| House TEA LU - FHWA High Priority Project Earmarks - 2005 (109th Congress) | |||||||||
| California Earmarks for High Priority Projects Specified in TEA LU Bill (H.R. 3), As Approved by House T&I Committee in Manager's Amendment, 3/2/2005 | |||||||||
| No. | Project | Amount | |||||||
| 1043 | Widen State Route 46 between Airport Road and the Shandon Rest Stop in San Luis Obispo County | 33,461,000 | |||||||
| 2051 | Improve interstates and roads part of the Inland Empire Goods Movement Gateway project in and around the former Norton Air Force Base | 25,000,000 | |||||||
| 1812 | Upgrade and reconstruct the I-80/I-680/SR12 Interchange, Solano County | 21,000,000 | |||||||
| 2296 | Widen Caflfornia State Route l32 from California State Route 99 west to Dakota Avenue | 18,000,000 | |||||||
| 2178 | Alameda Corridor East Gateway to America Trade Corridor Project, Highway-Railgrade separation along 35 mile corridor from Alameda Corridor (Hobart Junction) to Los Angeles/San Bernardino County Line | 15,500,000 | |||||||
| 733 | Upgrade CA SR 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County | 15,000,000 | |||||||
| 2444 | Widen Highway 101 in Mann and Sonoma Counties from Hwy 37 in Novato to Old Redwood Highway in Petaluma | 15,000,000 | |||||||
| 2128 | Construct grade separation on State College Blvd. at the Burlington Northern Santa Fe railroad, Fullerton | 14,000,000 | |||||||
| 587 | Diamond Bar On-Off Ramp at Lemon Ave on SR-60 | 12,000,000 | |||||||
| 1367 | Modify 1-880 & Stevens Creek Boulevard Interchange to ease traffic congestion in San Jose | 12,000,000 | |||||||
| 1793 | Reconfigure intersection at Highways 152 and 156 in Santa Clara County | 10,650,000 | |||||||
| 429 | Seismic retrofit of the Golden Gate Bridge | 10,000,000 | |||||||
| 954 | Construct a new interchange where 1-15 meets Cajalco Road in Corona, CA | 10,000,000 | |||||||
| 1176 | Study and construct highway alternatives between Orange and Riverside Counties, directed by RCTC, working with local transp. authorities, and guided by the current MIS | 10,000,000 | |||||||
| 1988 | The Foothill South Project, construct 16 miles of a six-lane limited access highway system | 10,000,000 | |||||||
| 926 | Construct highway connecting State Route 78/86 and State Route 111, Brawley | 9,500,000 | |||||||
| 1511 | Freeway 180 Improvements Fresno | 9,500,000 | |||||||
| 2813 | Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego | 9,000,000 | |||||||
| 1957 | Pine Avenue extension from Route 71 to Euclid Avenue in the City of Chino | 8,500,000 | |||||||
| 359 | Reconstruct 1-880 & Coleman Avenue Interchange & implement other 1-880 Corridor operational improvements in Santa Clara County | 8,000,000 | |||||||
| 2158 | Construct Interchange at Intersection of SR 44 and Stillwater Road | 8,000,000 | |||||||
| 2433 | Implement San Francisco Street Improvements Program | 8,000,000 | |||||||
| 2788 | Design and construct access improvements in North Central Business District, Sacramento | 8,000,000 | |||||||
| 2644 | Forest Highway 171 Upper Skyway Improvement | 7,250,000 | |||||||
| 2631 | Widen Peyton Dr.from Grand Ave. to Chino Hills Pky., construct Eucalyptus Ave. from Peyton Dr. to Galloping Hills, improve English Channel | 7,036,110 | |||||||
| 420 | Folsom Blvd. Transportation Enhancements, City of Rancho Cordova | 7,000,000 | |||||||
| 1440 | Reconfigure San Fernando Road from Fletcher Drive to I-5 Fwy, Los Angeles | 7,000,000 | |||||||
| 1943 | Construct Guadalupe River Trail from 1-880 to Highway 237 in Santa Clara County | 7,000,000 | |||||||
| 346 | Road widening, construct bike path, lighting, and safety improvements on road leading to Hansen Dam Recreation Area, Los Angeles | 6,500,000 | |||||||
| 3132 | Improvements/Widenening of SR 99 from Goshen to Kingsburg in Tulare County, California | 6,200,000 | |||||||
| 706 | Bay Road improvements between University Avenue to Fordham, and from Clarke Avenue to Cooley Landing. Northern access improvements between University and Illinois Avenues, East Palo Alto | 6,000,000 | |||||||
| 1239 | Complete Monterey Bay Sanctuary Scenic Trail between Monterey and Santa Cruz counties | 6,000,000 | |||||||
| 2149 | Replace SR22 interchanges, construct HOV lanes, and lengthen bridges in Garden Gove | 6,000,000 | |||||||
| 2606 | Replace South Access to the Golden Gate Bridge—Doyle Drive | 6,000,000 | |||||||
| 2735 | SR 52 East Improvments (San Diego) | 6,000,000 | |||||||
| 3120 | Completion of Interstate 5 and Interstate 8 Connectors, San Diego | 6,000,000 | |||||||
| 1214 | Golden Gate National Parks Conservancy—Plan andImplement Trails & Bikeways Plan for the Golden GateNational Recreation Area and Presidio | 5,200,000 | |||||||
| 2577 | Widen 1-5 to 10 Lanes and Improve Corridor Arterials, SR 91 to 1-710 | 5,200,000 | |||||||
| 278 | Widening the highway and reconstructing off ramps on Hwy 101 between Steele Lane and Windsor, CA to reduce traffic and promote carpools | 5,000,000 | |||||||
| 525 | Construct Route 101 Auxiliary Lanes 3rd Ave in the City of San Mateo to Millbrae Ave in Millbrae | 5,000,000 | |||||||
| 866 | Planning, design, engineering and construction of Naval Air Station, North Island access tunnel on SR 75-282 corridor, San Diego | 5,000,000 | |||||||
| 943 | US 101 Operational Improvements, San Jose | 5,000,000 | |||||||
| 1040 | Widen State Route 98 from Route _ to State Route 7, Calexico | 5,000,000 | |||||||
| 1081 | Widen SR 12 to four lanes through Jamieson Canyon (between 1-80 and SR 29) for safety concerns and economic growth | 5,000,000 | |||||||
| 1134 | Improvements to SR-67, Mapleview to Dye Road (San Diego) | 5,000,000 | |||||||
| 1237 | Interstate 15-Base Line Road Interchange Project, Rancho Cucamonga, Calfornia | 5,000,000 | |||||||
| 1342 | Construction of freeway between 1-15 and US-395 | 5,000,000 | |||||||
| 1558 | Install new grade separation at Ranchero Road in Hesperia | 5,000,000 | |||||||
| 1653 | Engineering, right of way and construction of HO V lanes on I- 580 in the Livermore Valley, Caflfornia | 5,000,000 | |||||||
| 1930 | Conduct study and construct CA State Route 239 from State Route 4 in Brentwood area to 1-205 in Tracy area | 5,000,000 | |||||||
| 2067 | Complete the engineering design and acquire the right-of-way needed for the Arch-Sperry project in San Joaquin County | 5,000,000 | |||||||
| 2080 | Reduce congestion and boost economies through safer access to the coast by realigning Hwy 299 between Trinity and Shasta Counties | 5,000,000 | |||||||
| 2245 | US 101 Corridor Improvements — Route 280 to the Capitol- Yerba Buena Interchange | 5,000,000 | |||||||
| 2719 | State Route 76 Road Widening, Melrose Drive to Interstate 15 | 5,000,000 | |||||||
| 2749 | Construct bypass along Hwy 101 around Willits, CA to reduce congestion, improve air quality and enhance economic lifeline of No. Coast | 5,000,000 | |||||||
| 2821 | Conduct study and construct Daggett Road, Port of Stockton, CA, Access Project | 5,000,000 | |||||||
| 2885 | 1-110/SR 47/Harbor Blvd. Interchange Improvements, San Pedro | 5,000,000 | |||||||
| 3092 | Develop bicycle paths and public park space adjacent to the New River, Calexico | 5,000,000 | |||||||
| 3099 | Modify and reconfigure Kanan Road interchange along US101 in Agoura Hills | 5,000,000 | |||||||
| 3244 | Implement SFgo Van Ness Corridor Improvements | 5,000,000 | |||||||
| 2640 | Reconstruct and deep-lift asphalt on various roads throughout the district in Ventura County | 4,856,000 | |||||||
| 2639 | Port of Hueneme Intermodal Access Improvement Project, including grade separation at Rice Avenue and State Route 34; widen Hueneme Road | 4,700,000 | |||||||
| 15 | Reconstruct and deep-lift asphalt on various roads thorughout the district in Santa Barbara County. | 4,644,000 | |||||||
| 143 | State Route 86S and Ave 66 highway safety grade separation | 4,500,000 | |||||||
| 2515 | Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the City of Los Angeles | 4,250,000 | |||||||
| 511 | Mission Boulevard / State Route 71 Interchange—Corridor Improvements | 4,200,000 | |||||||
| 46 | Douglas St. Improvements, El Segundo | 4,000,000 | |||||||
| 216 | Construction of Cross Valley Connector between 1-5 and SR 14 | 4,000,000 | |||||||
| 702 | San Diego, CA Construction of the 1-5 and SR-56 Connectors | 4,000,000 | |||||||
| 1051 | Widen State Route 262, replace two railroad overpass structures, and rebuild on and off ramps between SR 262 and Kato Rd. in Fremont | 4,000,000 | |||||||
| 1321 | Compton Arterial Reconstruction and Improvement Program, Compton | 4,000,000 | |||||||
| 1700 | Rehabilitation of Tulare County Farm to Market road system | 4,000,000 | |||||||
| 1775 | Construct Full access Interchange at SR 120, McKinley Avenue, aith auxiliary lanes, Manteca | 4,000,000 | |||||||
| 1990 | State Route 99 improvements at Sheldon Road | 4,000,000 | |||||||
| 2172 | Oregon-Page Mill expressway Improvements between USlO] and SR 82, Palo Alto | 4,000,000 | |||||||
| 2198 | Avalon Boulevard/I-405 Interchange moc4flcation project, Carson | 4,000,000 | |||||||
| 2655 | Construct truck lane from Britannia Blvd. to the Otay Mesa Port of Entry, San Diego County | 4,000,000 | |||||||
| 3206 | Interstate 5 and State Route 78 Interchange Improvements | 4,000,000 | |||||||
| 3139 | Improve Access Road to Beale Air Force Base (Smartville Road) | 3,750,000 | |||||||
| 1666 | Passons Grade Separation in the City of Pico Rivera | 3,700,000 | |||||||
| 719 | State Route 1 improvements between Soquel and MorrisseyBlvd including merge lanes and the La Fonda overpass, Santa Cruz | 3,670,000 | |||||||
| 1335 | Construct new interchange and related road improvements on US101 near Airport Blvd, Salinas | 3,670,000 | |||||||
| 2227 | 4 lane widening/safety improvements on State Route 25 from Hollister to Gilroy | 3,660,000 | |||||||
| 2024 | Realignment of La Brea Avenue to reduce congestion | 3,640,000 | |||||||
| 2906 | Improvement of intersection at Inglewood Ave and Marine Ave to reduce congestion | 3,600,000 | |||||||
| 287 | Rehabilitation, repair, and/or reconstruction of deficient two- lane roads that connect to Interstate 5, SR 180, SR 41 and SR 99 countywide, Fresno County | 3,500,000 | |||||||
| 1297 | Almaden Expressway Improvements between Branham Lane and Blossom Road, San Jose | 3,500,000 | |||||||
| 1942 | El Camino Real Grand Blvd Initiative in San Mateo County | 3,500,000 | |||||||
| 1092 | Widen Santa Maria River Bridge on US. Highway 101 between Santa Barbara County and San Luis Obispo County | 3,400,000 | |||||||
| 1565 | Interchange improvements at Rice Avenue and US. Highway 101 in the City of Oxnard | 3,300,000 | |||||||
| 3239 | Reconstruct Atlantic Ave. and improve drainage from Ardmore St. to Imperial Hwy South Gate | 3,250,000 | |||||||
| 3269 | Implement Northwest San Fernando Valley Road and Safety Improvements | 3,056,000 | |||||||
| 51 | Route 1 San Pedro Creek Bridge replacement in Pacifica | 3,000,000 | |||||||
| 234 | Widen SR89 at existing “mousehole” two lane RR underpass | 3,000,000 | |||||||
| 340 | Santa Anita Avenue Corridor Imp rovement project, Arcadia | 3,000,000 | |||||||
| 427 | Implement streetscape project on Central Avenue from 103rd Street to Watts/103rd Street Station, Watts | 3,000,000 | |||||||
| 526 | Solano County Cordellia Hill/ Sky Valley, transportation enhancement project, including upgrade of pedestrian and bicycle corridors | 3,000,000 | |||||||
| 592 | Reconstruct interchange for south-bound traffic entering 1-80 from Central Avenue, City of Richmond | 3,000,000 | |||||||
| 688 | Widen Wilmington Ave from 223rd street including ramp modfications, Carson | 3,000,000 | |||||||
| 1039 | Widen State Route 98, including storm drain developments, from Kloke Road to State Route ill, Calexico | 3,000,000 | |||||||
| 1085 | Widen South Main St.-Soda Bay Rd. between CR 400A (mile marker 0. 0-miler marker and 0.7) and CR 502 (mile marker 0.0 and 0.9) | 3,000,000 | |||||||
| 1142 | Implement intelligent management & logistics measures to improve freight movement, Gateway Cities. | 3,000,000 | |||||||
| 1257 | Central Galt & State Route 99 Interchange and Access Improvements | 3,000,000 | |||||||
| 1401 | Reconstruct Long Beach Bl. with medians and improve drainage from Palm Av. to Tweedy BI. in Lynwood | 3,000,000 | |||||||
| 1408 | Construction of an interchange located at the intersection of .iture State Route 65 and Ferrari Ranch Road- Westwood in Placer County | 3,000,000 | |||||||
| 1421 | Development and construction of improvements to State Route 79 in the San Jacinto Valley | 3,000,000 | |||||||
| 1639 | Resurface and construct truck lane at CA Hwy 94 and Interstate 8 interchange, Boulevard | 3,000,000 | |||||||
| 1680 | Implement Grove Avenue Corridor Interstate 10 interchange improvements in Ontario | 3,000,000 | |||||||
| 1920 | Reconstruct and widen Del Amo Blvd to four lanes between Normandie Ave and New Hampshire Ave, Los Angeles County | 3,000,000 | |||||||
| 2116 | Route 198 Expansion, from SR 99 to SR43 | 3,000,000 | |||||||
| 2193 | 710 Freeway Study to Evaluate Technical Feasibility and Impacts of a Tunnel Alternative to Close 710 Freeway Gap | 3,000,000 | |||||||
| 2194 | Greenleaf Right of Way Community Enhancement Project-design and construct bikeways, pedestrian walkways and upgrade signalization Compton | 3,000,000 | |||||||
| 2246 | Rancho Vista Blvd Widening Project | 3,000,000 | |||||||
| 2333 | Construct and repair lining in/our tunnels on Kanan, Kanan Dume, and Malibu Canyon Roads between US1 and US1O1 | 3,000,000 | |||||||
| 2758 | Hazel Avenue Improvements, US. Highway 50 to Madison Avenue | 3,000,000 | |||||||
| 2819 | Rosecrans Avenue and Bridge Arterial Reconstruction Project, Compton | 3,000,000 | |||||||
| 2861 | Construct off ramp at Interstate 8/Imperial Avenue Interchange, El Centro | 3,000,000 | |||||||
| 2882 | Construct Bristol Street multi-modal corridor in Santa Ana | 3,000,000 | |||||||
| 3085 | Widen and reconstruct Washington Blvd from westerly city boundary at Vernon to I-5 at Telegraph Rd in Commerce | 3,000,000 | |||||||
| 3098 | Construct Cypress Avenue over-pass to separate Interstate 10 and Union Pacific Railroad tracks in Fontana | 3,000,000 | |||||||
| 3203 | Widen and realign Cherry Avenue from 19th Street to one block south of Pacific Coast Highway, Signal Hill | 3,000,000 | |||||||
| 3280 | Construct Western Placerville Interchanges on State Route 50 | 3,000,000 | |||||||
| 391 | I-1O and Indian Ave Interchange, Palm Springs | 2,750,000 | |||||||
| 1369 | Palm Drive & Interstate 10 interchange project | 2,750,000 | |||||||
| 3069 | Widen and reconfigure Sepulveda & Culver Boulevards, Culver City | 2,740,000 | |||||||
| 124 | Landscaping Enhancements Along Ronald Reagan Freeway Route 118 for aesthetic purposes | 2,500,000 | |||||||
| 184 | Reconstruct segments ofHollister Avenue between San Antonio Road and State Route 154 in Santa Barbara County | 2,500,000 | |||||||
| 191 | Construct a 2.8 mile bikeway along Lambert Roadfrom Mills Ave. to Valley Home Ave. in the City of Whittier | 2,500,000 | |||||||
| 450 | Conduct project design and environmental analysis of Heritage Bridge on Heritage Road linking Chula Vista to Otay Mesa | 2,500,000 | |||||||
| 498 | Mariposa County, CA Improve 16 roads, bridge and one bike path | 2,500,000 | |||||||
| 518 | Construct pedestrian enhancements on Broadway in Los Angeles | 2,500,000 | |||||||
| 58 | Tuolumne, Stanislaus and Merced Counties Upgrade existing county highway, J59 | 2,500,000 | |||||||
| 1218 | Upgrade and reconstruct 1-580/ Vasco Road Interchange, City of Livermore | 2,500,000 | |||||||
| 1355 | Coyote Creek Trail Project — Story Road to Montague Expressway | 2,500,000 | |||||||
| 1481 | Construct truck lane on Keystone Roadfrom State Route 111 to Austin Road, Imperial County | 2,500,000 | |||||||
| 1904 | Reconstruct Azusa Ave and San Gabriel Ave for two-way traffic in Azusa | 2,500,000 | |||||||
| 2017 | Construct the Silicon Valley Transportation Incident Management Center in San Jose | 2,500,000 | |||||||
| 2131 | Construct operational and safety improvements to 1-880 N at 29th Ave in Oakland | 2,500,000 | |||||||
| 4 | Build a pedestrian bridge from Hiller Street to the Bay Trail, Belmont | 2,450,000 | |||||||
| 284 | Implement Southwest San Fernando Valley Road and Safety Improvements | 2,300,000 | |||||||
| 961 | Construction of CA 101 Auxiliaiy Lanes, Marsh Rd. to Santa Clara County Line | 2,250,000 | |||||||
| 950 | Widen Interstate 8 overpass at Dogwood Road, Imperial | 2,122,500 | |||||||
| 35 | Replace structurally unsafe Winters Bridge for vehicles, bicycles and pedestrians between Yolo and Solano Counties. | 2,000,000 | |||||||
| 254 | Construct Coyote Creek Trail Project from Story Road to Montague Expressway in San Jose | 2,000,000 | |||||||
| 260 | Escondido Construction of Bear Valley Pkwy, East Valley Pkwy | 2,000,000 | |||||||
| 297 | Study of Thomas Bridge to meet future cargo and passenger traffic needs of the ports ofLong Beach and Los Angeles | 2,000,000 | |||||||
| 300 | Mount Vernon Avenue grade separation and bridge expansion in Colton | 2,000,000 | |||||||
| 479 | Widen Firestone Blvd between Ryerson Blvd and Stewart and Gray Road in Downey | 2,000,000 | |||||||
| 485 | Widen Lakewood Blvd between Telegraph Rd and Fifth St in Downey | 2,000,000 | |||||||
| 517 | Carlsbad, CA Construction of Poinsettia Lane | 2,000,000 | |||||||
| 563 | Improvement of intersection at Aviation Blvd. and Rosecrans Ave. to reduce congestion (Hawthorne) | 2,000,000 | |||||||
| 574 | Construct 1-605 Interchange Capacity Improvements in Irwindale | 2,000,000 | |||||||
| 1230 | Modesto, Riverbank & Oakdale, CA Improve SR219 to 4- lanes | 2,000,000 | |||||||
| 1261 | Establish new grade separation at Sunset Ave in Banning | 2,000,000 | |||||||
| 1286 | South Bay Cities COG Coastal Corridor Transportation Initiative, Phase 3, El Segundo | 2,000,000 | |||||||
| 1296 | Long Beach Intelligent Transportation System: Integrate functioning traffic management center that includes the port, transit, airport as well as the city’s police and fire departments, Long Beach | 2,000,000 | |||||||
| 1316 | Widen and Improve County Line Road in Calimesa | 2,000,000 | |||||||
| 1387 | Reconstruct interchange at I-1O and Riverside Avenue to improve traffic in Rialto | 2,000,000 | |||||||
| 1402 | Expand carsharing pilot program to serve low- and moderate- income neighborhoods in the City and County of San Francisco | 2,000,000 | |||||||
| 1590 | Interstate 15 and State Route 79 South Freeway Interchange and Ramp Improvement Project | 2,000,000 | |||||||
| 1665 | Conduct Study of SR 130 Realignment Project, San Joaquin County & Santa Clara County, CA | 2,000,000 | |||||||
| 1696 | Reconstruction of The Strand in the City of Manhattan Beach to improve beach access and accommodate increased pedestrian traffic | 2,000,000 | |||||||
| 1740 | Construct earthen berm along Esperanza Road from Yorba Linda Blvd. to the west city limits to mitigate noise | 2,000,000 | |||||||
| 1821 | Construct an Interchange on Highway 70 at Georgia Paciflc Road in Oroville | 2,000,000 | |||||||
| 1830 | City of Madera, CA Improve SR99-SR145 Interchange | 2,000,000 | |||||||
| 1841 | Ramona Avenue Grade Separation, Montclair, Calzfornia | 2,000,000 | |||||||
| 2153 | Design and construct new interchange at Potrero Blvd and State Route 60 in Beaumont | 2,000,000 | |||||||
| 2192 | Construction of traffic and pedestrian safety improvements in Yucca Valley | 2,000,000 | |||||||
| 2254 | Monte Vista Avenue Grade Separation, Montclair, Cahfornia | 2,000,000 | |||||||
| 2279 | Install Central Ave Historic Corridor comprehensive streetscape improvements thus improving traffic, ped safety, and economic development, Los Angeles | 2,000,000 | |||||||
| 2399 | Improve access to 1-80 at Eureka Road Interchange | 2,000,000 | |||||||
| 2402 | Interstate 15, California Oaks Road Interchange Project | 2,000,000 | |||||||
| 2476 | Enhance pedestrian environment and increase safety along Olympic Blvd between Vermont and Western Avenues, Los Angeles | 2,000,000 | |||||||
| 2489 | Upgrade essential road arterials, connectors, bridges and other road infrastructure improvements in the Town of Desert Hot Springs, CA | 2,000,000 | |||||||
| 2499 | Improvements to Ben Maddox Way Bridge | 2,000,000 | |||||||
| 2684 | Hwy 199 Narrow Enhancement to reduce active slides that cause signflcant road closures on primary connecting route from US 101 to 1-5 | 2,000,000 | |||||||
| 2826 | Construct grade separation on State Street and Cajon Boulevard along BNSF tracks in San Bernardino | 2,000,000 | |||||||
| 2856 | Realign SR 4 within the City of Oakley | 2,000,000 | |||||||
| 3018 | Valley Boulevard Capacity Improvement between 710 Freeway and Marguerita Avenue, Alhambra | 2,000,000 | |||||||
| 3074 | Olsen Road widening and roadway improvements in Simi Valley, CA | 2,000,000 | |||||||
| 3086 | San Diego, CA Interstate 5, Sorrento Valley Road and Genesee Avenue Interchange Project | 2,000,000 | |||||||
| 3140 | Interstate 215, Los Alamos Road Interchange Project | 2,000,000 | |||||||
| 3220 | Upgrade Japson Parkway at North and South Gates of Travis Air Force Base and widen Vanden Road segment, Solano County | 2,000,000 | |||||||
| 219 | Soundwall construction on the 210 Freeway, Pasadena | 1,800,000 | |||||||
| 337 | Construct interchange on US 50 at Empire Ranch Road in Folsom | 1,800,000 | |||||||
| 430 | Upgrade and extend Commerce Avenue, City of Concord | 1,750,000 | |||||||
| 2484 | Reconstruct Interstate 880-Route 92 interchange in Hayward | 1,750,000 | |||||||
| 1610 | Reconstruct Whittier Blvd. and improve parkway drainage from Philadelphia Av. to Five Points in Whittier | 1,700,000 | |||||||
| 1915 | Construct and improve medians and drainage on Imperial Highway from west border to east border of city in La Mirada | 1,700,000 | |||||||
| 1564 | Add turn lane and adaptive traffic control system at intersection of San Tomas Expressway and Hamilton Avenue in Campbell | 1,600,000 | |||||||
| 3000 | Diamond Bar, CA Grand Avenue Rehabilitation | 1,600,000 | |||||||
| 2 | Develop and implement ITS master plan in Anaheim | 1,500,000 | |||||||
| 465 | I-S Santa Clarita-Los Angeles Gateway Improvement Project | 1,500,000 | |||||||
| 509 | Scenic preservation and run-off mitigation in the SantaMonica Mountains National Recreation Area near PCH and US 101 | 1,500,000 | |||||||
| 823 | Construct Inland Empire Transportation Management Center in Fontana to better regulate traffic and dispatch personnel to incidents | 1,500,000 | |||||||
| 917 | Widening Avenue 416 in Dinuba California | 1,500,000 | |||||||
| 1177 | Fresno County, CA Widen Friant Road to four lanes with class II bicycle lanes | 1,500,000 | |||||||
| 1744 | Construct 1-80 Gilman Street interchange improvements in Berkeley | 1,500,000 | |||||||
| 2340 | Construct truck ramp linking Interstate 5 to the National City Marine Cargo Terminal, National City | 1,500,000 | |||||||
| 2805 | Establish 1-15 Interchange at Nisqualli and Mojave River crossing in San Bernardino County | 1,500,000 | |||||||
| 2934 | Construction of Lenwood Road Grade Separation in Barstow, | 1,500,000 | |||||||
| 319 | Improve traffic safety, including streetlights, from Queen to Barclay to Los Angeles River to Riverside in Elysian Valley, Los Angeles | 1,400,000 | |||||||
| 2176 | Construct road surface improvements, and improve road safety from Brawley Water plant to HWY 86 to 9th Street to 18th Street, Brawley | 1,400,000 | |||||||
| 2713 | Conduct necessary planning and engineering and implement comprehensive Corridor Management Plan for Arroyo Seco Historic Parkway, Los Angeles | 1,400,000 | |||||||
| 2288 | Reconstruct Paramount Bl. with medians and improve drainage from north border to south border of city in Lakewood | 1,350,000 | |||||||
| 884 | Design Traffic Flow Improvements Azusa and Amar, City of West Covina | 1,250,000 | |||||||
| 971 | Realign First St between Mission Rd and Clarence St in Los Angeles | 1,250,000 | |||||||
| 317 | Construct one additional all purpose lane in each direction on 1405 and provide additional capital improvements from SR73 through the LA County line | 1,210,000 | |||||||
| 180 | Implement streetscape improvements on segments of Laurel Canyon Blvd. and Victory Blvd. in North Hollywood | 1,200,000 | |||||||
| 1371 | Construct 1-580 Interchange Improvements in Castro Valley | 1,200,000 | |||||||
| 1601 | Transportation enhancements to Children Museum of Los Angeles | 1,200,000 | |||||||
| 1903 | Randolph St improvements between Wilmington Ave and Fishburn Ave in Huntington Park | 1,200,000 | |||||||
| 1093 | Widen San Fernando Road North, including streetscape projects, Sylmar | 1,060,000 | |||||||
| 246 | Operations and management improvements, including ITS technologies, on US. Highway 101 in Santa Barbara County | 1,000,000 | |||||||
| 253 | Quincy-Oroville Highway Rehabilitation in Plumas County | 1,000,000 | |||||||
| 266 | Reconstruct 1-710 southern terminus off ramps, Long Beach | 1,000,000 | |||||||
| 572 | Shoal Creek Pedestrian Bridge (San Diego) | 1,000,000 | |||||||
| 618 | Grade Separation at 32nd Street between 1-15 and Harbor Drive, San Diego | 1,000,000 | |||||||
| 624 | Begin construction of road from US-395 west towards SR-14 | 1,000,000 | |||||||
| 701 | Develop and implement traffic calming measures for traffic exiting the I-710 into Long Beach | 1,000,000 | |||||||
| 726 | Grade Separation at Vanowen and Cliveborne, Burbank | 1,000,000 | |||||||
| 740 | Design and environmental analysis for State Route 11 connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego. | 1,000,000 | |||||||
| 867 | Construct road from Mace Blvd in Yolo County to federally supported Pacflc Flyway wild4fe area | 1,000,000 | |||||||
| 882 | Reconstruct Eastern Ave from Muller St to Watcher St in Bell Gardens | 1,000,000 | |||||||
| 896 | Colima Road at Fullerton Road Intersection Improvements | 1,000,000 | |||||||
| 951 | Improve bridge 58-7 on SR 115 that crosses the Alamo River in Holtville and also project design and environmental ananlysis of a new bridge over the same river | 1,000,000 | |||||||
| 1256 | San Diego, CA Interstate 15 Managed Lanes | 1,000,000 | |||||||
| 1509 | Construction of new roadway lighting on major transportation corridors in the Southwest San Fernando Valley | 1,000,000 | |||||||
| 1557 | Improve 1-8 off ramp at Ocotillo to the Imperial Valley College Desert Museum/Regional Traveler Visitor Center, Imperial County | 1,000,000 | |||||||
| 1662 | City ofRedondo Beach Esplanade Improvement Project | 1,000,000 | |||||||
| 1759 | Highways 152 -156 Intersection improvements, CA | 1,000,000 | |||||||
| 1778 | Conduct Study and Construct 1205 Chrisman Road Interchange Project, Tracy, CA - | 1,000,000 | |||||||
| 2018 | Design and Construction Camino Tassajara Crown Canyon to East Town Project, Danville, CA | 1,000,000 | |||||||
| 2055 | Construction of an interchange at Lammers Road and 1-205, Tracy, CA | 1,000,000 | |||||||
| 2084 | Construct Alviso Bay Trail from Gold Street in historic Alviso to San Tomas Aquino Creek in San Jose | 1,000,000 | |||||||
| 2089 | Vasco Road Safety Improvements, Contra Costa Transportation Authority and the County of Alameda Public Works, Calfornia | 1,000,000 | |||||||
| 2147 | Construction of new roadway lighting on major transportation corridors in the Northwest San Fernando Valley | 1,000,000 | |||||||
| 2174 | Park Boulevard-Harbor Drive Rail Grade Separation, San Diego | 1,000,000 | |||||||
| 2209 | Construct 1-80 HOV lanes and interchange in Vallejo | 1,000,000 | |||||||
| 2233 | Interstate 15 and Winchester Road Interchange Project | 1,000,000 | |||||||
| 2278 | Construct safe routes to school in Chertyland and Ashland | 1,000,000 | |||||||
| 2293 | Widen and make ITS improvements on Paramount Blvd between Telegraph Rd and Gardendale St in Downey | 1,000,000 | |||||||
| 2352 | Improve 1-8 off ramp to the Desert Farming Institute, Imperial County | 1,000,000 | |||||||
| 2369 | Construct fourth bore of Caldecott Tunnel on SR 24, California | 1,000,000 | |||||||
| 2448 | Widen 1-238 between 1-580 & 1-880 in Alameda County | 1,000,000 | |||||||
| 2479 | Construct landscape medians along Skyline Drive from Sears Avenue to 58th Street, San Diego | 1,000,000 | |||||||
| 2514 | Widen Atlantic Bl bridge over the Los Angeles River in Vernon | 1,000,000 | |||||||
| 2543 | State Route 86S and Ave 50 highway safety grade separation | 1,000,000 | |||||||
| 2663 | Purchase of Rosemead Blvd ROW, Temple City | 1,000,000 | |||||||
| 2701 | Construct Route 101 bicycle/pedestrian overpass at Millbrae Ave for the San Francisco Bay Trail | 1,000,000 | |||||||
| 2843 | Crenshaw Blvd. Rehabilitation, Maricopa St. to Sepulveda Blvd., City of Torrance | 1,000,000 | |||||||
| 2849 | Improve pedestrian and biking trails within East Bay Regional Park District, Contra Costa County | 1,000,000 | |||||||
| 2932 | Construct 213th Street pedestrian bridge to provide safe passage for pedestrians and wheelchairs, Carson | 1,000,000 | |||||||
| 3133 | Design and implement Harbor Boulevard ITS in Garden Grove | 1,000,000 | |||||||
| 3184 | Construct parking facility and improve museum pedestrian access from trolley station, San Diego | 1,000,000 | |||||||
| 3209 | Highway 74 and Interstate 215 Interchange Project | 1,000,000 | |||||||
| 3229 | Construction and enhancements of trails in the Santa Monica Mountains National Recreation Area | 1,000,000 | |||||||
| 3285 | Improve access from 1-8 and construct parking lot for the Imperial Sand Dunes Recreation Area Visitor’s Center, Imperial Valley | 1,000,000 | |||||||
| 3313 | San Diego, CA Construction of North Coast Interstate 5 | 1,000,000 | |||||||
| 480 | Construct Air Cargo Access Road to Oakland International Airport. | 900,000 | |||||||
| 3022 | Valley View/Stage Grade Separation Project, La Mirada and Santa Fe Springs, California | 900,000 | |||||||
| 1307 | Construct sound barriers at the I-805/S.R. 54 Interchange, National City | 850,000 | |||||||
| 2626 | Construct Cabot-Camino Capistrano Bridge Project and related roadway improvements in Cities of Mission Viejo and Laguna Niguel, California | 838,690 | |||||||
| 43 | Roadway surface improvements, street lighting, and storm drain improvements to South Center Street from Baughman Road to State Route 78/86, Westmorland | 800,000 | |||||||
| 595 | Street Closure at Chevy Chase Drive, Glendale | 800,000 | |||||||
| 2157 | Crenshaw Blvd. Rehabilitation, 182nd St. -190th St., and Crenshaw Blvd. at 182nd St. Fvy on-off Ramp Capacity Enhancement, City of Torrance | 800,000 | |||||||
| 308 | Streetscape improvements at East 14th St-Mission Blvd in Alameda County | 750,000 | |||||||
| 709 | Construct bicycle and pedestrian bridge between Oyster Bay Regional Park in San Leandro and Metropolitan Golf Course in Oakland | 750,000 | |||||||
| 806 | Replace 1-880 overpass at Davis St in San Leandro | 750,000 | |||||||
| 984 | Construct oveFpass on Central Ave at the railroad crossing in Newark | 750,000 | |||||||
| 1138 | Construct Valley Boulevard Drainage Improvements, El Monte | 750,000 | |||||||
| 1407 | Construct Traffic flow improvements Vincent and Lakes Drive, West Covina | 750,000 | |||||||
| 357 | Construct new left turn lane at State Route 19 and Teistar in El Monte | 700,000 | |||||||
| 1414 | Rio Vista Bridge Realignment Study & Street Sign Safety Program | 700,000 | |||||||
| 881 | North Atlantic Pedestrian Bridge, Monterey Park | 600,000 | |||||||
| 1390 | Reconstruct Paramount Blvd. with medians and improve drainage from Artesia Bi. to Candlewood St. in Long Beach | 600,000 | |||||||
| 2699 | Construct the Los Angeles River bicycle and pedestrian path in the San Fernando Valley | 575,000 | |||||||
| 2162 | Construct truck lane on Baughman Roadfrom State Route 78/86 to Forrester Road, Westmorland | 550,000 | |||||||
| 1 | Construct safe access to streets for bicyclists and pedestrians including crosswalks, sidewalks and traffic calming measures, Covina | 500,000 | |||||||
| 28 | Huntington Beach, Remove off-ramp on 1-405 at Beach Blvd. Construct fourth lane on 1-405 North, at the Beach Blvd. interchange | 500,000 | |||||||
| 90 | San Diego River Multiuse Bicycle and Pedestrian Path | 500,000 | |||||||
| 134 | Improvement of intersection at Balboa Blvd. and San Fernando Rd | 500,000 | |||||||
| 570 | 1-5 HOV improvements from Route 134 to Route 170 | 500,000 | |||||||
| 716 | Conduct a Project Study Report for new Highway 99 interchange between SR 165 and Bradbury Road, serving Turlock/Hilmar region | 500,000 | |||||||
| 855 | Implement Riverside Avenue Railroad Bridge improvements, south of Interstate 10 in Rialto | 500,000 | |||||||
| 1023 | Implement Van Nuys Road and Safety Improvements | 500,000 | |||||||
| 1148 | Los Angeles Regional Diesel Emissions Reduction Program For Engine Retrofit, Gateway Cities | 500,000 | |||||||
| 1285 | Rehabilitate pavement on Azusa Avenue and San Gabriel Avenue in Azusa | 500,000 | |||||||
| 1608 | Project design, environmental assessment, and roadway construction of Lonestar Road from Alta Road to Enrico Fermi Drive San Diego County | 500,000 | |||||||
| 1633 | Conduct project report study on Old River School Rd — Firestone Blvd intersection reconfiguration | 500,000 | |||||||
| 1697 | Construction of new roadway lighting on major transportation corridors in the Northeast San Fernando Valley | 500,000 | |||||||
| 1722 | State Route 88 - Pine Grove Corridor Improvement Project | 500,000 | |||||||
| 1767 | Construct Hwy 101 bicycle-pedestrian project in Marin and Sonoma Counties from north ofAthenton Ave to south of Petaluma River bridge | 500,000 | |||||||
| 1776 | Install Emergency Vehicle PreemptionEQ along major arterials in the I 880 Corridor, A,ameda County | 500,000 | |||||||
| 1780 | Construction of Campus Parkway from State Route 99 to Yosemite Ave., Merced County | 500,000 | |||||||
| 2378 | Make traffic and safety improvements to Atlantic Blvd in Maywood | 500,000 | |||||||
| 2427 | US-395 Realignment and Widening Project | 500,000 | |||||||
| 2542 | Replace twin 2 lane bridge with single 4 lane bridge on SR 138 overBig Rock Wash | 500,000 | |||||||
| 2618 | Grade Separation at Cesar Chavez Parkway and Harbor Drive, San Diego | 500,000 | |||||||
| 2762 | Conduct traffic study ofproposed realignment of Nutwood Ave in Fullerton | 500,000 | |||||||
| 2835 | Provide landscape enhancement of an existing open culvert on Atherton Street, Long Beach | 500,000 | |||||||
| 2883 | Construct pedestrian sidewalk enhancements in Beliflower | 500,000 | |||||||
| 3145 | Citywide traffic signal upgrades requireing the installation of hardware and software at 9 major intersection, Palo Alto | 500,000 | |||||||
| 3167 | Construct grade separations at Washington Ave & UPRR crossing east and Washington Ave & La Cadena Drive in Colton | 500,000 | |||||||
| 326 | Construct a raised landscaped median on Alondra Blvd between Clark Ave and WoodruffAve in Beliflower | 400,000 | |||||||
| 379 | Construct Class I bike and pedestrian path from San Luis Obispo to Avila Beach | 400,000 | |||||||
| 732 | Riverside Drive Improvements, Los Angeles | 400,000 | |||||||
| 1388 | Reconstruct BloomfieldAv. with medians from Carson St. to north city limits in Hawaiian Gardens | 400,000 | |||||||
| 1609 | Project Study Reports for 1-105 and 1-405 Interchanges at Los Angeles International Airport | 400,000 | |||||||
| 1770 | Extension of a regional Class I bikeway from the West City limits to the East City limits along leased railroad right-of- away | 400,000 | |||||||
| 1816 | Improvement of intersection at Burbank Blvd. and Hayvenhurst Ave | 400,000 | |||||||
| 1933 | Construct two right hand turn for Byzantine Latino Quarter transit plazas at Normandie and Pico, and Hoover and Pico, Los Angeles | 400,000 | |||||||
| 1955 | Improvements to US-101 ramps between Winnetka Ave. and Van Nuys Blvd | 400,000 | |||||||
| 2651 | Construct crosswalk bump-outs and related streetscape improvements on Temple St between Hoover St and Glendale Blvd. Los Angeles | 400,000 | |||||||
| 3126 | Reconstruct Rosecrans Av. And construct bus pads from Garfield to Century Bl. In Paramount | 400,000 | |||||||
| 84 | Adams Street Rehabilitation Project, Glendale | 388,000 | |||||||
| 3066 | Construct parking facility and improve access to Imperial Vally Expo | 377,500 | |||||||
| 2517 | Widen Maine Avenue in Baldwin Park | 375,000 | |||||||
| 1274 | Upgrade Bellflower intersections at Alondra Blvd and at Rosecrans Ave in Bellflower | 350,000 | |||||||
| 1883 | Planning for Orange Line Mag Lev from downtown Los Angeles to central Orange County | 350,000 | |||||||
| 122 | Willow and Herndon Traffic Flow Improvements, City of Clovis | 300,000 | |||||||
| 167 | Construct pedestrian, bicycle and ADA accessible boardwalks at the Pismo Beach Promenade in San Luis Obispo County | 300,000 | |||||||
| 471 | San Gabriel Blvd Rehabilitation Project — Mission Rd to Broadway, San Gabriel | 300,000 | |||||||
| 489 | Pasadena Ave/Monterey Rd Partial Grade Separation- Prelim Engineering-- Feasibility, So. Pasadena | 300,000 | |||||||
| 938 | Repair and realignment of Brahma Dr. and Winnetka Ave | 300,000 | |||||||
| 1436 | Alameda Corridor-East Construction Authority, San Gabriel Valley | 300,000 | |||||||
| 2965 | ModfIes 9 traffic signals between Willow Road and Middlefield Road and Hamilton Avenue, Menlo Park | 300,000 | |||||||
| 3067 | Develop bicycle paths and pedestrian access to Third Avenue Chula Vista | 300,000 | |||||||
| 594 | Reduce Orange County Congestion Program | 250,000 | |||||||
| 1655 | Landscape south side of the 91 fwy at Bellflower Blvd in Bellflower | 250,000 | |||||||
| 2405 | Acquire lands adjacent to US 101 as part of Southern Santa Clara County Wildlife Corridor Protection and Scenic Enhancement Project | 250,000 | |||||||
| 3308 | Walnut Grove at Broadway Intersection Capacity Enhancements, San Gabriel | 250,000 | |||||||
| 2978 | Develop conceptual master plan to improve the efficiency of transportation facilities, Covina | 215,000 | |||||||
| 1579 | San Gabriel Blvd Intersection Improvements at Broadway and at Las Tunas, San Gabriel | 200,000 | |||||||
| 1703 | Implement Northeast San Fernando Valley Road and Safety Improvements | 200,000 | |||||||
| 2299 | Widen Haskell Avenue between Chase St. and Roscoe Blvd | 200,000 | |||||||
| 2538 | Construct traffic intersection island improvements on North side of Olympic Blvd where Irolo St. and Normandie Ave. split in Koreatown, Los Angeles | 200,000 | |||||||
| 2690 | San Gabriel Blvd and Mission Road Intersection Improvements, San Gabriel | 200,000 | |||||||
| 2811 | San Gabriel Blvd Rehabilitation Project — Broadway to Las Tunas, San Gabriel | 200,000 | |||||||
| 3284 | Improve West Adams Blvd Streetscape in West Adams Historic District, Los Angeles | 200,000 | |||||||
| 1181 | Improvement of intersection at Burbank Blvd. and Woodley Ave | 160,000 | |||||||
| 2389 | Las Tunas Drive Pedestrian Enhancement, San Gabriel | 150,000 | |||||||
| 2750 | Engineering support to I-S Joint Powers Authority to widen 1- 5 freeway and improve corridor arterials from 1-710 to Orange County line | 150,000 | |||||||
| 2812 | Signal upgrades on Avenida de las Flores, Melinda Road, Avenida de las Banderas, and Alma Aldea, Rancho Santa Margarita, Cahfornia | 125,200 | |||||||
| 388 | Construction of a traffic signal at the intersection of Independence Avenue and Sherman Way | 125,000 | |||||||
| 2634 | Construction of a traffic signal at the intersection of Hamlin St. and Corbin Ave | 125,000 | |||||||
| 3201 | Construction of a traffic signal at the intersection of Oso Ave. and Vancowen St | 125,000 | |||||||
| 937 | Rehabilitate street surfaces in Sherman Oaks | 124,000 | |||||||
| 2591 | Install traffic signal on Balboa Blvd. at Knollwood Shopping Center | 120,000 | |||||||
| 891 | Rosemead Boulevard/Highway 19 Renovation Project, Pico Rivera | 100,000 | |||||||
| 2045 | Project to evaluate air quality and congestion mitigation benefits of a Hybrid Utility Vehicle in Santa Barbara County | 100,000 | |||||||
| 2617 | Gale Avenue widening between Fullerton Road and Nogales Street, and Nogales Street widening at Gale Avenue | 100,000 | |||||||
| 2828 | Implement streetscape improvements along Wilbur Avenue to enhance traffic and pedestrian safety | 100,000 | |||||||
| 1228 | Improve the Rosecrans Ave and Alondra Blvd bridges over the San Gabriel River in Bellflower | 50,000 | |||||||
| 1531 | Construction of a smart crosswalk system at the intersection of Arminta St. and Mason Ave | 50,000 | |||||||
| 1867 | Construction of a smart crosswalk system at the intersection of Topanga Canyon Blvd. and Gault St | 50,000 | |||||||
| 3062 | Conduct environmental review of proposed improvements related to the connection of Dumbarton Bridge to Highway 101 | 50,000 | |||||||
| 3157 | Rehabilitate street surface of Addison St. between Kester Ave. and Lemona Ave. | 47,000 | |||||||
| 550 | Rehabilitate street surface of Cedros Avenue between Burbank Blvd. and Magnolia Blvd | 43,000 | |||||||
| 2345 | Upgrade first responders signal pre-emption hardware, Culver City | 32,000 | |||||||
| 3175 | SR 91 I 605 Needs Assesment Study, Whittier, CA | 16,000 | |||||||
| Total California Projects: | 980,837,000 | ||||||||
| Source: Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org | |||||||||