| House TEA LU - FHWA High Priority Project Earmarks | House TEA LU - FHWA High Priority Project Earmarks | ||||||||||||
| Allocations for High Priority Projects Specified in TEA LU Bill as Passed by House T&I Committee on 3/24/04 - PRIOR TO FLOOR CONSIDERATION | California Earmarks for High Priority Projects Specified in TEA LU Bill, H.R. 3550, Version as Passed by House T&I Committee on 3/24/04, but before Adoption of Manager's Amendment on House Floor on 4/1/2004 | ||||||||||||
| TEA LU High Priority Projects | Popn. 2003 | Per Capita | Population 2003 | 33,461,000 | Widen State Route 46 to four lanes between Airport Road and the Shandon Rest Stop in San Luis Obispo County. | ||||||||
| Total Funds | % of all $ | % of States $ | % of States | HPP Funds | 18,500,000 | Build interchange connecting State Route 99 to newly aligned State Hwy 132, Modesto. | |||||||
| U.S. Total | 8,568,069,511 | 100.00 | 15,500,000 | Alameda Corridor East Gateway to America Trade Corridor Project, Highway-railgrade separation along 35-mile corridor from Alameda Corridor to LA/S.Bern County Line | |||||||||
| U.S. States Total | 8,521,069,511 | 100.0 | 100.00 | 29.30 | 290,809,777 | 15,000,000 | Upgrade Route 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County. | ||||||
| 15,000,000 | Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego. | ||||||||||||
| Alabama | 146,000,000 | 1.70 | 1.71 | 1.55 | 32.44 | 4,500,752 | 14,000,000 | Widen State Route 99 to six lanes between Kingsburg and Selma, Fresno County. | |||||
| Alaska | 75,300,000 | 0.88 | 0.88 | 0.22 | 116.06 | 648,818 | 14,000,000 | Construct nine rail-highway grade separations along Alameda Corridor East through cities of Fullerton, Placentia and Anaheim. | |||||
| Arizona | 52,500,000 | 0.61 | 0.62 | 1.92 | 9.41 | 5,580,811 | 14,000,000 | Development study of the Riverside-Orange corridor
through the Community Environmental Transportation Acceptibility Process (CETAP). |
|||||
| Arkansas | 103,960,000 | 1.21 | 1.22 | 0.94 | 38.14 | 2,725,714 | 13,000,000 | Widen the Marin-Sonoma Narrows section of Highway 101 to include a carpool HOV lane in each direction. | |||||
| California | 938,897,000 | 10.96 | 11.02 | 12.20 | 26.46 | 35,484,453 | 13,000,000 | Upgrade and reconstruct the I-80/I-680/SR 12 Interchange, Solano County. | |||||
| Colorado | 92,000,000 | 1.07 | 1.08 | 1.56 | 20.22 | 4,550,688 | 12,900,000 | Construct an auxiliary lane on Highway 17 between Camden and Hamilton Avenues, Campbell. | |||||
| Connecticut | 62,000,000 | 0.72 | 0.73 | 1.20 | 17.80 | 3,483,372 | 12,600,000 | Construct a diamond interchange on State Route 60 at Lemon Avenue in the city of Diamond Bar. | |||||
| Delaware | 7,500,000 | 0.09 | 0.09 | 0.28 | 9.17 | 817,491 | 12,000,000 | Geary Boulevard Improvements, San Francisco. | |||||
| District of Columbia | 55,000,000 | 0.64 | 0.65 | 0.19 | 97.62 | 563,384 | 10,000,000 | Construct highway connecting State Route 78/86 and State Route 111, Brawley. |
|||||
| Florida | 442,750,000 | 5.17 | 5.20 | 5.85 | 26.01 | 17,019,068 | 10,000,000 | Reconstruct the interchange of I-5 and Richards Blvd and
other improvements. |
|||||
| Georgia | 203,580,000 | 2.38 | 2.39 | 2.99 | 23.44 | 8,684,715 | 10,000,000 | The Foothill South Project will construct 16 miles of a
six lane limited access highway system. |
|||||
| Hawaii | 28,000,000 | 0.33 | 0.33 | 0.43 | 22.26 | 1,257,608 | 10,000,000 | Replacement of exisitng 2 lane interchange to full 6 lane
interchange where Cajalco Road and I-15 meet in Corona, CA. |
|||||
| Idaho | 23,500,000 | 0.27 | 0.28 | 0.47 | 17.20 | 1,366,332 | 10,000,000 | Golden Gate Bridge Seismic Retrofit | |||||
| Illinois | 437,240,000 | 5.10 | 5.13 | 4.35 | 34.55 | 12,653,544 | 10,000,000 | San Jose, I880/Coleman Avenue Interchange | |||||
| Indiana | 180,775,000 | 2.11 | 2.12 | 2.13 | 29.18 | 6,195,643 | 9,000,000 | Widen highway 101 and reconstruct offramps between Steel Lane & the town of Windsor |
|||||
| Iowa | 136,400,000 | 1.59 | 1.60 | 1.01 | 46.33 | 2,944,062 | 9,000,000 | Folsom Blvd and Power Inn Rd widening and Improvements | |||||
| Kansas | 95,000,000 | 1.11 | 1.11 | 0.94 | 34.88 | 2,723,507 | 8,500,000 | Pine Avenue extension from route 71 from Pomona
Rincon Road in the City of Chino. |
|||||
| Kentucky | 84,000,000 | 0.98 | 0.99 | 1.42 | 20.40 | 4,117,827 | 8,000,000 | Construct
bypass along California Hwy 101 around the town of Willits. |
|||||
| Louisiana | 145,650,000 | 1.70 | 1.71 | 1.55 | 32.39 | 4,496,334 | 8,000,000 | Upgrade and reconstruct the I-80/I-680/SR 12
Interchange, Solano County. |
|||||
| Maine | 58,700,000 | 0.69 | 0.69 | 0.45 | 44.96 | 1,305,728 | 8,000,000 | Realign California State Route 299 between the Trinity
County line and mile marker 7.4, Shasta County. |
|||||
| Maryland | 193,380,000 | 2.26 | 2.27 | 1.89 | 35.10 | 5,508,909 | 8,000,000 | Improvements for Folsom Boulevard between Rod
Beaudry Drive and Sunrise Boulevard. |
|||||
| Massachusetts | 159,900,000 | 1.87 | 1.88 | 2.21 | 24.85 | 6,433,422 | 8,000,000 | Widen State Route 112 to four lanes through Jamieson
Canyon (between Interstate 80 and SR 29). |
|||||
| Michigan | 245,910,000 | 2.87 | 2.89 | 3.47 | 24.40 | 10,079,985 | 7,500,000 | Upgrade San Fernando Road corridor to include
traffic calming measures, Los Angeles. |
|||||
| Minnesota | 197,400,000 | 2.30 | 2.32 | 1.74 | 39.02 | 5,059,375 | 7,500,000 | State Route 44 Interchange construction | |||||
| Mississippi | 97,000,000 | 1.13 | 1.14 | 0.99 | 33.67 | 2,881,281 | 7,300,000 | Replace SR22 Interchanges and Bridges, Garden Grove. | |||||
| Missouri | 191,000,000 | 2.23 | 2.24 | 1.96 | 33.48 | 5,704,484 | 7,036,110 | Eucalyptus/Peyton Drive intersection improvements in the
City of Chino Hills. |
|||||
| Montana | 50,000,000 | 0.58 | 0.59 | 0.32 | 54.49 | 917,621 | 7,000,000 | Reconstruction of Sheldon Road and SR 99 Interchange,
Elk Grove, CA. |
|||||
| Nebraska | 70,800,000 | 0.83 | 0.83 | 0.60 | 40.71 | 1,739,291 | 7,000,000 | Reconstruct Intersections at Highways 152 & 156,
Santa Clara County. |
|||||
| Nevada | 97,500,000 | 1.14 | 1.14 | 0.77 | 43.50 | 2,241,154 | 6,700,000 | 405 Freeway Widening. | |||||
| New Hampshire | 16,444,000 | 0.19 | 0.19 | 0.44 | 12.77 | 1,287,687 | 6,500,000 | Improve access roads to Beale Air Force Base (Spenceville, Smartville, Hammanton-Smartville, and North Beale Roads). | |||||
| New Jersey | 244,150,000 | 2.85 | 2.87 | 2.97 | 28.26 | 8,638,396 | 6,500,000 | Widen roads, construct bicycle lane and parking facility
to enhance access to Hansen Dam Recreation Area, Los Angeles. |
|||||
| New Mexico | 72,000,000 | 0.84 | 0.84 | 0.64 | 38.41 | 1,874,614 | 6,400,000 | State Route 67 (Mapleview to Dye Rd) Project
Studies/ Environmental Phase. |
|||||
| New York | 575,600,000 | 6.72 | 6.76 | 6.60 | 29.99 | 19,190,115 | 6,400,000 | State Route 52 East upgrade (SR 125 to SR 67). | |||||
| North Carolina | 217,275,000 | 2.54 | 2.55 | 2.89 | 25.84 | 8,407,248 | 6,000,000 | Replace South Access to Golden Gate Bridge, San Francisco. |
|||||
| North Dakota | 24,000,000 | 0.28 | 0.28 | 0.22 | 37.86 | 633,837 | 6,000,000 | Construct Silicon Valley Transportation Incident Management Center, San Jose. |
|||||
| Ohio | 317,567,000 | 3.71 | 3.73 | 3.93 | 27.77 | 11,435,798 | 6,000,000 | Improve farm to market roads in Tulare County. | |||||
| Oklahoma | 101,000,000 | 1.18 | 1.19 | 1.21 | 28.76 | 3,511,532 | 6,000,000 | Rosecrans Avenue/Aviation Boulevard/Douglas Street improvements to reduce congestion and improve traffic flow, El Segundo. |
|||||
| Oregon | 154,652,000 | 1.80 | 1.81 | 1.22 | 43.45 | 3,559,596 | 6,000,000 | Adds NB lane & auxiliary lanes on I-4 and widens I-8 west to I-5 north, San Diego | |||||
| Pennsylvania | 398,139,025 | 4.65 | 4.67 | 4.25 | 32.20 | 12,365,455 | 5,650,000 | I-5 CIP adds general purpose lanes, HOV lanes &
corridor arterial improvements from SR 91 to I-710 |
|||||
| Rhode Island | 22,000,000 | 0.26 | 0.26 | 0.37 | 20.44 | 1,076,164 | 5,630,000 | Widen & realign Cherry Avenue from 19th Street to one
block south of Pacific Coast Highway, Signal Hill. |
|||||
| South Carolina | 145,000,000 | 1.69 | 1.70 | 1.43 | 34.96 | 4,147,152 | 5,500,000 | Construct Coyote Creek Trail from Kelly Park to
Berryessa station, San Jose. |
|||||
| South Dakota | - | - | - | 0.26 | - | 764,309 | 5,500,000 | Construct Guadalupe River Trail project from highway 237 to I-880, San Jose. | |||||
| Tennessee | 195,800,000 | 2.29 | 2.30 | 2.01 | 33.52 | 5,841,748 | 5,000,000 | 8.5 miles of six and eight lane arterial roadways,
building an essential eastwest route across Santa Clarita Valley. |
|||||
| Texas | 674,500,000 | 7.87 | 7.92 | 7.61 | 30.49 | 22,118,509 | 5,000,000 | Construct Daggett Road and Bridge Project, Port of Stockton, CA. |
|||||
| Utah | 56,250,000 | 0.66 | 0.66 | 0.81 | 23.92 | 2,351,467 | 5,000,000 | Widening of State Route 76 from Melrose Drive to I-5. | |||||
| Vermont | 13,414,486 | 0.16 | 0.16 | 0.21 | 21.67 | 619,107 | 5,000,000 | Develop bicycle paths and public park space adjacent
to the New River, Calexico. |
|||||
| Virginia | 134,975,000 | 1.58 | 1.58 | 2.54 | 18.27 | 7,386,330 | 5,000,000 | Widen and reconstruct Arch-Sperry Road to improve connection between Interstate 5 and State Route 99, San Joaquin County. |
|||||
| Washington | 171,850,000 | 2.01 | 2.02 | 2.11 | 28.03 | 6,131,445 | 5,000,000 | Monterey Bay Sanctuary Scenic Tail - connect missing segments of a bike and pedestrian trail around the Monterey Bay National Marine Sanctuary. |
|||||
| West Virginia | 106,000,000 | 1.24 | 1.24 | 0.62 | 58.55 | 1,810,354 | 5,000,000 | Widen State Route 98 from Route 111 to State Route 7,
Calexico. |
|||||
| Wisconsin | 198,811,000 | 2.32 | 2.33 | 1.88 | 36.33 | 5,472,299 | 5,000,000 | Design and Implement Trails and Bikeway Plans for the
Golden Gate National Recreation Area and Presidio. |
|||||
| Wyoming | 10,000,000 | 0.12 | 0.12 | 0.17 | 19.95 | 501,242 | 5,000,000 | Construct Illinois Street Bridge/Amador Street Connection and Improvements, San Francisco. | |||||
| Puerto Rico | 10,000,000 | 0.12 | 5,000,000 | Planning, engineering, and construction of a tunnel on SR
75/282 to Naval Air Station, San Diego. |
|||||||||
| American Samoa | 14,000,000 | 0.16 | 5,000,000 | Upgrade Kanan Road interchange at US 101 (Aguora Hills) to improve safety and accessibility. | |||||||||
| Guam | 9,000,000 | 0.11 | 5,000,000 | For environmental review and preliminary engineering for a
freeway-to-freeway interchange connecting Interstate 5 to State Route 78. |
|||||||||
| N. Mariana Islands | - | - | 5,000,000 | Preparation of environmental documents and design for conversion of the reliquished railroad bridge over the Feather River between Yuba City and Marysville | |||||||||
| Virgin Islands | 14,000,000 | 0.16 | 5,000,000 | Alameda Co. Construct I580 Corr. HOV Projects | |||||||||
| 5,000,000 | Rancho Cucamonga, I-15 Base Line Interchange Aux lanes and ramps | ||||||||||||
| NOTE: House TEA LU bill authorizes $11.1 billion for HPPs over 6 years. The additional $2.5 billion above the amount spent (shown here) will be allocated at a later time. | 5,000,000 | Contra Costa County Brentwood Tracy Express way study and construct | |||||||||||
| 4,856,000 | Improvements to interchange between SR 23 and SR 101.
Could include wideing of SR 23 from 2 lanes to 3. |
||||||||||||
| 4,700,000 | Port of Hueneme Intermodal Access Improvement
Project including grade separaiton at Rice Avenue/State Route 34; road widening at Hueneme Road. |
||||||||||||
| Source: Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org | 4,644,000 | Utilize funds over
a four-year period to reconstruct and deep-lift asphalt on various roads thorughout the district in Santa Barbara County. |
|||||||||||
| 4,500,000 | Construciton of interchange at State Hwy 86 at Ave 66
in Coachella, CA. |
||||||||||||
| 4,400,000 | 4-lane overpass for Mission Blvd grade separation
project, City of Pomona. |
||||||||||||
| 4,240,000 | Realignment of La Brea Avenue to reduce congestion, Inglewood. |
||||||||||||
| 4,200,000 | Construct Route 101 Auxiliary Lanes 3rd Avenue in the
city of San Mateo to Millbrae Ave in Millbrae. |
||||||||||||
| 4,000,000 | Reconstruct and widen Garfield Ave bridge over Rio
Hondo River Channel and apply seismic improvements, South Gate. |
||||||||||||
| 4,000,000 | Reconstruct overcrossing and interchange at Interstate
10 & Tippacanoe Ave in Loma Linda. |
||||||||||||
| 4,000,000 | Construct truck lane from Britannia Blvd to the Otay
Mesa Port Entry, San Diego County. |
||||||||||||
| 4,000,000 | Construction of new freeway lanes, including HOV lanes
at US HWY 50 and Empire Ranch Road, Folsom,CA. |
||||||||||||
| 4,000,000 | Widen South Main Street/Soda Bay Road between CR 400A/miler marker 0.0-mile marker 0.7 and CR502/mile marker 0.0 and mile marker 0.9. |
||||||||||||
| 4,000,000 | Widen Avenue P to six lanes to alleviate trafic congestion in Palm Dale, CA. | ||||||||||||
| 4,000,000 | Bay Road improvements between Clarke Avenue and Cooley Landing. Northern access improvements between University and Illinois Avenue, East Palo Alto. |
||||||||||||
| 4,000,000 | Conduct Study and Construct McKinley Intechange at
SR 120 Project, Manteca, CA. |
||||||||||||
| 4,000,000 | SF, Implement ITS on Muni Transit | ||||||||||||
| 4,000,000 | I-5/SR-56 Connector | ||||||||||||
| 3,800,000 | Widen State Route 99 between Tulare and Kingsburg, CA. | ||||||||||||
| 3,750,000 | Improvements (including arterial streets rehabilitation)
to enhance traffic and pedestrian safety in Northridge, Granada Hills, and Porter Ranch, Los Angeles. |
||||||||||||
| 3,670,000 | Salinas Airport Boulevard/Hwy 101 interchange -- new 4 lane overpass with 2 lanes each direction, new approaches, new southbound on/off ramps, bicycle lanes. | ||||||||||||
| 3,670,000 | Santa Cruz Highway 1 widening and HOV Lanes | ||||||||||||
| 3,660,000 | Holllister SR25 widening --4 lane freeway between San
Felipe Road to the US 101 separation, Gilroy. |
||||||||||||
| 3,520,000 | Multi Year Riverside and Orange County Major investment Study and Phase work | ||||||||||||
| 3,500,000 | Construct Cypress Avenue over-pass to separate Interstate 10 and Union Pacific Railroad tracks, Fontana. |
||||||||||||
| 3,500,000 | Implement streetscape project on Central Avenue from 103rd Street to Watts/103rd Street Station , Watts. |
||||||||||||
| 3,500,000 | Santa Clara County, aux., bike and ped. Improvements-Almaden Expressway | ||||||||||||
| 3,400,000 | Widen Santa Maria River Bridge on U.S. Highway 101 between Santa Barbara County and San Luis Obispo Co. |
||||||||||||
| 3,250,000 | Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in Reseda, Canoga Park, and Winnetka, Los Angeles. |
||||||||||||
| 3,250,000 | Diesel Emissions Reduction Program for Gateway
Cities Council of Governments. |
||||||||||||
| 3,000,000 | Improvements for the Watt Avenue corridor between Antelope Road and the Capital City Freeway. |
||||||||||||
| 3,000,000 | Resurface and construct truck lane at CA Hwy. 94 and Interstate 8 interchange, Boulevard. | ||||||||||||
| 3,000,000 | Construction of the improvements to the Western Placerville Interchanges on SR50 between the Missouri Flat Road Over-crossing and the Placerville Drive under-crossing in and near the City of Placerville in El Dorado C | ||||||||||||
| 3,000,000 | Construct off ramp at Interstate 8/Imperial Avenue Interchange, El Centro. |
||||||||||||
| 3,000,000 | Coastal Corridor Investments Phase II -A -
multi-modal improvements on Rosecrans Avenue between Sepulveda Blvd and I-405, El Segundo. |
||||||||||||
| 3,000,000 | Reconstruct and widen Del Mao Blvd to four lanes
between Normadie Ave andNew Hampshire Ave, Los Angeles County |
||||||||||||
| 3,000,000 | Gateway Cities intelligent management and logistics
freight movement measures |
||||||||||||
| 3,000,000 | Mitigate congestion & operation problems along Harbor Blvd. Between I-405 southbound offramp & Sunflower Ave. | ||||||||||||
| 3,000,000 | Intelligent Transportation Systems on Long Beach Boulevard, Compton Boulevard, Wilmington Avenue, Walnut Avenue incl. interface with the L.A. County ITS system. | ||||||||||||
| 3,000,000 | Widen State Route 98, including storm drain improvements, from Kloke Road to State Route 111, Calexico. | ||||||||||||
| 3,000,000 | Constructs a Highway and Railroad grade separation at
North Milliken Avenue, Ontario. |
||||||||||||
| 3,000,000 | Repair and replace tunnel lining on Kanan, Kanan Dume,
and Malibu Canyon Roads, Los Angeles County. |
||||||||||||
| 3,000,000 | Widen Washington Boulevard, Commerce. | ||||||||||||
| 3,000,000 | Reconstruct interchange with partial-cloverleaf on-rmap for south-bound traffic entering I-80 from Central Avenue, City of Richmond. | ||||||||||||
| 3,000,000 | Technical Feasibility Study for the 710 Tunnel to connect
the 710 to the 210. |
||||||||||||
| 3,000,000 | Provide widening of the exisitng two-lane railroad underpass on SR89 in Nevada County. | ||||||||||||
| 3,000,000 | Construct new ramps to Route 262, widen 262,
reconstruct railroad bridges, Fremont. |
||||||||||||
| 3,000,000 | Interchange improvements at Rice Avenue and US
Highway 101, City of Oxnard. |
||||||||||||
| 3,000,000 | Arcadia, Santa Anita Ave. Corridor Improvement project | ||||||||||||
| 3,000,000 | Placer County Ferrari Interchange Project | ||||||||||||
| 2,800,000 | Reconstruct interchange at I-10 and Riverside Avenue to
improve traffic, Rialto. |
||||||||||||
| 2,500,000 | Traffic signal upgrade, road configuration, and median
strip improvements to Lakewood Blvd between Telegraph Rd and Gardendale St, Downey. |
||||||||||||
| 2,500,000 | Mid
Valley Station Road and Inter-Modal Improvement Project. |
||||||||||||
| 2,500,000 | Will
add landscaping enhancements along the freeway for aesthetic purposes in Ventura County. |
||||||||||||
| 2,500,000 | Pasadena Multi-modal intelligent transportation
system: traffic management center upgrade, transit management system , parking guidance system, the City of Pasadena. |
||||||||||||
| 2,500,000 | Improve Glendale Freeway Terminus to provide
pedestrian access, construct sound barriers, and implement landscaping, Los Angeles. |
||||||||||||
| 2,500,000 | Reconstruct segments of Hollister Avenue between San Antonio Road and State Route 154, Santa Barbara County. |
||||||||||||
| 2,500,000 | Transportation enhancements on Slauson Ave and
Atlantic Blvd, Maywood. |
||||||||||||
| 2,500,000 | Construct a 2.8 mile bikeway, working in conjuction with
the City of La Habra, along Lambert Road from Mills Ave to Valley Home Ave. |
||||||||||||
| 2,500,000 | Construct truck lane on Keystone Road from State Route 111 to Austin Road, Imperial County. | ||||||||||||
| 2,500,000 | I-880 Federal highway safety improvements, High Street to
I-980, Oakland. |
||||||||||||
| 2,500,000 | Imperial Co. I8 Widening overpass at Dogwood Rd. | ||||||||||||
| 2,500,000 | Downey, Fiestone Blvd. Widen and add turn lane | ||||||||||||
| 2,500,000 | City of Livermore, Upgrad and Reconstruct 1580/Vasco Rd. Interchange | ||||||||||||
| 2,400,000 | Construct right turn lanes, bus turn out lanes, right of
way, traffic signals. |
||||||||||||
| 2,300,000 | Improvement of Culver Boulevard between Elenda and Sepulveda; Sepulveda Blvd between Green Valley Circle and Jefferson Boulevard, Culver City. |
||||||||||||
| 2,200,000 | Reconstruct 1.1 miles of Long Beach Blvd from
Imperial Hwy to Tweedy Blvd., Lynwood. |
||||||||||||
| 2,150,000 | Construction of 7 grade separations in cities of Sante
Fe Springs, Pico Rivera, and La Mirada along BNSF Railway. |
||||||||||||
| 2,000,000 | Improvement of intersection at Aviation Blvd. And Rosecrans Ave. to reduce congestion, Hawthorne. |
||||||||||||
| 2,000,000 | Construction of interchange on Interstate 10 at Palm Drive | ||||||||||||
| 2,000,000 | Expand carsharing pilot program to serve low- and moderate-income neighborhoods in the City and County of San Francisco. |
||||||||||||
| 2,000,000 | Reconstruct I-880/Route 92 Interchange, Hayward. | ||||||||||||
| 2,000,000 | Widening on Bear Valley Pkwy, City of Escondido,
Citrus Avenue to Valley Pkwy and to northern city limit, local arterial. |
||||||||||||
| 2,000,000 | Improvements to increase beach access, prevent storm drain failure and accommodate increasing pedestrian traffic on The Stand, Manhattan Beach. |
||||||||||||
| 2,000,000 | Upgrade Jepson Parkway at the North and South Access Gates of Travis Air Force Base and widen Vanden Road segment , Solano County. |
||||||||||||
| 2,000,000 | Construciton of a .2 miles section of Pointsettia Lane in
the City of Carlsbad, local arterial. |
||||||||||||
| 2,000,000 | Realign State Route 79 from Gilman Springs Road to Domenigoni Parkway in San Jacinto. |
||||||||||||
| 2,000,000 | Construct grade separation at State College Blvd.,
Fullerton /Anaheim. |
||||||||||||
| 2,000,000 | Improve 16 roads, bridge and one bike path in Mariposa
County. |
||||||||||||
| 2,000,000 | Widen Wilmington Ave from 223rd street including
ramp modifications, Carson. |
||||||||||||
| 2,000,000 | Improvements at First Street and Erringer Road. The project will widen off ramps and surface streets. | ||||||||||||
| 2,000,000 | Construct new interchange at I-15 and State Route 18
(Falchion Road) and provide new highway access to U.S. 395. |
||||||||||||
| 2,000,000 | Widening of two lanes SR79 highway to four lanes. | ||||||||||||
| 2,000,000 | Auburn Boulevard Reliever Route Under-grounding construction along I-80, Sacramento, CA. | ||||||||||||
| 2,000,000 | Realign Route 4 in City of Oakley bypass NW of Vintage Parkway to Main St at Second St. | ||||||||||||
| 2,000,000 | Alhambra Valley Blvd Enhancement Project | ||||||||||||
| 2,000,000 | Montclair Ramona Avenue grade separation along
Alameda Corridor East. |
||||||||||||
| 2,000,000 | Improve Ben Maddox Bridge crossing State Route 198, Visalia. | ||||||||||||
| 2,000,000 | Upgrade Olympic Boulevard between Vermont Ave and Western Ave to improve pedestrian safety and improve congestion, Los Angeles. |
||||||||||||
| 2,000,000 | Construction of HOV and BRT lanes on I-15 from SR-78
to SR-163. |
||||||||||||
| 2,000,000 | Upgrade existing county highway J59 in Toulumne, Stanislaus and Merced Counties. |
||||||||||||
| 2,000,000 | Replace Winters Bridge, Yolo County. | ||||||||||||
| 2,000,000 | I-80 to Eureka Road Interchange - Improve access
to I-80 by reducing traffic congestion at two heavily traveled on- ramps at Eureka Road and Riverside Avenue in Placer Co. |
||||||||||||
| 2,000,000 | Provides funding for the construction of auxiliary lanes
in each direction of US 101 fom Marsh Road to the Santa Clara County line. |
||||||||||||
| 2,000,000 | Oregon-Page
Mill expressway improvements between US 101 and SR 82, Palo Alto. |
||||||||||||
| 2,000,000 | Improving the interchanges on I-5 at Genesee Ave and Sorrento Valley Blvd. |
||||||||||||
| 2,000,000 | This project will widen the northbound ramps and widen the
southbound ramps at the I-15 and SR-79 south interchange |
||||||||||||
| 2,000,000 | Widen the Mountain View Avenue Bridge in Loma Linda. | ||||||||||||
| 2,000,000 | Builds a pedestrian bridge form Hiller Street to the Bay
Trail, Belmont. |
||||||||||||
| 2,000,000 | Construct a soundwall along Esperanza Road in the City
of Yorba Linda. |
||||||||||||
| 2,000,000 | Montclair Monte Vista Avenue grade separation along Alameda Corridor East. |
||||||||||||
| 2,000,000 | Improve SR219 to 4-lanes in the cities of Riverside, Oakdale and Modesto. | ||||||||||||
| 2,000,000 | Temecula Winchester Project- This project will require
a partial cloverleaf interchange on I-15 at exit/entrance ramps at Winchester Road. |
||||||||||||
| 2,000,000 | Conduct Study of State Route 130 Realignment Project,
San Joaquin County and Santa Clara County. |
||||||||||||
| 2,000,000 | Murrieta, Los Alamos Rd. I15 Interchange Improvements | ||||||||||||
| 2,000,000 | Placer County, Sierra College I-80 Interchange Project. Design Deficiencies | ||||||||||||
| 2,000,000 | Solano County Cordellia Hill/ Sky Valley, transportation enhancement project | ||||||||||||
| 2,000,000 | Hesperia, Install new crossing at Ranchero Road | ||||||||||||
| 1,900,000 | Widening the Fairview Road bridge over I,
widening the onramp to accommodate three lanes, and provide one right-turn lane, one optional through or right lane and three through lanes. |
||||||||||||
| 1,900,000 | I-238 Widening between I-580 and I-880, Ashland, Cherryland/San Leandro/San Lorenzo. |
||||||||||||
| 1,750,000 | Upgrade and extend Commerce Avenue, City of Concord. | ||||||||||||
| 1,600,000 | I605 Interchange Construction Arrow Highway and Live Oak Ave., Irwindale | ||||||||||||
| 1,500,000 | Rehabilitate arterials, Compton… | ||||||||||||
| 1,500,000 | Construct pedestrian streetscape improvements on
Ocean Blvd and Anaheim Street in Long Beach, including lighting landscaping and irrigation, and seating, drinking fountains, bicycle racks and trash receptacles. |
||||||||||||
| 1,500,000 | Improve Ave 12-Fwy 99 interchange; create five lanes and
install traffic signals. Construct Road 29 entrance east of the interchange. |
||||||||||||
| 1,500,000 | I-80 Gilman Street interchange improvements, Berkeley. | ||||||||||||
| 1,500,000 | Upgrade roads, traffic signals and turn lanes in order to
ease traffic congestion for the Willow/Ashlan & Shaw intersections. |
||||||||||||
| 1,500,000 | Add carpool lane and truck lane on Interstate 5 in Santa
Clarita Valley, CA. |
||||||||||||
| 1,500,000 | Grade separation of Lenwood Road in Barstow, CA. | ||||||||||||
| 1,500,000 | Construct truck ramp linking Interstate 5 to National City
Marine Cargo Terminal, Naitonal City. |
||||||||||||
| 1,500,000 | Construct Inland Empire transportaiton Management
Center to better regulate traffic and dispatch personnel to incidents, Fontana. |
||||||||||||
| 1,500,000 | Replace Route 1 San Pedro Creek bridge, Pacifica. | ||||||||||||
| 1,500,000 | Fresno, Upgrade Save Mart Center intersection | ||||||||||||
| 1,500,000 | Victorville, I15 Interchange | ||||||||||||
| 1,300,000 | Campbell, Add Turn Lane and Technology to San Thomas Expressway and Hamilton Ave intersection | ||||||||||||
| 1,250,000 | Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in Sylmar, Lake View Terrace, and Mission, Los Angeles. |
||||||||||||
| 1,250,000 | First Street Bridge realignment, Los Angeles. | ||||||||||||
| 1,250,000 | Widening Mt Vernon Ave bridge to four lanes, Colton. | ||||||||||||
| 1,250,000 | Reconstruct 1.5 miles of Paramount Blvd from Carson Street to Candlewood St., Lakewood. | ||||||||||||
| 1,250,000 | FHWA Diesel Emissions Reduction Program for the Gateway Cities. Los Angeles County. |
||||||||||||
| 1,250,000 | Construct left turn lane to ease congestion at
Interstate-10 into Rosemead Boulevard and Telstar Avenue, El Monte. |
||||||||||||
| 1,250,000 | Streetscape Improvements at E. 14th/Mission Blvd., Alameda County. |
||||||||||||
| 1,250,000 | San Bernardino, Grad Separation between State Street and BNSF Tracks | ||||||||||||
| 1,200,000 | Implement streetscape improvements on segments of Laurel Canyon Blvd. And Victory Blvd., North Hollywood. |
||||||||||||
| 1,200,000 | I-580 Castro Valley Interchange Improvements. | ||||||||||||
| 1,200,000 | Harbor Blvd Intelligent Transportation System (ITS).
Widen intersections and add lanes, Garden Grove/Anaheim |
||||||||||||
| 1,100,000 | Construct multi-use trails at Galster Park that link to
other local Los Angeles County trails, West Covina. |
||||||||||||
| 1,100,000 | Reconstruct 7 miles of Whittier Blvd, from Valley
Home (SR 72) to Riviera Rd, Whittier. |
||||||||||||
| 1,050,000 | Construct 213th Street pedestrian bridge to provide
safe passage for pedestrians and wheelchairs, Carson. |
||||||||||||
| 1,000,000 | Construct parking lot and improved museum pedestrian access from the trolley station, San Diego. |
||||||||||||
| 1,000,000 | Study
feasibility of Maglev link between San Diego and proposed San Diego Regional International Airport, Imperial County. |
||||||||||||
| 1,000,000 | Provide grade separation at the Firestone/Old River School
Road intersection, Downey. |
||||||||||||
| 1,000,000 | Improve I-8 offramp to the Desert Farming Institute,
Imperial County. |
||||||||||||
| 1,000,000 | Conduct Study and Construct I 205/Chrisman Road Interchange Project, Tracey, CA. |
||||||||||||
| 1,000,000 | Widen Boulder Avenue Bridge in Highland. | ||||||||||||
| 1,000,000 | Elk Horn Boulevard Widening to SR 99, Sacramento, CA. | ||||||||||||
| 1,000,000 | Reconstruct 152/156 Interception Project, Santa Clara
County, CA. |
||||||||||||
| 1,000,000 | Replace Davis Street Highway I-880 overpass, San Leandro | ||||||||||||
| 1,000,000 | Realign and make improvements to California Hwy 199 between mile marker 22.16 and mile marker 23.65. |
||||||||||||
| 1,000,000 | Develop and implement traffic calming measures for
traffic exiting the I-710 into Long Beach. |
||||||||||||
| 1,000,000 | Widen Harbor Blvd to 8 lanes in Anaheim Resort Area. | ||||||||||||
| 1,000,000 | Improve I-8 offramp at Octotillo to the Imperial Valley
College Desert Museum /Regional Traveler Visitor Center, Imperial County. |
||||||||||||
| 1,000,000 | Atlantic Boulevard Bridge widening, Vernon | ||||||||||||
| 1,000,000 | Conduct Study and Construct Vasco Road Safety Improvements Project, Contra Costa County, CA. |
||||||||||||
| 1,000,000 | Interchange expansion at Interstate 10 and Indian
Canyon Drive, City of Palm Springs. |
||||||||||||
| 1,000,000 | Construct 4-lane connector between I-40 and Arizona Route 95 in Needles. | ||||||||||||
| 1,000,000 | Construction of HOV lanes on I-5 from Vandegrift Blvd to
La Jolla Village Drive. |
||||||||||||
| 1,000,000 | San Gabriel Boulevard Highway widening and
intersection improvement project, the City of San Gabriel. |
||||||||||||
| 1,000,000 | Design and environmental analysis for State Route 11
connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego. |
||||||||||||
| 1,000,000 | Colima Road/Fullerton Road intersection improvements
in the city of Rowland Heights. |
||||||||||||
| 1,000,000 | Reconstruct I-710 southern terminus off ramps, Long Beach | ||||||||||||
| 1,000,000 | Improve Central Avenue Historic Corridor Streetscape, Los
Angeles. |
||||||||||||
| 1,000,000 | Improve access from I-8 and construct parking lot for the
Imperial Sand Dunes Recreation Area Visitors Center, Imperial Valley. |
||||||||||||
| 1,000,000 | Land acquisition to mitigate impacts to natural
habitats and wetlands caused by highway projects on US 1 and US 101 in areas around Solstice Canyon in the Santa Monica National Mountains Recreation Area. |
||||||||||||
| 1,000,000 | Construct overpass at Central Avenue Overpass in the Union Pacific Railroad Crossing, Newark. | ||||||||||||
| 1,000,000 | Land acquisition in Sargent Hills to mitigate
for road runoff into water sources and to protect a wildlife corridor connecting Santa Cruz Mountains to Mt. Hamilton Range, Santa Clara County. |
||||||||||||
| 1,000,000 | Construct fourth bore of Caldecott Tunnel on Route 24. | ||||||||||||
| 1,000,000 | Construct road from Mace Blvd in Yolo County to federally
supported Pacific Flyway wildlife area. |
||||||||||||
| 1,000,000 | Conduct study and Construct Lammers Rd/ I-205 Widening and Interchange Project, Tracy, CA. | ||||||||||||
| 1,000,000 | Construction of interchange at State Hwy 86 and Ave 50
in Coachella, CA. |
||||||||||||
| 1,000,000 | Quincy-Oroville Highway Rehabilitation -
Provides for 9.5 miles of pavement rehabilitaiton, culvert replacements, guardrail installation, signing and stripping in Plumas Co. |
||||||||||||
| 1,000,000 | The Esplanade improvements to reduce
pedestrian/bicycle/ automobile traffic congestion and improve oceanfront access Redondo Beach. |
||||||||||||
| 1,000,000 | Feasibility study, design, engineering, grade separation,
pedestrian improvements, and traffic calming project, the City of South Pasadena. |
||||||||||||
| 1,000,000 | Acquire approximately 4,000 acres of land at the Desert
Cahullia Prehistoric Site, Imperial County. |
||||||||||||
| 1,000,000 | Implement Congestion Mitigation and Air Quality
Improve- ment Project, Orange County. |
||||||||||||
| 1,000,000 | Danville, Camino Tassajara-Crown Canyon to East Town Project. | ||||||||||||
| 1,000,000 | Contra Costa County, Fernandez Ranch Trans Enhancements | ||||||||||||
| 1,000,000 | Millbrae, SF Bay Trail 101 bike/ped overpass | ||||||||||||
| 1,000,000 | Contra Costa Co. Improve ped and bike trails in East Bay Reg. Park District | ||||||||||||
| 838,690 | Cabot-Camino Capistrano Bridge. Construction of a
bridge that will connect highways Camino Capistrano and Cabot Road. |
||||||||||||
| 800,000 | Implement Manor Drive overpass improvement, Pacifica. | ||||||||||||
| 800,000 | Roadway surface improvments, street lighting, and storm
drain improvments to South Center Street from Baughman Road to State Route 78/86, Westmoreland. |
||||||||||||
| 800,000 | Construct Alviso Bay Trail Project, a 1.3 mile trail from
from Gold Street to San Tomas Aquino Creek, Santa Clara County. |
||||||||||||
| 784,000 | Reconstruction
and repair of pedestrian walkways in and around the campus of California State University Northridge to improve traffic and safety. |
||||||||||||
| 750,000 | Construct San Leandro-Oakland biking and hiking path. | ||||||||||||
| 750,000 | Improvements (inclusing arterial street rehabilitation) to
enhance traffic and pedestrian safety in the Van Nuys community, Los Angeles. |
||||||||||||
| 700,000 | Construct 4,700 ft. of medians to improve
safety/congestion on Imperial Highway from Valley View to Telegraph Road, La Mirada. |
||||||||||||
| 700,000 | Construct Dry Creek and Enterprise canal trails in Clovis. | ||||||||||||
| 600,000 | Provide landscape enhancement of an existing open culvert on Atherton Street, Long Beach. | ||||||||||||
| 600,000 | Repair and realignment of Brahma Drive and Winettka Avenue, which serves the students of Los Angeles Pierce College. |
||||||||||||
| 600,000 | San Gabriel City, Ped Calming Measures on Las Tunas Blvd. | ||||||||||||
| 575,000 | LA River bikeway, Sherman Oaks | ||||||||||||
| 550,000 | Construct truck lane on Baughman Road from State
Route 78/86 to Forrester Road, Westmoreland. |
||||||||||||
| 510,000 | Pedestrian Bridge Over Atlantic Boulevard, the City of
Monterey Park. |
||||||||||||
| 500,000 | Implement and maintain an incident management system for I-880 and I-80, Alameda and Contra Costa Counties. |
||||||||||||
| 500,000 | Project design, environmental assessment, and
roadway construction of Lonestar Road from Alta Road to Enrico Fermi Drive, San Diego County. |
||||||||||||
| 500,000 | Construct exit from SR 78 to SDSU Brawley Campus | ||||||||||||
| 500,000 | Citywide traffic signal upgrades requiring the
installation of hardware and software at 9 major intersections, Palo Alto. |
||||||||||||
| 500,000 | Construct Marin-Sonoma Narrows bicycle and
pedestrian walkway. |
||||||||||||
| 500,000 | Conduct a project study to examine an interchange at State Route 165 and Bradbury Road, Merced County. | ||||||||||||
| 500,000 | Study to evaluate traffic implications resulting from the
proposed re-alignment of Nutwood Avenue, Fullerton. |
||||||||||||
| 500,000 | Construct safe access to streets for bicyclists and pedestrians including crosswalks, sidewaks, and traffic calming measures, Covina. |
||||||||||||
| 500,000 | Long Beach, Paramount Blvd. Reconstruction | ||||||||||||
| 480,000 | ATIS added to the Magnolia corridor connecting
Riverside, Corona, Moreno Valley, and portions of Riverside County. |
||||||||||||
| 450,000 | Rehabilitate the pavement of Vinvcent Avenue between
Interstate I-10 and the north city limit, West Covina. |
||||||||||||
| 400,000 | Costruct A 2.8 mile bikeway, working in conjuction with
the city of Whittier, that will connect four other regional trails and bikeways. |
||||||||||||
| 400,000 | Reconstruct Carson w/ on/off ramp I 605 Hawaiian Gardens | ||||||||||||
| 350,000 | Traffic signal upgrades on Bellflower Blvd at Alondra Blvd and Rosecrans Ave, Bellflower. | ||||||||||||
| 300,000 | Construct pedestrian bicycle and ADA accessible boardwalks at the Pismo Beach Promenade, San Luis Obispo County. |
||||||||||||
| 300,000 | Modifies 9 traffic signals between Willow Road and Middlefield Road and Hamilton Avenue, Menlo Park. |
||||||||||||
| 300,000 | Preliminary engineering and EIS/EIR process for 33-mile
long Orange Line mag-lev connecting Los Angeles with Orange County. |
||||||||||||
| 300,000 | Phase II of the Alameda Corridor East Project,
constructing grade separation projects from E. Los Angeles to Pomona. |
||||||||||||
| 300,000 | Develop bicycle paths and pedestrian access to Third
Avenue, Chula Vista. |
||||||||||||
| 215,000 | Develop conceptual master plan including economic analysis and environmental study to improve the efficiency of transportation facilities, Covina. |
||||||||||||
| 214,000 | Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in the Sherman Oaks community, Los Angeles. |
||||||||||||
| 150,000 | Construct sound barriers at the I-5/S.R. 54
Interchange, National City. |
||||||||||||
| 125,200 | Antonio Parkway Improve Signal System | ||||||||||||
| 108,000 | Install signal pre-emption hardware at 53 traffic signals
throughout Culver City to improve bus and first responder travel times. |
||||||||||||
| 100,000 | Renovation and repair of Rosemead Blvd-Hwy 19 such as
new sidewalks, traffic loops, pavement, street lights. |
||||||||||||
| 100,000 | Study economic, environmental and congestion mitigation
benefits of a Hybrid Utility Vehicle, Santa Barbara County. |
||||||||||||
| 85,000 | Install traffic signal and ramps at Interstate-10 and
Walnut Grove Avenue to reduce congestion, Rosemead. |
||||||||||||
| 75,000 | Transportation enhancements, Bellflower. | ||||||||||||
| 50,000 | Repair Rosecrans Ave and Alondra Blvd bridges, Bellflower. | ||||||||||||
| 938,897,000 | Total California High Projects | ||||||||||||
| Source: Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org | |||||||||||||