| House TEA LU - FHWA High Priority Project Earmarks | House TEA LU - FHWA High Priority Project Earmarks | ||||||||||||
| Allocations for High Priority Projects Specified in TEA LU Bill as Passed by House T&I Committee on 3/24/04 - PRIOR TO FLOOR CONSIDERATION | California Earmarks for High Priority Projects Specified in TEA LU Bill, H.R. 3550, Version as Passed by House T&I Committee on 3/24/04, but before Adoption of Manager's Amendment on House Floor on 4/1/2004 | ||||||||||||
| TEA LU High Priority Projects | Popn. 2003 | Per Capita | Population 2003 | 33,461,000 | Widen State Route 46 to four lanes between Airport Road and the Shandon Rest Stop in San Luis Obispo County. | ||||||||
| Total Funds | % of all $ | % of States $ | % of States | HPP Funds | 18,500,000 | Build interchange connecting State Route 99 to newly aligned State Hwy 132, Modesto. | |||||||
| U.S. Total | 8,568,069,511 | 100.00 | 15,500,000 | Alameda Corridor East Gateway to America Trade Corridor Project, Highway-railgrade separation along 35-mile corridor from Alameda Corridor to LA/S.Bern County Line | |||||||||
| U.S. States Total | 8,521,069,511 | 100.0 | 100.00 | 29.30 | 290,809,777 | 15,000,000 | Upgrade Route 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County. | ||||||
| 15,000,000 | Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego. | ||||||||||||
| Alabama | 146,000,000 | 1.70 | 1.71 | 1.55 | 32.44 | 4,500,752 | 14,000,000 | Widen State Route 99 to six lanes between Kingsburg and Selma, Fresno County. | |||||
| Alaska | 75,300,000 | 0.88 | 0.88 | 0.22 | 116.06 | 648,818 | 14,000,000 | Construct nine rail-highway grade separations along Alameda Corridor East through cities of Fullerton, Placentia and Anaheim. | |||||
| Arizona | 52,500,000 | 0.61 | 0.62 | 1.92 | 9.41 | 5,580,811 | 14,000,000 | Development study of the Riverside-Orange corridor
through the Community Environmental Transportation Acceptibility Process (CETAP). |
|||||
| Arkansas | 103,960,000 | 1.21 | 1.22 | 0.94 | 38.14 | 2,725,714 | 13,000,000 | Widen the Marin-Sonoma Narrows section of Highway 101 to include a carpool HOV lane in each direction. | |||||
| California | 938,897,000 | 10.96 | 11.02 | 12.20 | 26.46 | 35,484,453 | 13,000,000 | Upgrade and reconstruct the I-80/I-680/SR 12 Interchange, Solano County. | |||||
| Colorado | 92,000,000 | 1.07 | 1.08 | 1.56 | 20.22 | 4,550,688 | 12,900,000 | Construct an auxiliary lane on Highway 17 between Camden and Hamilton Avenues, Campbell. | |||||
| Connecticut | 62,000,000 | 0.72 | 0.73 | 1.20 | 17.80 | 3,483,372 | 12,600,000 | Construct a diamond interchange on State Route 60 at Lemon Avenue in the city of Diamond Bar. | |||||
| Delaware | 7,500,000 | 0.09 | 0.09 | 0.28 | 9.17 | 817,491 | 12,000,000 | Geary Boulevard Improvements, San Francisco. | |||||
| District of Columbia | 55,000,000 | 0.64 | 0.65 | 0.19 | 97.62 | 563,384 | 10,000,000 | Construct highway connecting State Route 78/86 and State Route 111, Brawley. |
|||||
| Florida | 442,750,000 | 5.17 | 5.20 | 5.85 | 26.01 | 17,019,068 | 10,000,000 | Reconstruct the interchange of I-5 and Richards Blvd and
other improvements. |
|||||
| Georgia | 203,580,000 | 2.38 | 2.39 | 2.99 | 23.44 | 8,684,715 | 10,000,000 | The Foothill South Project will construct 16 miles of a
six lane limited access highway system. |
|||||
| Hawaii | 28,000,000 | 0.33 | 0.33 | 0.43 | 22.26 | 1,257,608 | 10,000,000 | Replacement of exisitng 2 lane interchange to full 6 lane
interchange where Cajalco Road and I-15 meet in Corona, CA. |
|||||
| Idaho | 23,500,000 | 0.27 | 0.28 | 0.47 | 17.20 | 1,366,332 | 10,000,000 | Golden Gate Bridge Seismic Retrofit | |||||
| Illinois | 437,240,000 | 5.10 | 5.13 | 4.35 | 34.55 | 12,653,544 | 10,000,000 | San Jose, I880/Coleman Avenue Interchange | |||||
| Indiana | 180,775,000 | 2.11 | 2.12 | 2.13 | 29.18 | 6,195,643 | 9,000,000 | Widen highway 101 and reconstruct offramps between Steel Lane & the town of Windsor |
|||||
| Iowa | 136,400,000 | 1.59 | 1.60 | 1.01 | 46.33 | 2,944,062 | 9,000,000 | Folsom Blvd and Power Inn Rd widening and Improvements | |||||
| Kansas | 95,000,000 | 1.11 | 1.11 | 0.94 | 34.88 | 2,723,507 | 8,500,000 | Pine Avenue extension from route 71 from Pomona
Rincon Road in the City of Chino. |
|||||
| Kentucky | 84,000,000 | 0.98 | 0.99 | 1.42 | 20.40 | 4,117,827 | 8,000,000 | Construct
bypass along California Hwy 101 around the town of Willits. |
|||||
| Louisiana | 145,650,000 | 1.70 | 1.71 | 1.55 | 32.39 | 4,496,334 | 8,000,000 | Upgrade and reconstruct the I-80/I-680/SR 12
Interchange, Solano County. |
|||||
| Maine | 58,700,000 | 0.69 | 0.69 | 0.45 | 44.96 | 1,305,728 | 8,000,000 | Realign California State Route 299 between the Trinity
County line and mile marker 7.4, Shasta County. |
|||||
| Maryland | 193,380,000 | 2.26 | 2.27 | 1.89 | 35.10 | 5,508,909 | 8,000,000 | Improvements for Folsom Boulevard between Rod
Beaudry Drive and Sunrise Boulevard. |
|||||
| Massachusetts | 159,900,000 | 1.87 | 1.88 | 2.21 | 24.85 | 6,433,422 | 8,000,000 | Widen State Route 112 to four lanes through Jamieson
Canyon (between Interstate 80 and SR 29). |
|||||
| Michigan | 245,910,000 | 2.87 | 2.89 | 3.47 | 24.40 | 10,079,985 | 7,500,000 | Upgrade San Fernando Road corridor to include
traffic calming measures, Los Angeles. |
|||||
| Minnesota | 197,400,000 | 2.30 | 2.32 | 1.74 | 39.02 | 5,059,375 | 7,500,000 | State Route 44 Interchange construction | |||||
| Mississippi | 97,000,000 | 1.13 | 1.14 | 0.99 | 33.67 | 2,881,281 | 7,300,000 | Replace SR22 Interchanges and Bridges, Garden Grove. | |||||
| Missouri | 191,000,000 | 2.23 | 2.24 | 1.96 | 33.48 | 5,704,484 | 7,036,110 | Eucalyptus/Peyton Drive intersection improvements in the
City of Chino Hills. |
|||||
| Montana | 50,000,000 | 0.58 | 0.59 | 0.32 | 54.49 | 917,621 | 7,000,000 | Reconstruction of Sheldon Road and SR 99 Interchange,
Elk Grove, CA. |
|||||
| Nebraska | 70,800,000 | 0.83 | 0.83 | 0.60 | 40.71 | 1,739,291 | 7,000,000 | Reconstruct Intersections at Highways 152 & 156,
Santa Clara County. |
|||||
| Nevada | 97,500,000 | 1.14 | 1.14 | 0.77 | 43.50 | 2,241,154 | 6,700,000 | 405 Freeway Widening. | |||||
| New Hampshire | 16,444,000 | 0.19 | 0.19 | 0.44 | 12.77 | 1,287,687 | 6,500,000 | Improve access roads to Beale Air Force Base (Spenceville, Smartville, Hammanton-Smartville, and North Beale Roads). | |||||
| New Jersey | 244,150,000 | 2.85 | 2.87 | 2.97 | 28.26 | 8,638,396 | 6,500,000 | Widen roads, construct bicycle lane and parking facility
to enhance access to Hansen Dam Recreation Area, Los Angeles. |
|||||
| New Mexico | 72,000,000 | 0.84 | 0.84 | 0.64 | 38.41 | 1,874,614 | 6,400,000 | State Route 67 (Mapleview to Dye Rd) Project
Studies/ Environmental Phase. |
|||||
| New York | 575,600,000 | 6.72 | 6.76 | 6.60 | 29.99 | 19,190,115 | 6,400,000 | State Route 52 East upgrade (SR 125 to SR 67). | |||||
| North Carolina | 217,275,000 | 2.54 | 2.55 | 2.89 | 25.84 | 8,407,248 | 6,000,000 | Replace South Access to Golden Gate Bridge, San Francisco. |
|||||
| North Dakota | 24,000,000 | 0.28 | 0.28 | 0.22 | 37.86 | 633,837 | 6,000,000 | Construct Silicon Valley Transportation Incident Management Center, San Jose. |
|||||
| Ohio | 317,567,000 | 3.71 | 3.73 | 3.93 | 27.77 | 11,435,798 | 6,000,000 | Improve farm to market roads in Tulare County. | |||||
| Oklahoma | 101,000,000 | 1.18 | 1.19 | 1.21 | 28.76 | 3,511,532 | 6,000,000 | Rosecrans Avenue/Aviation Boulevard/Douglas Street improvements to reduce congestion and improve traffic flow, El Segundo. |
|||||
| Oregon | 154,652,000 | 1.80 | 1.81 | 1.22 | 43.45 | 3,559,596 | 6,000,000 | Adds NB lane & auxiliary lanes on I-4 and widens I-8 west to I-5 north, San Diego | |||||
| Pennsylvania | 398,139,025 | 4.65 | 4.67 | 4.25 | 32.20 | 12,365,455 | 5,650,000 | I-5 CIP adds general purpose lanes, HOV lanes &
corridor arterial improvements from SR 91 to I-710 |
|||||
| Rhode Island | 22,000,000 | 0.26 | 0.26 | 0.37 | 20.44 | 1,076,164 | 5,630,000 | Widen & realign Cherry Avenue from 19th Street to one
block south of Pacific Coast Highway, Signal Hill. |
|||||
| South Carolina | 145,000,000 | 1.69 | 1.70 | 1.43 | 34.96 | 4,147,152 | 5,500,000 | Construct Coyote Creek Trail from Kelly Park to
Berryessa station, San Jose. |
|||||
| South Dakota | - | - | - | 0.26 | - | 764,309 | 5,500,000 | Construct Guadalupe River Trail project from highway 237 to I-880, San Jose. | |||||
| Tennessee | 195,800,000 | 2.29 | 2.30 | 2.01 | 33.52 | 5,841,748 | 5,000,000 | 8.5 miles of six and eight lane arterial roadways,
building an essential eastwest route across Santa Clarita Valley. |
|||||
| Texas | 674,500,000 | 7.87 | 7.92 | 7.61 | 30.49 | 22,118,509 | 5,000,000 | Construct Daggett Road and Bridge Project, Port of Stockton, CA. |
|||||
| Utah | 56,250,000 | 0.66 | 0.66 | 0.81 | 23.92 | 2,351,467 | 5,000,000 | Widening of State Route 76 from Melrose Drive to I-5. | |||||
| Vermont | 13,414,486 | 0.16 | 0.16 | 0.21 | 21.67 | 619,107 | 5,000,000 | Develop bicycle paths and public park space adjacent
to the New River, Calexico. |
|||||
| Virginia | 134,975,000 | 1.58 | 1.58 | 2.54 | 18.27 | 7,386,330 | 5,000,000 | Widen and reconstruct Arch-Sperry Road to improve connection between Interstate 5 and State Route 99, San Joaquin County. |
|||||
| Washington | 171,850,000 | 2.01 | 2.02 | 2.11 | 28.03 | 6,131,445 | 5,000,000 | Monterey Bay Sanctuary Scenic Tail - connect missing segments of a bike and pedestrian trail around the Monterey Bay National Marine Sanctuary. |
|||||
| West Virginia | 106,000,000 | 1.24 | 1.24 | 0.62 | 58.55 | 1,810,354 | 5,000,000 | Widen State Route 98 from Route 111 to State Route 7,
Calexico. |
|||||
| Wisconsin | 198,811,000 | 2.32 | 2.33 | 1.88 | 36.33 | 5,472,299 | 5,000,000 | Design and Implement Trails and Bikeway Plans for the
Golden Gate National Recreation Area and Presidio. |
|||||
| Wyoming | 10,000,000 | 0.12 | 0.12 | 0.17 | 19.95 | 501,242 | 5,000,000 | Construct Illinois Street Bridge/Amador Street Connection and Improvements, San Francisco. | |||||
| Puerto Rico | 10,000,000 | 0.12 | 5,000,000 | Planning, engineering, and construction of a tunnel on SR
75/282 to Naval Air Station, San Diego. |
|||||||||
| American Samoa | 14,000,000 | 0.16 | 5,000,000 | Upgrade Kanan Road interchange at US 101 (Aguora Hills) to improve safety and accessibility. | |||||||||
| Guam | 9,000,000 | 0.11 | 5,000,000 | For environmental review and preliminary engineering for a
freeway-to-freeway interchange connecting Interstate 5 to State Route 78. |
|||||||||
| N. Mariana Islands | - | - | 5,000,000 | Preparation of environmental documents and design for conversion of the reliquished railroad bridge over the Feather River between Yuba City and Marysville | |||||||||
| Virgin Islands | 14,000,000 | 0.16 | 5,000,000 | Alameda Co. Construct I580 Corr. HOV Projects | |||||||||
| 5,000,000 | Rancho Cucamonga, I-15 Base Line Interchange Aux lanes and ramps | ||||||||||||
| NOTE: House TEA LU bill authorizes $11.1 billion for HPPs over 6 years. The additional $2.5 billion above the amount spent (shown here) will be allocated at a later time. | 5,000,000 | Contra Costa County Brentwood Tracy Express way study and construct | |||||||||||
| 4,856,000 | Improvements to interchange between SR 23 and SR 101.
Could include wideing of SR 23 from 2 lanes to 3. |
||||||||||||
| 4,700,000 | Port of Hueneme Intermodal Access Improvement
Project including grade separaiton at Rice Avenue/State Route 34; road widening at Hueneme Road. |
||||||||||||
| Source: Federal Formula Grants and California Project, California Institute for Federal Policy Research, in Partnership with Public Policy Institute of California (PPIC), http://www.calinst.org | 4,644,000 | Utilize funds over
a four-year period to reconstruct and deep-lift asphalt on various roads thorughout the district in Santa Barbara County. |
|||||||||||
| 4,500,000 | Construciton of interchange at State Hwy 86 at Ave 66
in Coachella, CA. |
||||||||||||
| 4,400,000 | 4-lane overpass for Mission Blvd grade separation
project, City of Pomona. |
||||||||||||
| 4,240,000 | Realignment of La Brea Avenue to reduce congestion, Inglewood. |
||||||||||||
| 4,200,000 | Construct Route 101 Auxiliary Lanes 3rd Avenue in the
city of San Mateo to Millbrae Ave in Millbrae. |
||||||||||||
| 4,000,000 | Reconstruct and widen Garfield Ave bridge over Rio
Hondo River Channel and apply seismic improvements, South Gate. |
||||||||||||
| 4,000,000 | Reconstruct overcrossing and interchange at Interstate
10 & Tippacanoe Ave in Loma Linda. |
||||||||||||
| 4,000,000 | Construct truck lane from Britannia Blvd to the Otay
Mesa Port Entry, San Diego County. |
||||||||||||
| 4,000,000 | Construction of new freeway lanes, including HOV lanes
at US HWY 50 and Empire Ranch Road, Folsom,CA. |
||||||||||||
| 4,000,000 | Widen South Main Street/Soda Bay Road between CR 400A/miler marker 0.0-mile marker 0.7 and CR502/mile marker 0.0 and mile marker 0.9. |
||||||||||||
| 4,000,000 | Widen Avenue P to six lanes to alleviate trafic congestion in Palm Dale, CA. | ||||||||||||
| 4,000,000 | Bay Road improvements between Clarke Avenue and Cooley Landing. Northern access improvements between University and Illinois Avenue, East Palo Alto. |
||||||||||||
| 4,000,000 | Conduct Study and Construct McKinley Intechange at
SR 120 Project, Manteca, CA. |
||||||||||||
| 4,000,000 | SF, Implement ITS on Muni Transit | ||||||||||||
| 4,000,000 | I-5/SR-56 Connector | ||||||||||||
| 3,800,000 | Widen State Route 99 between Tulare and Kingsburg, CA. | ||||||||||||
| 3,750,000 | Improvements (including arterial streets rehabilitation)
to enhance traffic and pedestrian safety in Northridge, Granada Hills, and Porter Ranch, Los Angeles. |
||||||||||||
| 3,670,000 | Salinas Airport Boulevard/Hwy 101 interchange -- new 4 lane overpass with 2 lanes each direction, new approaches, new southbound on/off ramps, bicycle lanes. | ||||||||||||
| 3,670,000 | Santa Cruz Highway 1 widening and HOV Lanes | ||||||||||||
| 3,660,000 | Holllister SR25 widening --4 lane freeway between San
Felipe Road to the US 101 separation, Gilroy. |
||||||||||||
| 3,520,000 | Multi Year Riverside and Orange County Major investment Study and Phase work | ||||||||||||
| 3,500,000 | Construct Cypress Avenue over-pass to separate Interstate 10 and Union Pacific Railroad tracks, Fontana. |
||||||||||||
| 3,500,000 | Implement streetscape project on Central Avenue from 103rd Street to Watts/103rd Street Station , Watts. |
||||||||||||
| 3,500,000 | Santa Clara County, aux., bike and ped. Improvements-Almaden Expressway | ||||||||||||
| 3,400,000 | Widen Santa Maria River Bridge on U.S. Highway 101 between Santa Barbara County and San Luis Obispo Co. |
||||||||||||
| 3,250,000 | Improvements (including arterial street rehabilitation) to
enhance traffic and pedestrian safety in Reseda, Canoga Park, and Winnetka, Los Angeles. |
||||||||||||
| 3,250,000 | Diesel Emissions Reduction Program for Gateway
Cities Council of Governments. |
||||||||||||
| 3,000,000 | Improvements for the Watt Avenue corridor between Antelope Road and the Capital City Freeway. |
||||||||||||
| 3,000,000 | Resurface and construct truck lane at CA Hwy. 94 and Interstate 8 interchange, Boulevard. | ||||||||||||
| 3,000,000 | Construction of the improvements to the Western Placerville Interchanges on SR50 between the Missouri Flat Road Over-crossing and the Placerville Drive under-crossing in and near the City of Placerville in El Dorado C | ||||||||||||
| 3,000,000 | Construct off ramp at Interstate 8/Imperial Avenue Interchange, El Centro. |
||||||||||||
| 3,000,000 | Coastal Corridor Investments Phase II -A -
multi-modal improvements on Rosecrans Avenue between Sepulveda Blvd and I-405, El Segundo. |
||||||||||||
| 3,000,000 | Reconstruct and widen Del Mao Blvd to four lanes
between Normadie Ave andNew Hampshire Ave, Los Angeles County |
||||||||||||
| 3,000,000 | Gateway Cities intelligent management and logistics
freight movement measures |
||||||||||||
| 3,000,000 | Mitigate congestion & operation problems along Harbor Blvd. Between I-405 southbound offramp & Sunflower Ave. | ||||||||||||
| 3,000,000 | Intelligent Transportation Systems on Long Beach Boulevard, Compton Boulevard, Wilmington Avenue, Walnut Avenue incl. interface with the L.A. County ITS system. | ||||||||||||
| 3,000,000 | Widen State Route 98, including storm drain improvements, from Kloke Road to State Route 111, Calexico. | ||||||||||||
| 3,000,000 | Constructs a Highway and Railroad grade separation at
North Milliken Avenue, Ontario. |
||||||||||||
| 3,000,000 | Repair and replace tunnel lining on Kanan, Kanan Dume,
and Malibu Canyon Roads, Los Angeles County. |
||||||||||||
| 3,000,000 | Widen Washington Boulevard, Commerce. | ||||||||||||
| 3,000,000 | Reconstruct interchange with partial-cloverleaf on-rmap for south-bound traffic entering I-80 from Central Avenue, City of Richmond. | ||||||||||||
| 3,000,000 | Technical Feasibility Study for the 710 Tunnel to connect
the 710 to the 210. |
||||||||||||
| 3,000,000 | Provide widening of the exisitng two-lane railroad underpass on SR89 in Nevada County. | ||||||||||||
| 3,000,000 | Construct new ramps to Route 262, widen 262,
reconstruct railroad bridges, Fremont. |
||||||||||||
| 3,000,000 | Interchange improvements at Rice Avenue and US
Highway 101, City of Oxnard. |
||||||||||||
| 3,000,000 | Arcadia, Santa Anita Ave. Corridor Improvement project | ||||||||||||
| 3,000,000 | Placer County Ferrari Interchange Project | ||||||||||||
| 2,800,000 | Reconstruct interchange at I-10 and Riverside Avenue to
improve traffic, Rialto. |
||||||||||||
| 2,500,000 | Traffic signal upgrade, road configuration, and median
strip improvements to Lakewood Blvd between Telegraph Rd and Gardendale St, Downey. |
||||||||||||
| 2,500,000 | Mid
Valley Station Road and Inter-Modal Improvement Project. |
||||||||||||
| 2,500,000 | Will
add landscaping enhancements along the freeway for aesthetic purposes in Ventura County. |
||||||||||||
| 2,500,000 | Pasadena Multi-modal intelligent transportation
system: traffic management center upgrade, transit management system , parking guidance system, the City of Pasadena. |
||||||||||||
| 2,500,000 | Improve Glendale Freeway Terminus to provide
pedestrian access, construct sound barriers, and implement landscaping, Los Angeles. |
||||||||||||
| 2,500,000 | Reconstruct segments of Hollister Avenue between San Antonio Road and State Route 154, Santa Barbara County. |
||||||||||||
| 2,500,000 | Transportation enhancements on Slauson Ave and
Atlantic Blvd, Maywood. |
||||||||||||
| 2,500,000 | Construct a 2.8 mile bikeway, working in conjuction with
the City of La Habra, along Lambert Road from Mills Ave to Valley Home Ave. |
||||||||||||
| 2,500,000 | Construct truck lane on Keystone Road from State Route 111 to Austin Road, Imperial County. | ||||||||||||
| 2,500,000 | I-880 Federal highway safety improvements, High Street to
I-980, Oakland. |
||||||||||||
| 2,500,000 | Imperial Co. I8 Widening overpass at Dogwood Rd. | ||||||||||||
| 2,500,000 | Downey, Fiestone Blvd. Widen and add turn lane | ||||||||||||
| 2,500,000 | City of Livermore, Upgrad and Reconstruct 1580/Vasco Rd. Interchange | ||||||||||||