,000,000 | |||||||
| 297 | Study of Thomas Bridge to meet future cargo and passenger traffic needs of the ports ofLong Beach and Los Angeles | 2,000,000 | |||||||
| 300 | Mount Vernon Avenue grade separation and bridge expansion in Colton | 2,000,000 | |||||||
| 479 | Widen Firestone Blvd between Ryerson Blvd and Stewart and Gray Road in Downey | 2,000,000 | |||||||
| 485 | Widen Lakewood Blvd between Telegraph Rd and Fifth St in Downey | 2,000,000 | |||||||
| 517 | Carlsbad, CA Construction of Poinsettia Lane | 2,000,000 | |||||||
| 563 | Improvement of intersection at Aviation Blvd. and Rosecrans Ave. to reduce congestion (Hawthorne) | 2,000,000 | |||||||
| 574 | Construct 1-605 Interchange Capacity Improvements in Irwindale | 2,000,000 | |||||||
| 1230 | Modesto, Riverbank & Oakdale, CA Improve SR219 to 4- lanes | 2,000,000 | |||||||
| 1261 | Establish new grade separation at Sunset Ave in Banning | 2,000,000 | |||||||
| 1286 | South Bay Cities COG Coastal Corridor Transportation Initiative, Phase 3, El Segundo | 2,000,000 | |||||||
| 1296 | Long Beach Intelligent Transportation System: Integrate functioning traffic management center that includes the port, transit, airport as well as the city’s police and fire departments, Long Beach | 2,000,000 | |||||||
| 1316 | Widen and Improve County Line Road in Calimesa | 2,000,000 | |||||||
| 1387 | Reconstruct interchange at I-1O and Riverside Avenue to improve traffic in Rialto | 2,000,000 | |||||||
| 1402 | Expand carsharing pilot program to serve low- and moderate- income neighborhoods in the City and County of San Francisco | 2,000,000 | |||||||
| 1590 | Interstate 15 and State Route 79 South Freeway Interchange and Ramp Improvement Project | 2,000,000 | |||||||
| 1665 | Conduct Study of SR 130 Realignment Project, San Joaquin County & Santa Clara County, CA | 2,000,000 | |||||||
| 1696 | Reconstruction of The Strand in the City of Manhattan Beach to improve beach access and accommodate increased pedestrian traffic | 2,000,000 | |||||||
| 1740 | Construct earthen berm along Esperanza Road from Yorba Linda Blvd. to the west city limits to mitigate noise | 2,000,000 | |||||||
| 1821 | Construct an Interchange on Highway 70 at Georgia Paciflc Road in Oroville | 2,000,000 | |||||||
| 1830 | City of Madera, CA Improve SR99-SR145 Interchange | 2,000,000 | |||||||
| 1841 | Ramona Avenue Grade Separation, Montclair, Calzfornia | 2,000,000 | |||||||
| 2153 | Design and construct new interchange at Potrero Blvd and State Route 60 in Beaumont | 2,000,000 | |||||||
| 2192 | Construction of traffic and pedestrian safety improvements in Yucca Valley | 2,000,000 | |||||||
| 2254 | Monte Vista Avenue Grade Separation, Montclair, Cahfornia | 2,000,000 | |||||||
| 2279 | Install Central Ave Historic Corridor comprehensive streetscape improvements thus improving traffic, ped safety, and economic development, Los Angeles | 2,000,000 | |||||||
| 2399 | Improve access to 1-80 at Eureka Road Interchange | 2,000,000 | |||||||
| 2402 | Interstate 15, California Oaks Road Interchange Project | 2,000,000 | |||||||
| 2476 | Enhance pedestrian environment and increase safety along Olympic Blvd between Vermont and Western Avenues, Los Angeles | 2,000,000 | |||||||
| 2489 | Upgrade essential road arterials, connectors, bridges and other road infrastructure improvements in the Town of Desert Hot Springs, CA | 2,000,000 | |||||||
| 2499 | Improvements to Ben Maddox Way Bridge | 2,000,000 | |||||||
| 2684 | Hwy 199 Narrow Enhancement to reduce active slides that cause signflcant road closures on primary connecting route from US 101 to 1-5 | 2,000,000 | |||||||
| 2826 | Construct grade separation on State Street and Cajon Boulevard along BNSF tracks in San Bernardino | 2,000,000 | |||||||
| 2856 | Realign SR 4 within the City of Oakley | 2,000,000 | |||||||
| 3018 | Valley Boulevard Capacity Improvement between 710 Freeway and Marguerita Avenue, Alhambra | 2,000,000 | |||||||
| 3074 | Olsen Road widening and roadway improvements in Simi Valley, CA | 2,000,000 | |||||||
| 3086 | San Diego, CA Interstate 5, Sorrento Valley Road and Genesee Avenue Interchange Project | 2,000,000 | |||||||
| 3140 | Interstate 215, Los Alamos Road Interchange Project | 2,000,000 | |||||||
| 3220 | Upgrade Japson Parkway at North and South Gates of Travis Air Force Base and widen Vanden Road segment, Solano County | 2,000,000 | |||||||
| 219 | Soundwall construction on the 210 Freeway, Pasadena | 1,800,000 | |||||||
| 337 | Construct interchange on US 50 at Empire Ranch Road in Folsom | 1,800,000 | |||||||
| 430 | Upgrade and extend Commerce Avenue, City of Concord | 1,750,000 | |||||||
| 2484 | Reconstruct Interstate 880-Route 92 interchange in Hayward | 1,750,000 | |||||||
| 1610 | Reconstruct Whittier Blvd. and improve parkway drainage from Philadelphia Av. to Five Points in Whittier | 1,700,000 | |||||||
| 1915 | Construct and improve medians and drainage on Imperial Highway from west border to east border of city in La Mirada | 1,700,000 | |||||||
| 1564 | Add turn lane and adaptive traffic control system at intersection of San Tomas Expressway and Hamilton Avenue in Campbell | 1,600,000 | |||||||
| 3000 | Diamond Bar, CA Grand Avenue Rehabilitation | 1,600,000 | |||||||
| 2 | Develop and implement ITS master plan in Anaheim | 1,500,000 | |||||||
| 465 | I-S Santa Clarita-Los Angeles Gateway Improvement Project | 1,500,000 | |||||||
| 509 | Scenic preservation and run-off mitigation in the SantaMonica Mountains National Recreation Area near PCH and US 101 | 1,500,000 | |||||||
| 823 | Construct Inland Empire Transportation Management Center in Fontana to better regulate traffic and dispatch personnel to incidents | 1,500,000 | |||||||
| 917 | Widening Avenue 416 in Dinuba California | 1,500,000 | |||||||
| 1177 | Fresno County, CA Widen Friant Road to four lanes with class II bicycle lanes | 1,500,000 | |||||||
| 1744 | Construct 1-80 Gilman Street interchange improvements in Berkeley | 1,500,000 | |||||||
| 2340 | Construct truck ramp linking Interstate 5 to the National City Marine Cargo Terminal, National City | 1,500,000 | |||||||
| 2805 | Establish 1-15 Interchange at Nisqualli and Mojave River crossing in San Bernardino County | 1,500,000 | |||||||
| 2934 | Construction of Lenwood Road Grade Separation in Barstow, | 1,500,000 | |||||||
| 319 | Improve traffic safety, including streetlights, from Queen to Barclay to Los Angeles River to Riverside in Elysian Valley, Los Angeles | 1,400,000 | |||||||
| 2176 | Construct road surface improvements, and improve road safety from Brawley Water plant to HWY 86 to 9th Street to 18th Street, Brawley | 1,400,000 | |||||||
| 2713 | Conduct necessary planning and engineering and implement comprehensive Corridor Management Plan for Arroyo Seco Historic Parkway, Los Angeles | 1,400,000 | |||||||
| 2288 | Reconstruct Paramount Bl. with medians and improve drainage from north border to south border of city in Lakewood | 1,350,000 | |||||||
| 884 | Design Traffic Flow Improvements Azusa and Amar, City of West Covina | 1,250,000 | |||||||
| 971 | Realign First St between Mission Rd and Clarence St in Los Angeles | 1,250,000 | |||||||
| 317 | Construct one additional all purpose lane in each direction on 1405 and provide additional capital improvements from SR73 through the LA County line | 1,210,000 | |||||||
| 180 | Implement streetscape improvements on segments of Laurel Canyon Blvd. and Victory Blvd. in North Hollywood | 1,200,000 | |||||||
| 1371 | Construct 1-580 Interchange Improvements in Castro Valley | 1,200,000 | |||||||
| 1601 | Transportation enhancements to Children Museum of Los Angeles | 1,200,000 | |||||||
| 1903 | Randolph St improvements between Wilmington Ave and Fishburn Ave in Huntington Park | 1,200,000 | |||||||
| 1093 | Widen San Fernando Road North, including streetscape projects, Sylmar | 1,060,000 | |||||||
| 246 | Operations and management improvements, including ITS technologies, on US. Highway 101 in Santa Barbara County | 1,000,000 | |||||||
| 253 | Quincy-Oroville Highway Rehabilitation in Plumas County | 1,000,000 | |||||||
| 266 | Reconstruct 1-710 southern terminus off ramps, Long Beach | 1,000,000 | |||||||
| 572 | Shoal Creek Pedestrian Bridge (San Diego) | 1,000,000 | |||||||
| 618 | Grade Separation at 32nd Street between 1-15 and Harbor Drive, San Diego | 1,000,000 | |||||||
| 624 | Begin construction of road from US-395 west towards SR-14 | 1,000,000 | |||||||
| 701 | Develop and implement traffic calming measures for traffic exiting the I-710 into Long Beach | 1,000,000 | |||||||
| 726 | Grade Separation at Vanowen and Cliveborne, Burbank | 1,000,000 | |||||||
| 740 | Design and environmental analysis for State Route 11 connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego. | 1,000,000 | |||||||
| 867 | Construct road from Mace Blvd in Yolo County to federally supported Pacflc Flyway wild4fe area | 1,000,000 | |||||||
| 882 | Reconstruct Eastern Ave from Muller St to Watcher St in Bell Gardens | 1,000,000 | |||||||
| 896 | Colima Road at Fullerton Road Intersection Improvements | 1,000,000 | |||||||
| 951 | Improve bridge 58-7 on SR 115 that crosses the Alamo River in Holtville and also project design and environmental ananlysis of a new bridge over the same river | 1,000,000 | |||||||
| 1256 | San Diego, CA Interstate 15 Managed Lanes | 1,000,000 | |||||||